i
Welspun Enterprises
Filter interviews by
Top trending discussions
posted on 26 Jul 2024
The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)
The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for medium strength concrete.
For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.
As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.
Assisted senior engineers in project planning and design
Participated in site visits and inspections
Prepared project reports and documentation
Collaborated with team members and contractors
Ensured compliance with safety regulations and quality standards
Managed site operations, coordinated with contractors, ensured compliance with safety regulations.
Managed day-to-day site operations
Coordinated with contractors for timely completion of projects
Ensured compliance with safety regulations and quality standards
Prepared progress reports and communicated with stakeholders
Implemented cost-saving measures without compromising quality
The name of the client is XYZ Construction Company.
XYZ Construction Company is a well-known construction firm in the region.
They have completed several projects in the past, including the construction of a new office building in downtown.
The client has a reputation for high-quality work and timely project completion.
posted on 20 Jun 2024
Hydraulic refers to the study of fluids in motion and the engineering applications of fluid mechanics.
Hydraulic engineering involves the design and construction of structures that control the flow and pressure of liquids, such as dams, canals, and pipelines.
Hydraulic systems use fluid pressure to generate, control, and transmit power, commonly found in machinery like hydraulic lifts and brakes.
Hydraulic principles are ...
posted on 23 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
Unit weight of steel is typically around 7850 kg/m^3.
Unit weight of steel is commonly used in civil engineering for calculating the weight of steel structures.
The unit weight of steel is typically around 7850 kg/m^3.
This value may vary slightly depending on the specific type of steel being used.
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
posted on 23 Jan 2022
I applied via Approached by company and was interviewed in Dec 2021. There was 1 interview round.
Answering questions related to concrete mix, IS codes, cement setting time, clear cover, transition curve, supervisor elevation, pavement design, and beam cover.
Mix ratio of concrete is the proportion of cement, sand, and aggregate used in the mixture.
IS codes are Indian Standards codes that provide guidelines for construction materials and practices.
Setting time of cement is the time taken by cement to harden and gain...
I applied via campus placement at Vani Vidya Bithi, Kolkata and was interviewed in Mar 2024. There were 2 interview rounds.
Aptitude, verbal, core, logical questions
BMD of a frame refers to the bending moment diagram which shows the variation of bending moment along the length of a structural frame.
BMD is a graphical representation of the variation of bending moment in a structural frame.
It helps in analyzing the internal forces and stresses in the frame.
BMD is typically plotted with the bending moment on the y-axis and the length of the frame on the x-axis.
The BMD can be used to ...
Base pressure diagram of foundation shows the distribution of pressure on the foundation base.
Base pressure diagram helps in understanding how the load is distributed on the foundation base.
It is important for designing foundations to ensure they can support the load effectively.
The diagram typically shows higher pressure under the columns and lower pressure in between.
It is used to determine the size and depth of the ...
posted on 26 Jul 2024
The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)
The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for medium strength concrete.
For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.
As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.
Assisted senior engineers in project planning and design
Participated in site visits and inspections
Prepared project reports and documentation
Collaborated with team members and contractors
Ensured compliance with safety regulations and quality standards
Managed site operations, coordinated with contractors, ensured compliance with safety regulations.
Managed day-to-day site operations
Coordinated with contractors for timely completion of projects
Ensured compliance with safety regulations and quality standards
Prepared progress reports and communicated with stakeholders
Implemented cost-saving measures without compromising quality
The name of the client is XYZ Construction Company.
XYZ Construction Company is a well-known construction firm in the region.
They have completed several projects in the past, including the construction of a new office building in downtown.
The client has a reputation for high-quality work and timely project completion.
posted on 13 Jan 2024
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
posted on 18 Oct 2024
I applied via Recruitment Consulltant
Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.
Establishing quality control procedures and protocols
Regular inspections and testing of materials and workmanship
Training and educating staff on quality standards
Implementing corrective actions when deviations are identified
Utilizing quality control tools such as checklists
BBS in code refers to Bar Bending Schedule as per Indian standards.
BBS stands for Bar Bending Schedule.
It is a detailed list of reinforcement bars to be used in a construction project.
It includes information on bar sizes, shapes, quantities, and placement.
BBS is prepared as per the requirements of Indian standards like IS 2502:1963.
It helps in ensuring proper reinforcement placement and quantity in the structure.
based on 1 review
Rating in categories
Assistant Manager
86
salaries
| ₹6 L/yr - ₹15.2 L/yr |
Senior Engineer
64
salaries
| ₹5.2 L/yr - ₹10.3 L/yr |
Assistant Engineer
39
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Project Engineer
33
salaries
| ₹4.4 L/yr - ₹7.5 L/yr |
Deputy Manager
32
salaries
| ₹11 L/yr - ₹16.5 L/yr |
Adani Enterprises
Larsen & Toubro Limited
Tata Projects
GMR Group