Filter interviews by
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
The unit of current is Ampere (A).
The unit of current is a measure of the flow of electric charge.
It represents the rate at which electric charges pass through a given point in a circuit.
Current is measured using an ammeter.
The SI unit for current is Ampere (A).
The question is not relevant to the job position of Process Engineer.
The question is not related to the job responsibilities of a Process Engineer.
The amount of electricity available in a house is not relevant to the job.
The question may be better suited for an electrician or energy specialist.
I applied via Campus Placement and was interviewed before Jun 2020. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed before Jan 2024. There was 1 interview round.
Series circuits have one path for current flow, while parallel circuits have multiple paths.
Series circuits have the same current flowing through all components.
Parallel circuits have different currents flowing through each branch.
In series circuits, if one component fails, the entire circuit fails.
In parallel circuits, if one component fails, the other branches can still function.
Examples: Christmas lights are often c...
An inverter is a device that converts direct current (DC) to alternating current (AC) for use in electrical systems.
Converts DC to AC power
Used in solar power systems to convert DC power from solar panels to AC power for use in homes
Commonly used in uninterruptible power supplies (UPS) to provide backup power during outages
I applied via Campus Placement and was interviewed in Dec 2022. There were 3 interview rounds.
1 year experience certificate
Modling in injector is a process used in manufacturing to create complex shapes by injecting molten material into a mold.
Modling in injector is commonly used in industries such as automotive, aerospace, and consumer goods.
The process involves heating the material until it becomes molten and then injecting it into a mold cavity.
The material solidifies inside the mold, taking the shape of the cavity.
Examples of materials...
Machine operation in cutting in nozzle body horizontal and vertical side.
The machine should be set up to cut the nozzle body horizontally and vertically.
The cutting process should be precise and accurate to ensure proper functionality of the nozzle.
Proper safety measures should be followed during the operation.
Regular maintenance and calibration of the machine is necessary to maintain cutting quality.
Examples of machin...
I was interviewed in Jul 2017.
I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.
Kaizen is a Japanese term for continuous improvement and 7QC tools are quality control techniques used to identify and solve problems.
Kaizen involves making small, incremental improvements to processes and systems to increase efficiency and reduce waste.
7QC tools include Pareto charts, cause-and-effect diagrams, flowcharts, histograms, scatter diagrams, control charts, and check sheets.
These tools are used to analyze d...
8D analysis, Six Sigma, and SPC are quality control methodologies used in production engineering.
8D analysis is an eight-step problem-solving methodology used to identify, correct, and prevent recurring problems.
Six Sigma is a data-driven approach to quality control that aims to reduce defects and improve processes.
SPC (Statistical Process Control) is a method of monitoring and controlling a process to ensure it operat...
OEE is a metric used to measure manufacturing productivity. 5 types of wastes are defects, overproduction, waiting, non-utilized talent, and transportation.
OEE stands for Overall Equipment Effectiveness and is a measure of how effectively a manufacturing operation is utilized
It is calculated by multiplying availability, performance, and quality
The 5 types of wastes are defects, overproduction, waiting, non-utilized tal...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.
Basic question asked in every company
I applied via Referral and was interviewed in Sep 2020. There were 3 interview rounds.
posted on 4 Feb 2022
Productivity can be improved by optimizing processes, utilizing technology, and investing in employee training.
Streamline processes to eliminate inefficiencies
Implement technology to automate tasks and increase accuracy
Provide training and development opportunities to enhance skills and knowledge
Set clear goals and expectations for employees
Encourage collaboration and communication among team members
6S is a methodology used to organize and improve the workplace by eliminating waste and improving efficiency.
6S stands for Sort, Set in Order, Shine, Standardize, Sustain, and Safety.
It is commonly used in manufacturing and production environments.
The goal of 6S is to create a clean, organized, and efficient workplace that promotes safety and productivity.
Examples of 6S implementation include organizing tools and equip...
based on 13 reviews
Rating in categories
Junior Engineer
506
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
391
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
293
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
290
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
268
salaries
| ₹0 L/yr - ₹0 L/yr |
Sumitomo Electric Industries
TE Connectivity
Delphi Automotive Systems
Molex