Upload Button Icon Add office photos

Filter interviews by

UTILITY PROJECTS AND SERVICES Estimation Engineer Interview Questions and Answers

Updated 22 Jun 2022

UTILITY PROJECTS AND SERVICES Estimation Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jun 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is first, second and third law of thermodynamics
  • Ans. 

    The first law states that energy cannot be created or destroyed, the second law states that entropy always increases in a closed system, and the third law states that it is impossible to reach absolute zero.

    • First law: Conservation of energy

    • Second law: Entropy always increases

    • Third law: Absolute zero is unattainable

  • Answered by AI
  • Q2. What is entropy, pressure et
  • Ans. 

    Entropy is a measure of disorder or randomness in a system, while pressure is the force exerted per unit area.

    • Entropy is a thermodynamic property that describes the degree of disorder or randomness in a system.

    • It is denoted by the symbol S and is measured in units of joules per kelvin.

    • Pressure is the force exerted per unit area and is measured in units of pascals.

    • It is denoted by the symbol P and is a measure of the in...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. 1) Math related questions like square of a number etc 2) What is your favourite subject
Round 4 - HR 

(2 Questions)

  • Q1. What is empathy? When can you join?
  • Q2. Do you have a job in hand etc?

Interview Preparation Tips

Topics to prepare for UTILITY PROJECTS AND SERVICES Estimation Engineer interview:
  • Thermodynamics
  • Maths
Interview preparation tips for other job seekers - 1) Basics of heat transfer and thermodynamics is must.
2) Math should be strong

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about UTILITY PROJECTS AND SERVICES?
Ask anonymously on communities.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Estimation Engineer Interview Questions Asked at Other Companies

asked in Sun Infraa
Q1. How would you onboard a new material supply vendor near our site?
Q2. What are the limitations of star-delta and DOL starters?
asked in Sun Infraa
Q3. What is the Types of cement brand in Tamil Nadu or local ?
Q4. What is first, second and third law of thermodynamics
Q5. Explain the difference between DOL and Star Delta Starter.

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Ans. 

    A man day is a unit of measure representing the amount of work one person can complete in a single day.

    • Typically used in project management to estimate labor costs and timelines.

    • One man day usually equals 8 hours of work.

    • For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.

    • Helps in resource allocation and planning for projects.

  • Answered by AI
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cube Compressive achieving Percentage time periods?
  • Ans. 

    Cube compressive achieving percentage time periods

    • The question is asking about the percentage of time periods in which cube compressive strength is achieved

    • Cube compressive strength refers to the ability of a cube-shaped material to withstand compression

    • The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength

    • Examples of data points needed: time periods,...

  • Answered by AI
  • Q2. M20 grade and M means and 20 means and unit
  • Q3. 1:1.5:3 ,M-Mix,20 -Compresive strength,N/mm²

Interview Preparation Tips

Interview preparation tips for other job seekers - Be face Bolt don't jerk anyone becoz they also Human
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About site experience

Round 2 - Technical 

(1 Question)

  • Q1. Site execution technical
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 3 - HR 

(1 Question)

  • Q1. Salary related discussion
Are these interview questions helpful?
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Ans. 

    Welding methods for steel include various techniques like MIG, TIG, and Stick welding, each suited for different applications.

    • MIG Welding (Gas Metal Arc Welding) - Uses a continuous wire feed and is ideal for thin to medium thickness steel.

    • TIG Welding (Gas Tungsten Arc Welding) - Provides high precision and is suitable for thin materials and stainless steel.

    • Stick Welding (Shielded Metal Arc Welding) - Versatile and com...

  • Answered by AI
  • Q3. What are the advantage of steel shuttering?
  • Ans. 

    Steel shuttering offers durability, reusability, and precision in construction, enhancing project efficiency and quality.

    • Durability: Steel shuttering can withstand harsh weather conditions and heavy loads, making it suitable for large-scale projects.

    • Reusability: Unlike timber, steel can be reused multiple times, reducing material costs over time.

    • Precision: Steel shuttering provides a high level of accuracy in dimension...

  • Answered by AI
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.

UTILITY PROJECTS AND SERVICES Interview FAQs

How many rounds are there in UTILITY PROJECTS AND SERVICES Estimation Engineer interview?
UTILITY PROJECTS AND SERVICES interview process usually has 4 rounds. The most common rounds in the UTILITY PROJECTS AND SERVICES interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in UTILITY PROJECTS AND SERVICES Estimation Engineer interview?

Some of the top questions asked at the UTILITY PROJECTS AND SERVICES Estimation Engineer interview -

  1. What is first, second and third law of thermodynam...read more
  2. What is entropy, pressure...read more
  3. 1) Math related questions like square of a number etc 2) What is your favourite...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 128 Interviews
Apco Infratech Interview Questions
3.7
 • 122 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 65 Interviews
Wood Group Interview Questions
3.7
 • 63 Interviews
Psp Projects Interview Questions
3.8
 • 61 Interviews
View all
UTILITY PROJECTS AND SERVICES Estimation Engineer Salary
based on 5 salaries
₹1.5 L/yr - ₹5 L/yr
41% less than the average Estimation Engineer Salary in India
View more details

UTILITY PROJECTS AND SERVICES Estimation Engineer Reviews and Ratings

based on 2 reviews

3.6/5

Rating in categories

4.4

Skill development

2.7

Work-life balance

3.6

Salary

4.4

Job security

3.6

Company culture

2.7

Promotions

2.7

Work satisfaction

Explore 2 Reviews and Ratings
Facility Manager
50 salaries
unlock blur

₹4.5 L/yr - ₹9.1 L/yr

Junior Engineer
26 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Shift Engineer
20 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

Electrical Technician
20 salaries
unlock blur

₹1.7 L/yr - ₹3.3 L/yr

Electrical Engineer
15 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Explore more salaries
Compare UTILITY PROJECTS AND SERVICES with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview