Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Core tools of IATF include PPAP, SPC, MSA, FMEA, APQP, 7QC tools, 8D.
PPAP (Production Part Approval Process) ensures that all customer requirements are understood and met.
SPC (Statistical Process Control) monitors and controls the quality of a process.
MSA (Measurement System Analysis) evaluates the measurement system's ability to provide accurate and reliable data.
FMEA (Failure Mode and Effects Analysis) identifies pot...
A control plan is a document that outlines the steps to be taken to ensure quality standards are met during production.
It is a proactive approach to quality control
It identifies potential issues and outlines steps to prevent them
It includes details on inspection and testing procedures
It helps ensure consistency in product quality
Examples include process flow diagrams, FMEA, and control charts
APQP is a structured approach to product and process design that ensures customer satisfaction and reduces risks.
APQP stands for Advanced Product Quality Planning
It is a process used in the automotive industry but can be applied to other industries as well
It involves five phases: planning, product design and development, process design and development, product and process validation, and launch, assessment and feedback
...
I applied via Walk-in
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.
Production is the process of creating goods or services using resources like labor, machinery, and materials.
Production can be classified into three main types: job production, batch production, and mass production.
Job production involves producing custom-made products one at a time, such as tailor-made clothing.
Batch production involves producing a specific quantity of identical products at a time, such as baking a ba...
Types of welding include MIG, TIG, stick, and flux-cored. Measurement instruments include calipers, micrometers, and rulers.
Types of welding: MIG, TIG, stick, flux-cored
Measurement instruments: calipers, micrometers, rulers
Designed a smart irrigation system using IoT technology
Utilized sensors to measure soil moisture levels
Implemented a microcontroller to control water flow based on sensor data
Developed a mobile app for users to monitor and adjust irrigation settings remotely
I applied via Referral
B.E final project discussion
We are discussed with all staff on current project, customer demand,internal problems, solution
Wadhokar interview questions for popular designations
I applied via Referral and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
I implemented several Kaizens in my last company to improve efficiency and productivity.
Implemented a visual management system to track project progress and identify bottlenecks.
Introduced a standardized work process to reduce errors and improve quality.
Implemented a 5S system to organize the workspace and improve efficiency.
Implemented a suggestion system to encourage employees to share ideas for process improvement.
I...
Welding defects are imperfections that occur during the welding process. Common defects include porosity, cracks, and incomplete fusion.
Porosity: caused by gas entrapment in the weld pool, can be prevented by proper shielding gas and electrode selection
Cracks: caused by excessive stress or improper cooling, can be prevented by controlling heat input and using preheat/ post-weld heat treatment
Incomplete fusion: caused b...
Pareto principle is an economic theory that states 80% of the effects come from 20% of the causes.
Also known as the 80/20 rule
Named after Italian economist Vilfredo Pareto
Applied in various fields such as business, economics, and quality control
Example: 80% of a company's profits come from 20% of its customers
Bar chart displays categorical data while histogram displays continuous data.
Bar chart has discrete categories on x-axis while histogram has continuous range of values.
Bar chart is used to compare different categories while histogram is used to show distribution of data.
Bar chart has gaps between bars while histogram has no gaps.
Example of bar chart: Number of students in each grade level. Example of histogram: Distrib
As a Senior Engineer, my role is to lead and oversee technical projects, mentor junior engineers, and ensure the successful delivery of high-quality software solutions.
Leading and managing technical projects
Providing technical guidance and mentorship to junior engineers
Collaborating with cross-functional teams to define project requirements and deliverables
Designing and implementing software solutions
Conducting code re...
Top trending discussions
posted on 2 Jul 2022
posted on 21 Mar 2025
I appeared for an interview in Feb 2025, where I was asked the following questions.
As an Assistant Manager, I oversee team operations, ensure project deadlines are met, and facilitate communication between departments.
Manage a team of 10 employees, providing guidance and support to enhance productivity.
Coordinate cross-departmental projects, such as the recent product launch that increased sales by 20%.
Conduct performance reviews and provide constructive feedback to team members.
Implement process imp...
I appeared for an interview before Mar 2024, where I was asked the following questions.
I have over five years of experience in management, focusing on team leadership and project execution in various industries.
Led a team of 10 in a retail environment, improving sales by 20% through effective training and motivation.
Managed a project that streamlined operations, reducing costs by 15% and increasing efficiency.
Implemented a new customer feedback system that enhanced service quality and customer satisfacti...
The duration of Wadhokar interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 6 interviews
Interview experience
based on 75 reviews
Rating in categories
Quality Engineer
41
salaries
| ₹1.8 L/yr - ₹4 L/yr |
new Product Development Engineer
28
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Production Engineer
23
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Senior Quality Engineer
10
salaries
| ₹3 L/yr - ₹7 L/yr |
Senior Development Engineer
9
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Caparo Engineering India
Marelli
Jtekt Sona Automotive India
Sata Vikas India