Upload Button Icon Add office photos

Filter interviews by

Viraj Constructions Civil Site Engineer Interview Questions and Answers

Updated 15 Jun 2024

Viraj Constructions Civil Site Engineer Interview Experiences

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Nov 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Discuss about work experience.
  • Q2. Discuss about salary and others.
Round 2 - Technical 

(2 Questions)

  • Q1. Work related questions.
  • Q2. Civil technical questions.
Round 3 - Behavioral 

(2 Questions)

  • Q1. About to my experience journey.
  • Q2. About my skills and work activities.
Round 4 - HR 

(2 Questions)

  • Q1. Salery discussion.
  • Q2. Document submission. & Offer letter.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Qty of cement in M25 grade concrete
  • Ans. 

    The quantity of cement in M25 grade concrete is 350 kg/m³.

    • M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).

    • The total volume of concrete is taken as 1 m³.

    • Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.

    • This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.

  • Answered by AI
  • Q2. Exact weight of different dia of steel
  • Ans. 

    The weight of steel varies with its diameter.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7850 kg/m³

    • The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length

    • For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg

  • Answered by AI
  • Q3. Process of waterproofing
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Clean and prepare the surface to be waterproofed.

    • Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.

    • Ensure proper drainage and slope to prevent water accumulation.

    • Test the waterproofing system for leaks and make n...

  • Answered by AI
  • Q4. Conversion of brass to Cum
  • Ans. 

    Conversion of brass to Cum

    • Brass is an alloy of copper and zinc, while Cum is not a known substance

    • It is not possible to convert brass to Cum

    • Perhaps the question is referring to a different substance or material

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management. My interview was scheduled on Friday but on Wednesday they email me to come on Thursday. When I reached the mentioned location in email , i was given another location which was 2-3 km away. However when I reached the venue, interview time was 11 Am but it started at 1. Pm . After interview Hr called and told me that you are selected for so and so position but there will be no hike on your current salary, and you have to come for second round . After 15 days they replied me that you are not selected.
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

STEEL WEIGHT, BBS,COVER BLOCK

Round 3 - Technical 

(1 Question)

  • Q1. LAYOUT, DRAWING READING

Interview Preparation Tips

Interview preparation tips for other job seekers - IF YOU ARE UNEMPLOYEMENT FROM ANY COMPANY THEN YOU DIDN'T ANY OPPORTUNITY THAN WILL TRY IT BECAUSE WORK CULTURE IS TOO POOR

I applied via Campus Placement and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. What is the weight of one bag cement
  • Ans. 

    The weight of one bag of cement varies depending on the country and type of cement.

    • The weight of one bag of cement is typically between 25kg and 50kg.

    • In the United States, a bag of Portland cement usually weighs 94 pounds (42.6kg).

    • In Europe, a bag of cement typically weighs 50kg.

    • Different types of cement, such as lightweight cement, may have different weights per bag.

  • Answered by AI
  • Q2. What is initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken for the cement paste to harden sufficiently to resist certain specified pressure.

    • Initial setting time is an important property of cement as it determines the time available for mixing, placing, and finishing of concrete.

    • It is measured by the Vicat apparatus, which consists of a needle and a mould filled with cement paste.

    • The initial setting time is typically around 30 mi...

  • Answered by AI
  • Q3. What is the size of concrete cube
  • Ans. 

    The size of a concrete cube refers to its dimensions, typically measured in millimeters.

    • The size of a concrete cube is usually specified by the engineer or client.

    • Common sizes for concrete cubes are 150mm, 200mm, and 300mm.

    • The size of the cube is important for testing the compressive strength of the concrete.

    • The cubes are typically cast and cured for a specific period before testing.

  • Answered by AI
  • Q4. What is the minimum diameter for doweals bar
  • Ans. 

    The minimum diameter for dowel bars depends on the specific application and design requirements.

    • The minimum diameter for dowel bars is typically specified in the project's design documents or specifications.

    • It is important to consider factors such as the load transfer requirements, concrete strength, and spacing between dowel bars when determining the minimum diameter.

    • In general, dowel bars for pavement joints are comm...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. What is the lap length of bars for compperision zone
  • Ans. 

    The lap length of bars for compression zone is the minimum length required to ensure proper transfer of stress between two overlapping bars.

    • The lap length is determined based on the diameter of the bars, concrete strength, and the bond strength between the bars and concrete.

    • It is important to provide adequate lap length to prevent failure due to inadequate bond between the bars and concrete.

    • The lap length for compressi...

  • Answered by AI
  • Q2. What is the minimum alowable ph value of water
  • Ans. 

    The minimum allowable pH value of water is 6.5.

    • The minimum allowable pH value of water is determined by various regulatory bodies and standards.

    • For drinking water, the World Health Organization recommends a minimum pH of 6.5 to prevent corrosion of pipes and plumbing fixtures.

    • In some industrial processes, a minimum pH of 6.0 or even lower may be required.

    • Water with a pH below the minimum allowable value may be consider...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Ashoka Builders Civil Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - This is a basic and absolute need for almost every job seeker.in fact a survey 500 U.S workers by inded showed that if they were considering a new job opportunity , 95% workers said insight into a comapnys reputation would be importent.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Civil engineer questions
Round 3 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - I will work hard & Honestly so I will Handel project nicely
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Just construction activities
Round 3 - HR 

(1 Question)

  • Q1. Just Salary negotiations
Round 4 - Behavioral 

(1 Question)

  • Q1. Position and Salary Finalisation

Interview Preparation Tips

Topics to prepare for Ashar group Site Engineer interview:
  • Construction Activity
  • finishing
  • Billing
  • Site Supervision
Interview preparation tips for other job seekers - Just be confident and prompt

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Construction work relativ , Drawing relative, Execution Work ,steel work, shutting work, planning, ke relative questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Official website and HR department share Post office site par and linkdin par
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Experience based
Round 3 - Technical 

(1 Question)

  • Q1. Initial setting time of cement
  • Ans. 

    Initial setting time of cement refers to the time taken for the cement paste to harden enough to resist certain pressure.

    • Initial setting time is the time taken for the cement paste to harden enough to resist a certain pressure, typically 3.5 N/mm^2.

    • It is an important property of cement as it determines the workability and strength development of concrete.

    • The initial setting time of cement is usually around 30 minutes t...

  • Answered by AI

Viraj Constructions Interview FAQs

How many rounds are there in Viraj Constructions Civil Site Engineer interview?
Viraj Constructions interview process usually has 1 rounds. The most common rounds in the Viraj Constructions interview process are Technical.
What are the top questions asked in Viraj Constructions Civil Site Engineer interview?

Some of the top questions asked at the Viraj Constructions Civil Site Engineer interview -

  1. Stectur work for vi...read more
  2. Fhinishing questi...read more

Tell us how to improve this page.

Viraj Constructions Civil Site Engineer Salary
based on 6 salaries
₹1.4 L/yr - ₹3 L/yr
39% less than the average Civil Site Engineer Salary in India
View more details

Viraj Constructions Civil Site Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

4.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

4.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
7 salaries
unlock blur

₹3 L/yr - ₹4.8 L/yr

Accountant
7 salaries
unlock blur

₹2.4 L/yr - ₹3.5 L/yr

Site Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

Marketing Executive
7 salaries
unlock blur

₹2.2 L/yr - ₹2.2 L/yr

Civil Engineer
6 salaries
unlock blur

₹3 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Viraj Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview