Tools for creating BOQ and costing include software like Excel, specialized construction estimating software, and online tools.
Use Excel spreadsheets to organize and calculate quantities and costs
Utilize specialized construction estimating software like ProEst or Clear Estimates
Online tools such as PlanSwift or CostCertified can also help in creating BOQ and costing
Consider using Building Information Modeling (BIM) sof
Identify extra items by conducting site inspections and reviewing project plans. Calculate by measuring quantities and using cost estimates.
Conduct regular site inspections to identify any extra items that were not included in the original project plans
Review project plans and specifications to ensure all necessary items are accounted for
Measure quantities of extra items needed and calculate costs based on current mark...
I applied via Job Portal and was interviewed before Mar 2021. There were 2 interview rounds.
Creating a central file involves defining the file structure, selecting a storage location, and implementing access controls.
Define the file structure, including fields and data types
Select a storage location, such as a server or cloud-based platform
Implement access controls to ensure only authorized users can access the file
Consider backup and recovery procedures to protect against data loss
Test the file to ensure it
Recreating deleted plans requires data recovery tools and expertise.
Use data recovery software to scan for deleted files
Consult with IT professionals for assistance
Check for backups or previous versions of the plans
Consider recreating the plans from scratch if necessary
Revit has three types of families: system families, loadable families, and in-place families.
System families are predefined and cannot be modified, such as walls, floors, and roofs.
Loadable families are created by users and can be shared and modified, such as furniture, fixtures, and equipment.
In-place families are created within a project and are specific to that project, such as custom stairs or railings.
Families can...
Conceptual mass is a preliminary design model used in architecture to explore and test design ideas.
It is a 3D model created in software like Revit or SketchUp
It is used to study the form, scale, and spatial relationships of a building
It is not a detailed design, but rather a rough representation of the building's massing
It helps architects and clients visualize and understand the design concept
Examples include the ini...
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
posted on 25 Dec 2021
I applied via Recruitment Consultant and was interviewed in Nov 2021. There was 1 interview round.
To achieve the desired target, it is important to set clear goals, create a strategic plan, motivate and empower the team, monitor progress, and make necessary adjustments.
Set clear and specific goals that are aligned with the overall objectives
Create a strategic plan outlining the steps and resources required
Motivate and empower the team by providing support, training, and recognition
Monitor progress regularly through...
I applied via Campus Placement and was interviewed in Oct 2023. There were 4 interview rounds.
Their is Aptitude test of 70 Marks and Cut off of 60
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com
Product costing for new parts
Determine the cost of raw materials and labor required for production
Include overhead costs such as rent, utilities, and equipment maintenance
Consider any additional costs such as shipping or packaging
Compare the cost to market prices to ensure profitability
Regularly review and adjust costing as needed
Zero based costing is a method of cost accounting that involves starting from scratch and justifying every expense.
Zero-based costing requires a thorough analysis of all costs associated with a new part
It involves starting from a zero base and justifying every expense
This method is useful for identifying unnecessary costs and improving efficiency
Example: A company wants to introduce a new product line and uses zero-bas...
I applied via LinkedIn and was interviewed in Oct 2021. There was 1 interview round.
based on 3 interviews
Interview experience
Assistant Manager
5
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Project Manager
4
salaries
| ₹6 L/yr - ₹12 L/yr |
Business Development Manager
4
salaries
| ₹12 L/yr - ₹12 L/yr |
Senior Manager
4
salaries
| ₹9.6 L/yr - ₹15 L/yr |
Assistant Architectural Manager
4
salaries
| ₹4.1 L/yr - ₹6 L/yr |
Ozone Overseas
Flipspaces
Shakti Hormann
Eglo India