Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed in May 2023. There were 4 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.
They ask you to tell that what you do if your subordinate not work properly.
Production assembly line is a process of assembling parts to create a finished product in a systematic and efficient manner.
Production assembly lines are designed to increase efficiency and reduce costs.
Each worker is responsible for a specific task in the assembly process.
The assembly line is divided into different stations, each with its own set of tasks.
The finished product is inspected at the end of the line to ens...
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Apr 2020. There was 1 interview round.
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Aims to increase efficiency and reduce costs
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Assistant Engineer
475
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
440
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
435
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Sales Manager
316
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
249
salaries
| ₹0 L/yr - ₹0 L/yr |
Xiaomi
Samsung
OPPO
Realme