Filter interviews by
Be the first one to contribute and help others!
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
Unbilled data or accrual data refers to revenue that has been earned but not yet billed to the customer.
Unbilled data is a common term used in accounting to describe revenue that has been recognized but not yet invoiced.
Accrual data refers to expenses that have been incurred but not yet recorded in the accounting system.
Clearing unbilled data is important to ensure accurate financial reporting and to prevent revenue le...
Cash forecast is a projection of future cash inflows and outflows. Golden rules of accounting are basic principles to maintain accurate financial records.
Cash forecast helps in managing cash flow and planning for future expenses.
Golden rules of accounting are: debit the receiver, credit the giver; debit what comes in, credit what goes out; and debit expenses and losses, credit income and gains.
These rules ensure accura...
A credit note is a document issued by a seller to a buyer, indicating that a certain amount has been credited back to the buyer's account.
Credit notes are used to correct errors in invoices.
They are also used to adjust the amount owed by a customer.
Credit notes can be issued for returned goods or cancelled services.
They can also be used to give a discount or refund to a customer.
Credit notes are important for maintaini
Payment term is the time period within which a customer is required to pay for goods or services. Credit period is the time period for which a customer is allowed to delay payment.
Payment term is agreed upon by the seller and buyer during a transaction.
It can be expressed in days, weeks, or months.
For example, a payment term of 30 days means the customer must pay within 30 days of receiving the invoice.
Credit period is...
posted on 18 Jul 2022
I applied via campus placement at Atharva College of Engineering, Mumbai
posted on 18 Nov 2021
I was interviewed in Oct 2021.
I applied via Approached by Company and was interviewed in Feb 2022. There were 4 interview rounds.
posted on 25 Nov 2021
posted on 12 Sep 2021
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
I applied via LinkedIn and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 17 Jun 2021
BIM application in highway models involves creating a digital representation of the road and its infrastructure.
BIM can be used to design and visualize highway projects
It allows for collaboration between different stakeholders
BIM can help with clash detection and reduce errors in construction
It can also be used for maintenance and asset management
Examples include the use of BIM in the construction of the M25 motorway i
I review/check work of an originator in Civil3D Models by following a systematic approach.
I check for errors and inconsistencies in the model.
I verify that the model adheres to the project standards and specifications.
I ensure that the model is accurate and complete.
I communicate with the originator to clarify any issues or concerns.
I document any changes or revisions made to the model.
I perform a final review before s
Roundabout parameters and values vary based on urban and rural settings.
Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.
Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.
Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.
Roundabout parameters may include lane widths, splitter island wid...
ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.
Road geometry data such as lane widths, radii, and gradients
Traffic flow data such as traffic volume, speed, and composition
Vehicle characteristics such as dimensions, speed, and acceleration
Other inputs such as signal timings and pedestrian crossings
I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.
Expertise in creating and editing surfaces, alignments, profiles, and corridors
Ability to generate 3D models and perform earthwork calculations
Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs
Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow
Proficie...
posted on 19 Aug 2021
I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.
I was interviewed in Nov 2021.
based on 3 reviews
Rating in categories
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies