Filter interviews by
Be the first one to contribute and help others!
I applied via Referral and was interviewed before May 2017. There was 1 interview round.
To bridge the gap between simulation results and test results, it is important to validate the simulation model against real-world data and adjust parameters accordingly.
Validate the simulation model by comparing its predictions with actual test results
Adjust simulation parameters based on discrepancies between simulation and test results
Use sensitivity analysis to identify key parameters affecting the simulation outco...
Full vehicle meshing methodology and sizing used in simulation process
We use a combination of structured and unstructured meshing techniques to ensure accurate representation of the vehicle geometry
Mesh sizing is determined based on the complexity of the geometry and the desired level of detail in the simulation
We prioritize mesh quality to capture important flow features and structural behavior
Examples of meshing soft...
Yes, I once failed to meet a project deadline due to miscommunication. I overcame it by improving communication and setting clear expectations.
Miscommunication led to missing project deadline
Identified communication breakdown and addressed it
Improved communication channels and set clear expectations
Successfully completed future projects on time
posted on 21 May 2020
I applied via Naukri.com and was interviewed before May 2019. There were 4 interview rounds.
posted on 3 Aug 2021
I applied via LinkedIn and was interviewed in Jul 2021. There were 5 interview rounds.
posted on 2 Aug 2021
I applied via Naukri.com and was interviewed in Jul 2021. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
MRP stands for Material Requirements Planning.
MRP is a system used to manage and plan the production and inventory of materials.
It helps in determining the quantity and timing of materials needed for production.
MRP takes into account factors like lead time, demand, and inventory levels.
It ensures that materials are available when needed, minimizing stockouts and excess inventory.
MRP software often integrates with other...
I maintain inventory by using a combination of inventory management software, regular stock checks, and forecasting techniques.
Use inventory management software to track stock levels, sales, and reordering
Conduct regular stock checks to ensure accuracy and identify any discrepancies
Implement forecasting techniques to anticipate demand and adjust inventory levels accordingly
Collaborate with suppliers to maintain a stead...
BOM maintenance involves updating and managing the Bill of Materials for products.
Regularly review and update the BOM to reflect any changes in product components or specifications.
Ensure accurate documentation of all parts, quantities, and costs in the BOM.
Coordinate with suppliers to obtain updated information on component availability and pricing.
Implement a version control system to track changes and revisions to t...
Inventory targets are the desired levels of inventory that a company aims to maintain. Minimum inventory is the lowest level required to meet demand, while maximum inventory is the highest level that can be held without incurring excessive costs.
Inventory targets are set to ensure that there is enough stock to meet customer demand.
Minimum inventory is determined by analyzing historical sales data and forecasting future...
Perpetual inventory is a system that continuously tracks and updates inventory levels in real-time.
Perpetual inventory provides a real-time view of inventory levels, allowing businesses to make informed decisions.
It involves using technology, such as barcode scanners or RFID tags, to track inventory movement.
The system automatically updates inventory records as goods are received, sold, or moved within the organization...
I applied via Walk-in and was interviewed in Nov 2020. There were 5 interview rounds.
posted on 17 Aug 2020
I follow my dwm by regularly reviewing and updating my work plan.
I create a detailed work plan at the beginning of each project
I regularly review my progress and adjust my plan as needed
I prioritize tasks based on their importance and urgency
I communicate with my team to ensure we are all on the same page
I track my time and make adjustments to my schedule as needed
7 QC and Core Tools are quality control methodologies used in manufacturing and service industries.
7 QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
Core tools include APQP, PPAP, FMEA, MSA, and SPC.
These tools help in identifying and solving quality-related issues, improving processes, and reducing defects.
They are widely used in industries...
Quality management system is a set of policies, processes, and procedures required for planning and execution of quality control.
It ensures that products or services meet customer requirements and expectations.
It involves continuous improvement and monitoring of processes.
ISO 9001 is a widely recognized standard for quality management systems.
It includes activities such as quality planning, quality control, and quality...
I applied via LinkedIn and was interviewed in Aug 2020. There were 3 interview rounds.
BSVI petrol & diesel vehicles have different fuel compositions & emission standards. Components vary based on vehicle type.
BSVI petrol vehicles have lower sulfur content in fuel compared to diesel vehicles
Diesel vehicles have higher fuel efficiency and torque compared to petrol vehicles
Components in petrol vehicles include spark plugs, fuel injectors, and carburetors
Components in diesel vehicles include fuel injectors,
Power flow in AT transmission on planetary gear sets is controlled by clutches and brakes.
Power from the engine is transferred to the torque converter
The torque converter drives the input shaft of the transmission
The planetary gear sets control the power flow to the output shaft
Clutches and brakes are used to engage and disengage the planetary gear sets
The final output is determined by the combination of gear sets and
posted on 16 Jul 2020
based on 14 reviews
Rating in categories
Service Advisor
7
salaries
| ₹2.3 L/yr - ₹4.5 L/yr |
Team Lead
6
salaries
| ₹3.2 L/yr - ₹3.9 L/yr |
Executive Accountant
5
salaries
| ₹2.5 L/yr - ₹2.7 L/yr |
MIS Executive
4
salaries
| ₹2.1 L/yr - ₹3.1 L/yr |
Technician
4
salaries
| ₹1.4 L/yr - ₹3.2 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland