Upload Button Icon Add office photos

Filter interviews by

Zenom Solar Power Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. 1.cable tery type. 2. Test perfom at C.T 3. HT and LT bracker 4.SeF Ref protection
  • Q2. Type of cable tray and their saport
  • Ans. 

    Different types of cable trays include ladder, perforated, solid bottom, wire mesh, and trough.

    • Ladder cable trays have horizontal cross members resembling a ladder.

    • Perforated cable trays have small holes for ventilation and drainage.

    • Solid bottom cable trays have a solid base for supporting cables.

    • Wire mesh cable trays have a grid-like structure for easy cable installation.

    • Trough cable trays have a U-shaped design for c

  • Answered by AI
  • Q3. Rule of cable laying.
  • Ans. 

    The rule of cable laying involves proper planning, routing, securing, and labeling of cables to ensure safety and efficiency.

    • Plan the cable routes to avoid interference with other systems or equipment.

    • Secure cables properly to prevent damage or accidents.

    • Label cables clearly for easy identification and maintenance.

    • Follow local regulations and standards for cable laying practices.

    • Consider factors like cable length, bend...

  • Answered by AI
  • Q4. What is anty carosan pest
  • Ans. 

    Anticarsia gemmatalis, also known as the velvetbean caterpillar, is a common pest in agriculture.

    • Anticarsia gemmatalis is a species of moth in the family Erebidae.

    • It is a major pest of soybean crops, feeding on the leaves and causing significant damage.

    • Control measures for velvetbean caterpillars include biological control agents, insecticides, and crop rotation.

    • Monitoring for early signs of infestation can help preven

  • Answered by AI
  • Q5. Tell about GA drawings
  • Ans. 

    General Arrangement drawings show the overall layout of electrical systems in a building or structure.

    • GA drawings provide an overview of the entire electrical system layout

    • They include details such as equipment locations, cable routing, and connection points

    • These drawings are essential for understanding the overall design and installation of electrical systems

    • Examples of GA drawings include floor plans with electrical ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If learn power plant, than join UPL .
Joint venture

I applied via Approached by Company and was interviewed before Jun 2020. There were 2 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Power factor corection methods Load flow analysis Different type of transformer test
  • Ans. 

    Power factor correction methods, load flow analysis, and different types of transformer tests are important topics in operations management.

    • Power factor correction methods are used to improve the power factor of electrical systems, which helps in reducing energy losses and improving efficiency.

    • Load flow analysis is a technique used to study the flow of power in an electrical network, helping in determining voltage leve...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Power Delhi Distribution Operations Manager interview:
  • Electeical
  • Cyme
Interview preparation tips for other job seekers - Read power system analysis

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Asked about the Solar O&M briefly
  • Q2. Related to job responsibilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep update the resume daily in Naukri portal and chances to get more calls from the companies
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the process de-ashing the from esp to silo.
  • Ans. 

    De-ashing process from ESP to silo involves several steps.

    • The ash is collected in hoppers located at the bottom of the ESP.

    • The ash is then transported to the silo using a pneumatic conveying system.

    • The ash is stored in the silo until it can be disposed of properly.

    • Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.

    • Proper safety measures must be taken during the de-a

  • Answered by AI
  • Q2. What is the capacity of esp hoppers.
  • Ans. 

    The capacity of ESP hoppers varies depending on the size and model of the equipment.

    • ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.

    • The capacity can also depend on the type of material being collected in the hopper.

    • It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. I will pay you only this.

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst things going inside the company they just making everyone life & growth in danger.

I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself , and why did you choose civil engineering
Round 2 - Technical 

(1 Question)

  • Q1. Some questions related to my internships, reinforcement details , and some related to rebars

Interview Preparation Tips

Topics to prepare for Assystem Graduate Engineer Trainee (Get) interview:
  • Reinforcement
  • Water Treatment Plant
Interview preparation tips for other job seekers - Be thorough with your internship works , and be strong with your basics, and the other thing is you must be very confident while answering

I applied via Company Website and was interviewed in Jan 2022. There were 5 interview rounds.

