  • Q1. Testing of Distribution Transformer
  • Ans. 

    Testing of Distribution Transformer involves various electrical and mechanical tests to ensure its performance and safety.

    • Electrical tests include turns ratio test, insulation resistance test, and short circuit test.

    • Mechanical tests include temperature rise test and vibration test.

    • Testing also involves checking the transformer's efficiency and power factor.

    • Visual inspection is done to check for any physical damages or ...

  • Answered by AI
Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why should we hire you?
  • Q3. Where do you see yourself in 5 years?
  • Q4. What are your strengths and weaknesses?
  • Q5. Tell me about yourself.
Round 3 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - Some people are having skills but their are lack of guidence and apportunities and some are suffering with communication and fear so keep trying definitely u will win at the end..
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Maximum Qty pour at a time
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - One-on-one 

(7 Questions)

  • Q1. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and belt clamping take-up up and blumber block top cover open and slue Ba...
  • Ans. 

    Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q2. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and v-scraper remove and new v-scraper replace and bolts nut tigh...
  • Q3. Roller changed and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and fream number mark and Roller shift and Roller cut change and walked awa...
  • Q4. Motor replace work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and motor remove and new motor replace and bolts nut tightening sure and ...
  • Ans. 

    Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q5. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and gear box remove and new gear box replace and bolts nut tighten...
  • Ans. 

    Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q6. Conveyer Barring checking and savings greasing work and safety first and all ppes sure and paper work and all pulley checking and savings Greasing sure and paper work cancelled and conveyer belt running o...
  • Q7. Fluid coupling oil replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolt nut open and old clean and fresh and new Oli Pur dropped and bolt...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is your job role?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. About plc & automation
  • Q2. About vfd working & how it works
  • Q3. About type of sensors
  • Q4. About star delta power & control wiring
  • Q5. About how to measure parameter of your plantequipment performance
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There was 1 interview round.

Round 1 - Product Management 

(2 Questions)

  • Q1. Need to solar system asking me
  • Q2. Furtue life solar power palnt perif explanation

Interview Preparation Tips

Interview preparation tips for other job seekers - I am full fil my hard work for your company
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Basic Online aptitude test

Round 2 - Technical 

(1 Question)

  • Q1. Overall idea about thermal power plant.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. They talk about vigilance process
  • Q2. Revenue Recovery process
Round 3 - HR 

(2 Questions)

  • Q1. What is your current salary
  • Q2. We cannot give you salary not more than offered.

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have no option then go to CESC

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 211 Interviews
Adani Group Interview Questions
3.9
 • 179 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Suzlon Group Interview Questions
4.1
 • 128 Interviews
Torrent Power Interview Questions
3.7
 • 125 Interviews
Eaton Corporation Interview Questions
3.9
 • 117 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Hitachi Energy Interview Questions
4.1
 • 80 Interviews
View all
Uttar Pradesh Power Corporation Assistant Engineer Salary
based on 24 salaries
₹8.3 L/yr - ₹13.6 L/yr
191% more than the average Assistant Engineer Salary in India
View more details

Uttar Pradesh Power Corporation Assistant Engineer Reviews and Ratings

based on 4 reviews

3.5/5

Rating in categories

3.4

Skill development

2.7

Work-life balance

2.9

Salary

4.0

Job security

3.1

Company culture

3.1

Promotions

3.4

Work satisfaction

Explore 4 Reviews and Ratings
Computer Operator
184 salaries
unlock blur

₹1 L/yr - ₹4.2 L/yr

Electrician
31 salaries
unlock blur

₹0.9 L/yr - ₹4 L/yr

Substation Operator
27 salaries
unlock blur

₹1 L/yr - ₹4.8 L/yr

Junior Engineer
25 salaries
unlock blur

₹2.2 L/yr - ₹8.5 L/yr

Assistant Engineer
24 salaries
unlock blur

₹8.3 L/yr - ₹13.6 L/yr

Explore more salaries
Compare Uttar Pradesh Power Corporation with

NTPC

4.2
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare

Adani Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview