Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed in Oct 2022. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
Explanation of how to calculate OEE, use 7QC tools, TMP, productivity, team building, manpower management, SAP module, inventory control, and scrap reduction.
OEE calculation involves multiplying availability, performance, and quality percentages
7QC tools include Pareto chart, fishbone diagram, control chart, etc.
TMP stands for Total Maintenance Productivity and measures maintenance efficiency
Productivity can be calcula...
I applied via Recruitment Consultant and was interviewed in Dec 2020. There was 1 interview round.
Productivity in business refers to the efficiency and effectiveness of the production process.
Productivity is the measure of output per unit of input.
It is important for businesses to maximize productivity to increase profits and remain competitive.
Factors that can affect productivity include technology, employee training, and management practices.
Examples of productivity measures include units produced per hour, reven...
Yazaki interview questions for designations
Top trending discussions
I was interviewed in Jul 2017.
I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.
Kaizen is a Japanese term for continuous improvement and 7QC tools are quality control techniques used to identify and solve problems.
Kaizen involves making small, incremental improvements to processes and systems to increase efficiency and reduce waste.
7QC tools include Pareto charts, cause-and-effect diagrams, flowcharts, histograms, scatter diagrams, control charts, and check sheets.
These tools are used to analyze d...
8D analysis, Six Sigma, and SPC are quality control methodologies used in production engineering.
8D analysis is an eight-step problem-solving methodology used to identify, correct, and prevent recurring problems.
Six Sigma is a data-driven approach to quality control that aims to reduce defects and improve processes.
SPC (Statistical Process Control) is a method of monitoring and controlling a process to ensure it operat...
OEE is a metric used to measure manufacturing productivity. 5 types of wastes are defects, overproduction, waiting, non-utilized talent, and transportation.
OEE stands for Overall Equipment Effectiveness and is a measure of how effectively a manufacturing operation is utilized
It is calculated by multiplying availability, performance, and quality
The 5 types of wastes are defects, overproduction, waiting, non-utilized tal...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Referral and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.
Basic question asked in every company
based on 12 interviews
1 Interview rounds
based on 96 reviews
Rating in categories
Junior Engineer
508
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
395
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
293
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
289
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
258
salaries
| ₹0 L/yr - ₹0 L/yr |
Sumitomo Electric Industries
TE Connectivity
Delphi Automotive Systems
Molex