Round 1 - Technical 

(10 Questions)

  • Q1. As for drawing work and excavation work
  • Q2. Excavation proper level and drawing work
  • Q3. Level and coordinate proper work
  • Q4. Drawing for BBS and shuttering work
  • Q5. Management rebar and shuttering
  • Q6. As for drawing work and drawing proper seen
  • Q7. Work in experience 3 years
  • Q8. DPR and work timely and work Target
  • Q9. Dailly duty and emergency work holidays
  • Q10. Concrete work level and finishing work fine
  • Ans. 

    My concrete work level is excellent and I have experience in various finishing techniques.

    • I have experience in pouring and leveling concrete for foundations, walls, and slabs.

    • I am skilled in using various finishing techniques such as troweling, stamping, and staining.

    • I pay close attention to detail to ensure a smooth and even finish.

    • I am knowledgeable in the proper curing and sealing of concrete to ensure its longevity...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Rebar and shuttering work
Round 3 - Technical 

(1 Question)

  • Q1. BBS for drwaing work
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.

    • BBS is used in drawing work to ensure the correct amount of reinforcement is used in a structure.

    • It includes details such as bar diameter, length, shape, and placement.

    • BBS helps in estimating the amount of steel required for a project and also helps in cost estimation.

    • It is an important part of the construction process an...

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. Rebar and shuttering work
Round 5 - Technical 

(2 Questions)

  • Q1. Drawing for level and Finnish
  • Q2. Coordinate proper and management

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil engineer work Reinforcement and shuttering and concrete work

I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Which method following in store
  • Ans. Material received & issue in system, documents verification,mis report, inventory management,
  • Answered Anonymously
  • Q2. Which system use in previous company?
  • Ans. 

    We used an ERP system called SAP in my previous company.

    • Previous company used SAP as the primary system.

    • SAP helped in streamlining business processes and improving efficiency.

    • It integrated various departments like finance, HR, and supply chain.

    • SAP provided real-time data and analytics for informed decision-making.

    • Employees were trained to use SAP for their respective roles.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best policy & rools regulations,
Vision and mission are Great,
Work sop best policy
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. How do you manage channel marketing?
  • Ans. 

    I manage channel marketing by developing strategies, analyzing data, and collaborating with cross-functional teams.

    • Developing and executing channel marketing strategies

    • Analyzing data to measure effectiveness and optimize campaigns

    • Collaborating with cross-functional teams to ensure alignment and maximize impact

    • Managing budgets and resources to achieve goals

    • Staying up-to-date with industry trends and best practices

    • Exampl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with subject knowledge. Company is open to hire good people.

I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Why you are leaving your previous company ?
  • Ans. 

    Seeking new challenges and growth opportunities.

    • Looking for a company that aligns better with my career goals.

    • Desire to work on more complex projects.

    • Seeking a better work-life balance.

    • Company downsizing or restructuring.

    • Limited opportunities for advancement or professional development.

    • Relocation or personal reasons.

  • Answered by AI
  • Q2. Technical skill questions?
  • Ans. Need to know all testing about electrical equipment
  • Answered Anonymously
  • Q3. Testing about all electrical equipment ?
  • Q4. Relay testing questions?
  • Q5. Drwaing related questions?
  • Q6. CT knee point voltage

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be positive and confident own yourself and need to know all testing and erection related answers.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. On resume related, GD & T, compressor basics

Interview Preparation Tips

Interview preparation tips for other job seekers - Study your own resume. Gd &T, compressor basics

Tell us how to improve this page.

Interview Questions from Similar Companies

Vestas Interview Questions
4.3
 • 81 Interviews
ReNew Interview Questions
4.2
 • 80 Interviews
Jakson Group Interview Questions
4.3
 • 74 Interviews
Wind World Interview Questions
3.9
 • 70 Interviews
Siemens Energy Interview Questions
4.2
 • 67 Interviews
Waaree Energies Interview Questions
3.9
 • 54 Interviews
Greenko Group Interview Questions
3.8
 • 44 Interviews
View all

Zenom Solar Power Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

4.0

Skill development

2.0

Work-Life balance

2.0

Salary & Benefits

2.0

Job Security

1.0

Company culture

1.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 3 Reviews and Ratings
Compare Zenom Solar Power with

Jakson Group

4.3
Compare

ReNew

4.2
Compare

Vestas

4.3
Compare

Wind World

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview