Upload Button Icon Add office photos

Vibracoustic

Compare button icon Compare button icon Compare

Filter interviews by

Vibracoustic Senior Production Planning and Control Engineer Interview Questions and Answers

Updated 19 May 2024

Vibracoustic Senior Production Planning and Control Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General maths questions

Round 2 - Technical 

(1 Question)

  • Q1. Technical PPC questions

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Questions were based on CV

Interview Preparation Tips

Interview preparation tips for other job seekers - Be true to what you've mentioned in your CV

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Depends on experience
  • Q2. Related to systematic approach
  • Ans. Problem solving tools, OEE, FPY, Root cause analysis. 14Q, 5S
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join Bosch chakan if want to have growing future In career and work life balance.

I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Previous company work experience
  • Q2. Plans in next 5 years
  • Ans. 

    I plan to continue developing my technical skills and taking on leadership roles within the company.

    • Pursue advanced technical certifications

    • Lead cross-functional teams on complex projects

    • Mentor junior engineers

    • Explore opportunities for innovation and process improvement

    • Collaborate with senior management to set strategic goals

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was ok. But the local management is horrible. Don't join expecting MNC standard.Even a startup might be better than this company. It's a family owned business by the manager. Not MNC

I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Technical knowledge about area
  • Q2. English is required as fluent
Round 3 - Aptitude Test 

Question abou TPM, OEE, six Sigma, lean manufacturing,kaizen,poka yoke etc

Round 4 - HR 

(1 Question)

  • Q1. No sales discuss the directly give you ofer with hike of 30-40%

Interview Preparation Tips

Interview preparation tips for other job seekers - Be fluent in English
Be confident
Share only you know very well.
Short but exactly answers the required in interview stories are no one like
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain function pointers in c?
  • Ans. 

    Function pointers in C are pointers that point to functions instead of data.

    • Function pointers are used to pass functions as arguments to other functions.

    • They can be used to implement callbacks and event handlers.

    • Syntax: return_type (*ptr_name)(parameters);

    • Example: int (*funcPtr)(int, int);

  • Answered by AI
  • Q2. Explain DCM module from BSW?
  • Ans. 

    DCM module in BSW is responsible for managing diagnostic communication between the vehicle and external diagnostic tools.

    • DCM stands for Diagnostic Communication Manager

    • It handles communication protocols such as UDS, KWP2000, and OBD

    • DCM manages diagnostic sessions, communication parameters, and diagnostic trouble codes

    • It provides APIs for diagnostic services like reading and clearing DTCs

    • Example: DCM module in BSW facil...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Protocol relatedsuch as
  • Q2. Can protocol framing
  • Q3. Uds services and nrc code
  • Q4. Python with automation
  • Q5. Dspace, vt, aspice, xcp with automation

Interview Preparation Tips

Topics to prepare for Schaeffler India Senior Engineer interview:
  • Canoe
  • CAN protocol
  • UDS
  • Python
  • CAPL
  • Hil testing
  • DSpace
  • Software integration
  • Bug Tracking
  • Regression Testing
  • vt
  • Vt studio
  • Aspice
  • Fusa
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Scm role and responsibilities
  • Q2. Earlier experience and roles
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cycle time?
  • Ans. 

    Cycle time is the total time taken to complete a process or task from start to finish.

    • Cycle time is a key metric in process improvement and efficiency analysis.

    • It helps in identifying bottlenecks and areas for improvement in a process.

    • For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.

    • Reducing cycle time can lead to increased productivity and cost savings.

  • Answered by AI
  • Q2. What is line balancing
  • Ans. 

    Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.

    • Involves distributing work evenly among workstations

    • Helps in reducing idle time and bottlenecks

    • Improves productivity and efficiency

    • Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(1 Question)

  • Q1. About lithium ion battery

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

Vibracoustic Interview FAQs

How many rounds are there in Vibracoustic Senior Production Planning and Control Engineer interview?
Vibracoustic interview process usually has 2 rounds. The most common rounds in the Vibracoustic interview process are Aptitude Test and Technical.

Tell us how to improve this page.

Vibracoustic Senior Production Planning and Control Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Bosch Interview Questions
4.2
 • 329 Interviews
Ford Motor Interview Questions
4.4
 • 145 Interviews
Yamaha Motor Interview Questions
4.2
 • 65 Interviews
Volvo Interview Questions
4.1
 • 63 Interviews
CNH Industrial Interview Questions
3.8
 • 55 Interviews
Bajaj Motors Interview Questions
3.9
 • 50 Interviews
Continental Interview Questions
3.9
 • 49 Interviews
View all
Deputy Manager
37 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
13 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Production Supervisor
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Vibracoustic with

Bosch

4.2
Compare

Continental

3.9
Compare

ZF Steering Gear

3.7
Compare

MAHLE ANAND Filter Systems

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview