Filter interviews by
Trenching involves digging a narrow excavation in the ground, while ducting refers to the installation of protective conduits for cables or pipes.
Trenching is the process of digging a narrow channel or depression in the ground to lay cables or pipes.
Ducting involves installing protective conduits, such as PVC pipes or metal tubes, underground to house cables or pipes.
Trenching is typically done using specialized equipm...
Chamber installation and blowing are processes involved in the installation of fiber optic cables in underground chambers.
Chamber installation involves placing fiber optic cables in underground chambers for protection and easy access.
Blowing is the process of using compressed air to push the fiber optic cables through the underground ducts.
Both chamber installation and blowing are important steps in ensuring the proper...
Chamber size refers to the dimensions of a chamber used in OSP engineering. RouteMark is a tool used for marking routes.
Chamber size is the physical dimensions of a chamber used in OSP engineering projects.
It is important to consider chamber size when planning and designing OSP networks to ensure proper fit and functionality.
RouteMark is a tool used for marking routes in OSP projects to indicate the path of underground...
Splicing is the process of joining two optical fibers together, while HOTO stands for High Optical Test Outage.
Splicing involves aligning and fusing the ends of optical fibers to create a continuous connection.
HOTO is a term used in fiber optic networks to refer to the time when a high number of optical tests are being conducted, leading to potential service disruptions.
Splicing is essential for extending or repairing ...
Normal depth refers to the typical depth at which underground utilities are buried, while hard soil is soil that is difficult to excavate.
Normal depth for underground utilities is typically around 2-4 feet deep
Hard soil can be characterized by its compactness and resistance to penetration
Examples of hard soil include clay, rocky soil, and soil with high levels of gravel
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
Top trending discussions
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 13 Sep 2022
I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.
Aptitude and English test
I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.
Recursion is a process in which a function calls itself. Inheritance is a mechanism in OOP where a class inherits properties of another class. Heap is a region of memory used for dynamic memory allocation.
Recursion can be used to solve problems that can be broken down into smaller sub-problems.
Inheritance allows for code reuse and helps in creating a hierarchy of classes.
Heap is used for dynamic memory allocation in la...
I applied via Naukri.com and was interviewed before Apr 2020. There were 5 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 3 interview rounds.
Cocubes Test Task 1 is of Aptitude questions needs to be completed in Specific time interval and Task 2 is Essay Writing to be finished in Given interval
L1 Exam should be cleared L 1 exam is of multiple choice questions and completely related to Java J2Ee Spring
I applied via Recruitment Consultant and was interviewed before Feb 2020. There were 4 interview rounds.
based on 3 interviews
Interview experience
based on 27 reviews
Rating in categories
Fiber Engineer
6
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Senior Engineer
5
salaries
| ₹3.2 L/yr - ₹4.8 L/yr |
Senior Fibre Engineer
5
salaries
| ₹3.4 L/yr - ₹4 L/yr |
Site Engineer
5
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Fttx Construction Engineer
4
salaries
| ₹2.5 L/yr - ₹3 L/yr |
TCS
Accenture
Wipro
Cognizant