Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Oceaneering International Team. If you also belong to the team, you can get access from here

Oceaneering International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Oceaneering International Senior Billing Analyst Interview Questions and Answers

Updated 18 Nov 2021

Oceaneering International Senior Billing Analyst Interview Experiences

1 interview found

I appeared for an interview in Oct 2021.

Interview Questionnaire 

5 Questions

  • Q1. They asked me to fill up a form before the final round..
  • Q2. I filled the same and related to that... They asked all questions.. Few were related to my previous organisation
  • Q3. The interview went well... They did not contact me for anything... I was the one reaching them again and again
  • Q4. When I called them about the feedback... I was surprised, the HR said... Your feedback was not positive.... Hahaha 🤣... I was laughing at the moment... God only knows what they want..... The last question...
  • Q5. Don't waste your time... Even after a superb interview.. You will get to hear negative....Still All the best...

Interview Preparation Tips

Interview preparation tips for other job seekers - Was not happy with their interview process.... No advice...

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the process of developing an erection plan?
  • Ans. 

    Developing an erection plan involves creating a detailed strategy for the construction process.

    • Identify project requirements and objectives

    • Create a timeline for completion

    • Allocate resources and manpower

    • Coordinate with subcontractors and suppliers

    • Ensure compliance with building codes and regulations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and focused towars your goal

I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Aluminium formwork slab cycle, components, sqm work for per carpenters
  • Q2. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Ans. 

    The amount of sqm plastering done by a Mason per day depends on various factors such as the size of concrete blocks, workability, painting, and gypsum work.

    • The size of concrete blocks can affect the amount of plastering done per day.

    • Workability of the plastering material can also affect the speed of work.

    • Painting and gypsum work can add to the time required for plastering.

    • It is difficult to give an exact number for the...

  • Answered by AI
  • Q3. Conventional shuttering, BBS, steel weight per metre, field test for steel
  • Q4. Field concrete tests, cement, grade of concrete
Round 3 - HR 

(1 Question)

  • Q1. Reason for job change, why should we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil basics and site execution work to be have good knowledge
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Lattice tower Sub bracing design
  • Ans. 

    Lattice tower sub bracing design involves the structural support system for the tower.

    • Sub bracing design is crucial for maintaining the stability and strength of lattice towers.

    • The design should consider factors such as wind load, weight distribution, and material strength.

    • Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.

    • Computer-aided design software is often used...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About previous experience
  • Q2. Why i left all previous companies.
  • Ans. 

    I left previous companies to pursue growth opportunities, align with my career goals, and seek better work-life balance.

    • I left Company A after 3 years to seek a role that offered more leadership opportunities, as I wanted to develop my management skills.

    • At Company B, I transitioned to a new position that aligned better with my long-term career goals in project management.

    • I departed from Company C to find a work environ...

  • Answered by AI
Round 1 - Coding Test 

Debug C program

Round 2 - Technical 

(2 Questions)

  • Q1. What is pointer in C
  • Ans. 

    Pointer is a variable that stores the memory address of another variable in C programming language.

    • Pointers are used to manipulate data directly in memory

    • They are used to pass addresses of variables to functions

    • They can be used to create dynamic data structures like linked lists

    • Example: int *ptr; ptr = # *ptr = 10; //num now has value 10

  • Answered by AI
  • Q2. Reference tracker to point to memory location
  • Ans. 

    A reference tracker is used to point to a specific memory location.

    • A reference tracker is a variable that stores the memory address of another variable.

    • It is commonly used in programming languages like C++ and Java.

    • For example, in Java, the 'this' keyword is a reference tracker that points to the current object.

    • Reference trackers are useful for passing variables by reference instead of by value.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare from Let uS C by Yashwant Sinha to do well

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are KPI's for project
  • Ans. 

    Key Performance Indicators (KPIs) for projects are measurable metrics used to evaluate the success of a project.

    • KPIs should be specific, measurable, achievable, relevant, and time-bound (SMART)

    • Examples of project KPIs include budget variance, schedule adherence, quality metrics, customer satisfaction, and team performance

    • KPIs help project managers track progress, identify areas for improvement, and make data-driven dec

  • Answered by AI
  • Q2. 3M's are important in every project. Men, Material & Money

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well with respect to the Job description & your previous work experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
  • Ans. 

    I am a dedicated and experienced professional with a strong background in management and leadership.

    • Over 5 years of experience in management roles

    • Proven track record of successfully leading teams to achieve goals

    • Strong communication and problem-solving skills

    • Bachelor's degree in Business Administration from XYZ University

    • Passionate about developing and mentoring team members

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always let them know your full career with learn
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What was your experience like during the one-on-one interview with HR?
  • Ans. 

    The one-on-one interview with HR was professional and informative.

    • The HR representative was friendly and welcoming

    • The questions asked were relevant to the position and my experience

    • I was given a clear overview of the company culture and expectations

  • Answered by AI
  • Q2. What types of questions will the manager ask?
Round 2 - One-on-one 

(2 Questions)

  • Q1. Can you explain your previous work experience?
  • Ans. 

    I have 5 years of experience as a financial analyst at a Fortune 500 company.

    • Analyzed financial data to provide insights and recommendations

    • Created financial models to forecast future performance

    • Prepared reports for senior management

    • Collaborated with cross-functional teams on budgeting and forecasting

    • Identified cost-saving opportunities and efficiency improvements

  • Answered by AI
  • Q2. Salary negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - Married women with kid should not join this company

Oceaneering International Interview FAQs

What are the top questions asked in Oceaneering International Senior Billing Analyst interview?

Some of the top questions asked at the Oceaneering International Senior Billing Analyst interview -

  1. When I called them about the feedback... I was surprised, the HR said... Your f...read more
  2. Don't waste your time... Even after a superb interview.. You will get to hear n...read more
  3. They asked me to fill up a form before the final roun...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
View all
Design Engineer
94 salaries
unlock blur

₹4 L/yr - ₹12.5 L/yr

CAD Engg
55 salaries
unlock blur

₹3.2 L/yr - ₹6.8 L/yr

Network Engineer
43 salaries
unlock blur

₹4 L/yr - ₹16 L/yr

Senior Engineering Analyst
36 salaries
unlock blur

₹9 L/yr - ₹20 L/yr

Senior Design Engineer
28 salaries
unlock blur

₹8.1 L/yr - ₹17 L/yr

Explore more salaries
Compare Oceaneering International with

L&T Construction

4.0
Compare

Alstom Transportation

3.7
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview