i
Updater Services
Filter interviews by
I was interviewed before Feb 2024.
Top trending discussions
posted on 10 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Transformer vector group is a method used to represent the phase shift between the primary and secondary windings of a transformer.
Transformer vector group indicates the relationship between the primary and secondary winding phases.
It helps in determining the connection and phase shift of the transformer windings.
Common vector groups include Yy0, Yd1, Dyn11, etc.
Vector group is important for parallel operation of trans
VBD test is conducted in transformers to ensure insulation integrity and detect any potential faults.
VBD test helps in identifying any weak spots in the insulation of the transformer
It helps in preventing breakdowns and ensuring the safety and reliability of the transformer
By conducting VBD test, any potential faults can be detected early and necessary maintenance can be carried out
It is a standard procedure in transfo
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
I was interviewed in Aug 2023.
I applied via Naukri.com
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 28 Dec 2024
posted on 1 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
posted on 10 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Transformer vector group is a method used to represent the phase shift between the primary and secondary windings of a transformer.
Transformer vector group indicates the relationship between the primary and secondary winding phases.
It helps in determining the connection and phase shift of the transformer windings.
Common vector groups include Yy0, Yd1, Dyn11, etc.
Vector group is important for parallel operation of trans
VBD test is conducted in transformers to ensure insulation integrity and detect any potential faults.
VBD test helps in identifying any weak spots in the insulation of the transformer
It helps in preventing breakdowns and ensuring the safety and reliability of the transformer
By conducting VBD test, any potential faults can be detected early and necessary maintenance can be carried out
It is a standard procedure in transfo
based on 2 interviews
Interview experience
based on 10 reviews
Rating in categories
Facility Manager
71
salaries
| ₹3 L/yr - ₹9.5 L/yr |
Facility Executive
47
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Supervisor
37
salaries
| ₹1.4 L/yr - ₹4.5 L/yr |
Assistant Manager
34
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Senior Executive
32
salaries
| ₹2.6 L/yr - ₹5.8 L/yr |
Urban Company
Housejoy
Qube Services
Timesaverz