Leadership and site management
To solve site problems caused by drawing and measurement mistakes, I would implement thorough quality control measures and communication protocols.
Implement regular quality control checks to catch drawing and measurement mistakes early on
Establish clear communication protocols between team members to ensure everyone is on the same page
Train staff on proper drawing and measurement techniques to minimize errors
Utilize te...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
posted on 2 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Discussed about experience, discussed about technical and professional skills
Good attitude and best interview procedure
posted on 22 Nov 2023
I applied via LinkedIn and was interviewed in May 2023. There were 2 interview rounds.
I have 5 years of experience in various roles including project management, team leadership, and customer service.
5 years of experience
Project management
Team leadership
Customer service
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
I worked at XYZ Company as a Deputy Manager.
Managed a team of 10 employees
Implemented new strategies to increase productivity
Achieved a 20% increase in sales within the first year
Streamlined processes to improve efficiency
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
The acceptable tolerance in % value during receipts depends on the company's policies and industry standards.
The acceptable tolerance in % value during receipts can vary depending on the nature of the business.
Some companies may have a strict tolerance limit of 1-2% to ensure accuracy in financial records.
Other industries, such as retail, may have a higher tolerance limit of 5-10% due to factors like pricing errors or ...
Acceptable tolerance refers to the maximum deviation allowed from a desired value or standard.
Acceptable tolerance is a measure of how much variation is considered acceptable in a particular context.
It is often used in quality control to determine if a product or process meets the required standards.
For example, if the acceptable tolerance for a weight measurement is 0.5%, a weight of 100 grams can vary by up to 0.5 gr...
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
posted on 22 Apr 2022
A little tough..
based on 1 interview
Interview experience
Project Engineer
5
salaries
| ₹4.5 L/yr - ₹8.2 L/yr |
Project Manager
3
salaries
| ₹6.2 L/yr - ₹19.6 L/yr |
Data Analyst
3
salaries
| ₹13 L/yr - ₹13 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures