1 Question

  • Q1. EPC contracts schedules, Bill making experience

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

Tell us how to improve this page.

Voyants Solutions Quantity Surveyor Salary
based on 9 salaries
₹4.6 L/yr - ₹8.1 L/yr
At par with the average Quantity Surveyor Salary in India
View more details

Voyants Solutions Quantity Surveyor Reviews and Ratings

based on 5 reviews

4.4/5

Rating in categories

4.4

Skill development

4.1

Work-life balance

4.4

Salary

4.4

Job security

4.4

Company culture

4.1

Promotions

4.1

Work satisfaction

Explore 5 Reviews and Ratings
Field Engineer
61 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Resident Engineer
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Section Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
42 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Voyants Solutions with

Feedback Infrastructure Services

3.4
Compare

Mecon

3.9
Compare

IL&FS Engineering and Construction

4.4
Compare

TCE

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview