Upload Button Icon Add office photos

Filter interviews by

UTILITY PROJECTS AND SERVICES Estimation Engineer Interview Questions and Answers

Updated 22 Jun 2022

UTILITY PROJECTS AND SERVICES Estimation Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jun 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is first, second and third law of thermodynamics
  • Ans. 

    The first law states that energy cannot be created or destroyed, the second law states that entropy always increases in a closed system, and the third law states that it is impossible to reach absolute zero.

    • First law: Conservation of energy

    • Second law: Entropy always increases

    • Third law: Absolute zero is unattainable

  • Answered by AI
  • Q2. What is entropy, pressure et
  • Ans. 

    Entropy is a measure of disorder or randomness in a system, while pressure is the force exerted per unit area.

    • Entropy is a thermodynamic property that describes the degree of disorder or randomness in a system.

    • It is denoted by the symbol S and is measured in units of joules per kelvin.

    • Pressure is the force exerted per unit area and is measured in units of pascals.

    • It is denoted by the symbol P and is a measure of the in...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. 1) Math related questions like square of a number etc 2) What is your favourite subject
Round 4 - HR 

(2 Questions)

  • Q1. What is empathy? When can you join?
  • Q2. Do you have a job in hand etc?

Interview Preparation Tips

Topics to prepare for UTILITY PROJECTS AND SERVICES Estimation Engineer interview:
  • Thermodynamics
  • Maths
Interview preparation tips for other job seekers - 1) Basics of heat transfer and thermodynamics is must.
2) Math should be strong

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - Assignment 

Core q were there, which is related to process and industrial instrumentation

Round 2 - Technical 

(3 Questions)

  • Q1. Valve related q
  • Q2. Cost estimation
  • Q3. General talk regarding campus , company
Round 3 - HR 

(2 Questions)

  • Q1. Resume grinding
  • Q2. Why do u want to join
  • Ans. 

    I am passionate about utilizing my skills in estimation and engineering to contribute to the growth and success of the company.

    • I have a strong background in engineering and estimation, making me well-suited for the role.

    • I am excited about the opportunity to work on challenging projects and contribute to the company's success.

    • I believe that my skills and experience align well with the requirements of the position.

    • I am e...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - good company but not got offered as other guy having high GPA and they have came for one position only
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - Assignment 

Core q were there, which is related to process and industrial instrumentation

Round 2 - Technical 

(3 Questions)

  • Q1. Valve related q
  • Q2. Cost estimation
  • Q3. General talk regarding campus , company
Round 3 - HR 

(2 Questions)

  • Q1. Resume grinding
  • Q2. Why do u want to join
  • Ans. 

    I am passionate about utilizing my skills in estimation and engineering to contribute to the growth and success of the company.

    • I have a strong background in engineering and estimation, making me well-suited for the role.

    • I am excited about the opportunity to work on challenging projects and contribute to the company's success.

    • I believe that my skills and experience align well with the requirements of the position.

    • I am e...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - good company but not got offered as other guy having high GPA and they have came for one position only

UTILITY PROJECTS AND SERVICES Interview FAQs

How many rounds are there in UTILITY PROJECTS AND SERVICES Estimation Engineer interview?
UTILITY PROJECTS AND SERVICES interview process usually has 4 rounds. The most common rounds in the UTILITY PROJECTS AND SERVICES interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in UTILITY PROJECTS AND SERVICES Estimation Engineer interview?

Some of the top questions asked at the UTILITY PROJECTS AND SERVICES Estimation Engineer interview -

  1. What is first, second and third law of thermodynam...read more
  2. What is entropy, pressure...read more
  3. 1) Math related questions like square of a number etc 2) What is your favourite...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 UTILITY PROJECTS AND SERVICES interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 425 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
Adani Power Interview Questions
4.0
 • 201 Interviews
Havells Interview Questions
4.0
 • 200 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Tata Power Interview Questions
3.9
 • 157 Interviews
Apco Infratech Interview Questions
3.8
 • 111 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
View all
UTILITY PROJECTS AND SERVICES Estimation Engineer Salary
based on 5 salaries
₹2.2 L/yr - ₹3.6 L/yr
44% less than the average Estimation Engineer Salary in India
View more details

UTILITY PROJECTS AND SERVICES Estimation Engineer Reviews and Ratings

based on 2 reviews

3.6/5

Rating in categories

4.5

Skill development

2.7

Work-Life balance

3.6

Salary & Benefits

4.5

Job Security

3.6

Company culture

2.7

Promotions/Appraisal

2.7

Work Satisfaction

Explore 2 Reviews and Ratings
Facility Manager
44 salaries
unlock blur

₹2.3 L/yr - ₹9.1 L/yr

Junior Engineer
24 salaries
unlock blur

₹2 L/yr - ₹3.8 L/yr

Electrical Technician
21 salaries
unlock blur

₹1.7 L/yr - ₹3.3 L/yr

Shift Engineer
20 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

Project Engineer
14 salaries
unlock blur

₹2.5 L/yr - ₹5.4 L/yr

Explore more salaries
Compare UTILITY PROJECTS AND SERVICES with

Tata Power

3.9
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

BHEL

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview