i
VYOM
Filter interviews by
Creating a central file involves defining the file structure, selecting a storage location, and implementing access controls.
Define the file structure, including fields and data types
Select a storage location, such as a server or cloud-based platform
Implement access controls to ensure only authorized users can access the file
Consider backup and recovery procedures to protect against data loss
Test the file to ensure it
Recreating deleted plans requires data recovery tools and expertise.
Use data recovery software to scan for deleted files
Consult with IT professionals for assistance
Check for backups or previous versions of the plans
Consider recreating the plans from scratch if necessary
Revit has three types of families: system families, loadable families, and in-place families.
System families are predefined and cannot be modified, such as walls, floors, and roofs.
Loadable families are created by users and can be shared and modified, such as furniture, fixtures, and equipment.
In-place families are created within a project and are specific to that project, such as custom stairs or railings.
Families can...
Conceptual mass is a preliminary design model used in architecture to explore and test design ideas.
It is a 3D model created in software like Revit or SketchUp
It is used to study the form, scale, and spatial relationships of a building
It is not a detailed design, but rather a rough representation of the building's massing
It helps architects and clients visualize and understand the design concept
Examples include the ini...
Tools for creating BOQ and costing include software like Excel, specialized construction estimating software, and online tools.
Use Excel spreadsheets to organize and calculate quantities and costs
Utilize specialized construction estimating software like ProEst or Clear Estimates
Online tools such as PlanSwift or CostCertified can also help in creating BOQ and costing
Consider using Building Information Modeling (BIM) sof
Identify extra items by conducting site inspections and reviewing project plans. Calculate by measuring quantities and using cost estimates.
Conduct regular site inspections to identify any extra items that were not included in the original project plans
Review project plans and specifications to ensure all necessary items are accounted for
Measure quantities of extra items needed and calculate costs based on current mark...
I applied via Job Portal and was interviewed before Mar 2021. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 2 interview rounds.
I would increase sales by identifying new potential customers and building strong relationships with them.
Conduct market research to identify potential customers
Develop targeted marketing campaigns to reach new customers
Offer promotions or discounts to incentivize new customers to try our products
Provide excellent customer service to build loyalty and encourage repeat business
Collaborate with other departments to ensur...
I applied via Referral and was interviewed before May 2020. There were 3 interview rounds.
I am a highly motivated and dedicated individual with a strong background in finance and a passion for problem-solving.
I have a Bachelor's degree in Finance from XYZ University.
I have worked as a financial analyst at ABC Company for 3 years, where I gained experience in financial modeling and data analysis.
I am proficient in using financial software such as Excel and Bloomberg.
I have a proven track record of successful...
I applied via Naukri.com and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Oct 2023. There were 4 interview rounds.
Their is Aptitude test of 70 Marks and Cut off of 60
based on 3 interviews
Interview experience
Assistant Manager
5
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Project Manager
4
salaries
| ₹6 L/yr - ₹12 L/yr |
Business Development Manager
4
salaries
| ₹12 L/yr - ₹12 L/yr |
Senior Manager
4
salaries
| ₹9.6 L/yr - ₹15 L/yr |
Assistant Architectural Manager
4
salaries
| ₹4.1 L/yr - ₹6 L/yr |
Ozone Overseas
Flipspaces
Shakti Hormann
Eglo India