Filter interviews by
I applied via Referral and was interviewed before Jun 2020. There were 4 interview rounds.
Formation width is the width of the prepared surface of the subgrade and the base course of a road or highway.
Formation width is the width of the prepared surface of the subgrade and the base course of a road or highway.
It is the width of the foundation of the road or highway.
It is important to ensure that the formation width is sufficient to support the weight of the traffic that will use the road or highway.
The forma...
Crown is the slope given to the surface of a road or highway to allow for proper drainage.
Crown is the highest point of the road surface, usually at the centerline.
It is designed to allow water to drain off the road surface and prevent pooling.
The slope of the crown depends on the road's width and the amount of rainfall in the area.
Crown is important for safety as it reduces the risk of hydroplaning and improves visibi...
PQC stands for Pavement Quality Concrete. It is a type of concrete used for road construction.
PQC is a high-quality concrete mix used for the top layer of road construction.
It is designed to provide a smooth and durable surface for vehicles to travel on.
PQC is typically used for highways, airports, and other high-traffic areas.
It is made with a higher strength and lower water-cement ratio than regular concrete.
PQC is a...
I applied via Referral and was interviewed before Dec 2019. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jan 2020. There were 3 interview rounds.
Billing codes are determined by the organization and industry standards.
Billing codes are used to identify specific products or services provided by an organization.
The codes are typically determined by the organization and may also follow industry standards.
Examples of billing codes include CPT codes for medical procedures and UPC codes for retail products.
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
posted on 27 Nov 2023
I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.
posted on 8 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
posted on 11 Jul 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.
The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.
The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.
The percentage can range from 25% to 100% depending on the design requirements.
Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space constrai...
posted on 31 Dec 2022
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
posted on 5 Jan 2023
based on 2 interviews
Interview experience
based on 75 reviews
Rating in categories
Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon