Upload Button Icon Add office photos

Filter interviews by

Waaree Group Project Manager Interview Questions and Answers

Updated 3 May 2024

Waaree Group Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Its nice and simple
  • Q2. Explained past experience
Round 2 - HR 

(1 Question)

  • Q1. Background verification, CTC discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - good experience

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is a HVDC system?
  • Ans. 

    HVDC stands for High Voltage Direct Current. It is a system used for transmitting high voltage electricity over long distances.

    • HVDC systems are used to transmit electricity over long distances with minimal losses.

    • They are more efficient than traditional AC systems for long-distance transmission.

    • HVDC systems use converters to convert AC power to DC power and vice versa.

    • Examples of HVDC systems include the Itaipu HVDC sy...

  • Answered by AI
  • Q2. What is rectifier
  • Ans. 

    A rectifier is an electronic device that converts AC to DC.

    • Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.

    • They can be made using diodes or other semiconductor devices.

    • Rectifiers are essential for many electronic devices to function properly.

    • Examples of rectifiers include bridge rectifiers, half-wave rectifiers, and full-wave rectifiers.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have patience. Its good to say no if you don't know really. Don't try to make fool

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Modules tech knowledge
Round 2 - HR 

(1 Question)

  • Q1. Personal info, pay and perks

Interview Preparation Tips

Interview preparation tips for other job seekers - Have depth knowledge about the post you are applied

I was interviewed in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions
Round 1 - Personal Interview 

(1 Question)

  • Q1. Are you satisfied with management view on cost cutting?
  • Ans. 

    I am satisfied with management's view on cost cutting as they have implemented effective strategies to reduce expenses without compromising quality.

    • Management has successfully implemented cost cutting measures without affecting the quality of products or services

    • They have involved employees in the cost cutting process to gather valuable insights and suggestions

    • Management regularly reviews and adjusts cost cutting strat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For the company, employees not a asset,it's a cost center only

I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions were based on past work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Just focus on basic and be confident of what you are doing in your current position.

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

It was easy if you have practice

Round 3 - Technical 

(3 Questions)

  • Q1. It was difficult. Questions were highly technical . Revise basic concepts for thermodynamics , heat transfer.
  • Q2. Critical point of water
  • Ans. 

    Critical point of water is the temperature and pressure at which liquid and gas phases of water become indistinguishable.

    • Critical point of water is at 647 K temperature and 22.064 MPa pressure.

    • At critical point, water can exist as both liquid and gas phases simultaneously.

    • Above critical point, water cannot exist in liquid state regardless of pressure.

    • Critical point is important in chemical and industrial processes such...

  • Answered by AI
  • Q3. Purification process of water
  • Ans. 

    Purification process of water involves removing impurities and contaminants to make it safe for consumption.

    • Physical processes like sedimentation, filtration, and distillation are used to remove impurities.

    • Chemical processes like chlorination and ozonation are used to kill bacteria and viruses.

    • Advanced technologies like reverse osmosis and ultraviolet radiation are also used for purification.

    • The quality of water after ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Thermax Limited Project Manager interview:
  • Heat Transfer
  • Thermodynamics
  • Boiler Operations
Interview preparation tips for other job seekers - Get your basic concepts clear and perform your best.

I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Experience related questions Materials selection, material properties Types of hardwares, bolted joints types
Round 3 - Technical 

(1 Question)

  • Q1. Model test on Autodesk Inventor
Round 4 - HR 

(1 Question)

  • Q1. CTC Related discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with you resume/ CV questions more related to resume and experience
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why are you lookig for change
Round 3 - One-on-one 

(1 Question)

  • Q1. What are your aspirations

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Organization and they look for candidates with stability
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. All over Transformer testing regarding
  • Q2. Fully Explain string & central inverter and Transformer
  • Ans. 

    String & central inverters are types of solar inverters used in solar power systems. Transformers are used to step up or step down voltage in electrical systems.

    • String inverters are used in smaller solar power systems and convert DC power from solar panels into AC power for use in the home.

    • Central inverters are used in larger solar power systems and are connected to multiple strings of solar panels to convert DC power ...

  • Answered by AI
  • Q3. Lt & ht cable regarding question
  • Q4. Explain Hari Transformer unloading?
  • Ans. 

    Hari Transformer unloading involves safely removing transformers from trucks and placing them in designated areas.

    • Ensure proper safety measures are in place before unloading transformers

    • Use appropriate equipment such as cranes or forklifts to lift and move the transformers

    • Follow manufacturer's guidelines for handling and placement of transformers

    • Inspect transformers for any damage during unloading process

    • Coordinate wit...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Acme Cleantech Solutions Assistant Manager interview:
  • inverter
  • Transformers

Skills evaluated in this interview

Waaree Group Interview FAQs

How many rounds are there in Waaree Group Project Manager interview?
Waaree Group interview process usually has 2 rounds. The most common rounds in the Waaree Group interview process are Technical and HR.
What are the top questions asked in Waaree Group Project Manager interview?

Some of the top questions asked at the Waaree Group Project Manager interview -

  1. Background verification, CTC discuss...read more
  2. Its nice and sim...read more

Tell us how to improve this page.

Waaree Group Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Production Engineer
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Engineer
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Waaree Group with

Adani Green Energy

4.1
Compare

Vikram Solar

3.9
Compare

Azure Power

3.9
Compare

Hero Future Energies

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview