Filter interviews by
I applied via Walk-in
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.
Production is the process of creating goods or services using resources like labor, machinery, and materials.
Production can be classified into three main types: job production, batch production, and mass production.
Job production involves producing custom-made products one at a time, such as tailor-made clothing.
Batch production involves producing a specific quantity of identical products at a time, such as baking a ba...
Types of welding include MIG, TIG, stick, and flux-cored. Measurement instruments include calipers, micrometers, and rulers.
Types of welding: MIG, TIG, stick, flux-cored
Measurement instruments: calipers, micrometers, rulers
Designed a smart irrigation system using IoT technology
Utilized sensors to measure soil moisture levels
Implemented a microcontroller to control water flow based on sensor data
Developed a mobile app for users to monitor and adjust irrigation settings remotely
I applied via Referral
B.E final project discussion
We are discussed with all staff on current project, customer demand,internal problems, solution
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Core tools of IATF include PPAP, SPC, MSA, FMEA, APQP, 7QC tools, 8D.
PPAP (Production Part Approval Process) ensures that all customer requirements are understood and met.
SPC (Statistical Process Control) monitors and controls the quality of a process.
MSA (Measurement System Analysis) evaluates the measurement system's ability to provide accurate and reliable data.
FMEA (Failure Mode and Effects Analysis) identifies pot...
A control plan is a document that outlines the steps to be taken to ensure quality standards are met during production.
It is a proactive approach to quality control
It identifies potential issues and outlines steps to prevent them
It includes details on inspection and testing procedures
It helps ensure consistency in product quality
Examples include process flow diagrams, FMEA, and control charts
APQP is a structured approach to product and process design that ensures customer satisfaction and reduces risks.
APQP stands for Advanced Product Quality Planning
It is a process used in the automotive industry but can be applied to other industries as well
It involves five phases: planning, product design and development, process design and development, product and process validation, and launch, assessment and feedback
...
Wadhokar interview questions for popular designations
I applied via Referral and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
I implemented several Kaizens in my last company to improve efficiency and productivity.
Implemented a visual management system to track project progress and identify bottlenecks.
Introduced a standardized work process to reduce errors and improve quality.
Implemented a 5S system to organize the workspace and improve efficiency.
Implemented a suggestion system to encourage employees to share ideas for process improvement.
I...
Welding defects are imperfections that occur during the welding process. Common defects include porosity, cracks, and incomplete fusion.
Porosity: caused by gas entrapment in the weld pool, can be prevented by proper shielding gas and electrode selection
Cracks: caused by excessive stress or improper cooling, can be prevented by controlling heat input and using preheat/ post-weld heat treatment
Incomplete fusion: caused b...
Pareto principle is an economic theory that states 80% of the effects come from 20% of the causes.
Also known as the 80/20 rule
Named after Italian economist Vilfredo Pareto
Applied in various fields such as business, economics, and quality control
Example: 80% of a company's profits come from 20% of its customers
Bar chart displays categorical data while histogram displays continuous data.
Bar chart has discrete categories on x-axis while histogram has continuous range of values.
Bar chart is used to compare different categories while histogram is used to show distribution of data.
Bar chart has gaps between bars while histogram has no gaps.
Example of bar chart: Number of students in each grade level. Example of histogram: Distrib
As a Senior Engineer, my role is to lead and oversee technical projects, mentor junior engineers, and ensure the successful delivery of high-quality software solutions.
Leading and managing technical projects
Providing technical guidance and mentorship to junior engineers
Collaborating with cross-functional teams to define project requirements and deliverables
Designing and implementing software solutions
Conducting code re...
Top trending discussions
I applied via Company Website and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Aptitude round consists Logical reasoning, General Aptitude, Grammar related questions etc. All are moderate level questions.
OOPs is a programming paradigm that uses objects to represent real-world entities. Java is an OOPs language.
OOPs stands for Object-Oriented Programming System
Java is a class-based OOPs language
Encapsulation, Inheritance, Polymorphism, and Abstraction are the four pillars of OOPs
Objects have state and behavior
Java supports interfaces, which allow for multiple inheritance
Example: A car can be represented as an object wit...
Java solves machine dependency by using bytecode and virtual machine.
Java code is compiled into bytecode which is platform-independent
The bytecode is executed by the Java Virtual Machine (JVM) which is platform-specific
JVM translates bytecode into machine code for the specific platform
This allows Java code to run on any platform with a JVM installed
Example: A Java program compiled on Windows can run on Linux or Mac as
The duration of Wadhokar interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 6 interviews
Interview experience
based on 73 reviews
Rating in categories
Quality Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
new Product Development Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Quality Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Development Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
TCS
Infosys
Wipro
HCLTech