Round 1 - Technical 

(2 Questions)

  • Q1. Electrical engineering
  • Q2. Transformers Moter

Interview Preparation Tips

Interview preparation tips for other job seekers - Fild service

Interview questions from similar companies

I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to distribution network, safety and Quality of work related.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never miss guide the inteiviower.

Interview Questionnaire 

1 Question

  • Q1. Question about power distribution has been asked.

I applied via Naukri.com and was interviewed in Feb 2021. There were 7 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - You have to technicaly very strong. Full knowledge of MoRTH and IRC.

I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related questions my job
Round 3 - Aptitude Test 
Round 4 - Assignment 

Manager related

Interview Preparation Tips

Interview preparation tips for other job seekers - very good experience in Adani till today
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your name, qualification & why you want to join organisation
Round 2 - Technical 

(1 Question)

  • Q1. I was hired for condition monitoring roll. It was basic questions with vibration analysis. You should know the basics and case study.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & you should have basis knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are closed loop control system
  • Ans. 

    Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.

    • Closed loop control systems use feedback to maintain a desired output

    • They continuously monitor the output and compare it to the desired input

    • Based on the comparison, adjustments are made to maintain the desired output

    • Examples include thermostat-controlled heating systems and cruise control in cars

  • Answered by AI
  • Q2. Details of Field instruments
Round 3 - Technical 

(3 Questions)

  • Q1. Brief discussion on c&i
  • Q2. How you will handle the situations
  • Q3. What are expecting from us

Interview Preparation Tips

Interview preparation tips for other job seekers - Always prepare in detail what u have written in resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. For experienced person questions are from their field
Round 2 - One-on-one 

(1 Question)

  • Q1. From Executive Director

Interview Preparation Tips

Topics to prepare for Torrent Power Assistant Manager interview:
  • Know basics from your field
  • Problem solving methodologies
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical Round
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical details asked
Round 4 - One-on-one 

(1 Question)

  • Q1. Past experience details taken

Interview Preparation Tips

Interview preparation tips for other job seekers - Your profile should be perfectly matched and should be technically sound in your area
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Experience field
  • Q2. Practical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Accelerate process

Uttar Pradesh Power Corporation Interview FAQs

How many rounds are there in Uttar Pradesh Power Corporation Assistant Manager interview?
Uttar Pradesh Power Corporation interview process usually has 1 rounds. The most common rounds in the Uttar Pradesh Power Corporation interview process are Technical.
What are the top questions asked in Uttar Pradesh Power Corporation Assistant Manager interview?

Some of the top questions asked at the Uttar Pradesh Power Corporation Assistant Manager interview -

  1. Electrical engineer...read more
  2. Transformers Mo...read more

Tell us how to improve this page.

Uttar Pradesh Power Corporation Assistant Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Uttar Pradesh Power Corporation Assistant Manager Reviews and Ratings

based on 2 reviews

3.8/5

Rating in categories

3.2

Skill development

2.6

Work-life balance

3.8

Salary

3.2

Job security

2.6

Company culture

2.6

Promotions

3.2

Work satisfaction

Explore 2 Reviews and Ratings
Computer Operator
189 salaries
unlock blur

₹0.9 L/yr - ₹4.5 L/yr

Electrician
33 salaries
unlock blur

₹0.9 L/yr - ₹4 L/yr

Substation Operator
29 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Executive Engineer
21 salaries
unlock blur

₹10 L/yr - ₹35 L/yr

Mission Manager
21 salaries
unlock blur

₹3.3 L/yr - ₹4 L/yr

Explore more salaries
Compare Uttar Pradesh Power Corporation with

Adani Group

3.9
Compare

Adani Power

3.9
Compare

Suzlon Group

4.1
Compare

Eaton

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview