Filter interviews by
I applied via Walk-in and was interviewed in Oct 2024. There were 2 interview rounds.
My project involved coordinating the production of a new line of eco-friendly packaging materials.
Managed a team of production staff to ensure timely completion of orders
Implemented new sustainable practices to reduce waste and improve efficiency
Collaborated with suppliers to source environmentally friendly materials
Conducted quality control checks to maintain high standards of production
Successfully launched the new p
Top trending discussions
posted on 28 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
Automobiles parts information.
posted on 2 Jan 2025
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There were 2 interview rounds.
Operation Availability can be calculated by dividing the total operating time by the total time available.
Calculate the total operating time by subtracting downtime from total time.
Calculate the total time available, which is usually 24 hours a day, 7 days a week.
Divide the total operating time by the total time available to get the Operation Availability percentage.
Best performance is achieving goals efficiently and effectively while maintaining high quality standards.
Setting clear goals and objectives
Developing efficient production processes
Ensuring quality control measures are in place
Motivating and leading the production team
Consistently meeting or exceeding production targets
It is important to address the concerns of associates while also maintaining consistency in perk distribution.
Listen to the reasons behind the request for extra perks and assess if it is reasonable.
Communicate openly with associates about the fixed perk structure and the reasons behind it.
Consider alternative ways to reward associates such as performance-based bonuses or additional training opportunities.
Seek feedback ...
In the next 5 years, I see myself advancing to a senior production management role, leading a team of professionals and implementing innovative strategies to improve efficiency and quality.
Continuing to enhance my leadership skills through training and mentorship programs
Implementing new technologies to streamline production processes
Expanding my network within the industry to stay updated on the latest trends and best
I applied via Naukri.com and was interviewed before Oct 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
I was interviewed in Jan 2025.
Bernoulli's theorem states that an increase in the speed of a fluid occurs simultaneously with a decrease in pressure or a decrease in the fluid's potential energy.
Bernoulli's theorem is based on the principle of conservation of energy in fluid flow.
It states that in a steady flow of an incompressible and non-viscous fluid, the total energy remains constant along a streamline.
The theorem relates the pressure, velocity,...
Mechanical energy is the energy possessed by an object due to its motion or position, while electrical energy is the energy carried by electric currents.
Mechanical energy is related to the movement or position of an object, while electrical energy is related to the flow of electric charge.
Mechanical energy can be kinetic (energy of motion) or potential (energy of position), while electrical energy is the movement of el...
The coefficient of friction is a measure of the resistance to motion between two surfaces in contact.
The coefficient of friction is a dimensionless value that represents the ratio of the force of friction between two bodies to the force pressing them together.
It can be static (when the objects are not moving relative to each other) or kinetic (when they are in motion).
For example, rubber on concrete has a higher coeffi
Gravitational force increases as we go below the earth's surface.
Gravitational force is directly proportional to the mass of an object and inversely proportional to the square of the distance between the centers of the objects.
As we move closer to the center of the Earth, the distance between the center of the Earth and the object decreases, leading to an increase in gravitational force.
For example, a person standing o...
Pressure is the amount of force applied over a specific area, while force is a push or pull on an object.
Pressure is a scalar quantity, while force is a vector quantity.
Pressure is measured in units such as Pascals (Pa) or pounds per square inch (psi), while force is measured in units such as Newtons (N) or pounds (lbs).
Pressure can be distributed over a surface, while force is a single point application.
Example: Press...
I was interviewed in Dec 2024.
posted on 1 May 2024
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
posted on 13 Sep 2024
I applied via Campus Placement and was interviewed in Mar 2024. There were 3 interview rounds.
To apply my knowledge and skills in production engineering to contribute to the success of the organization.
To utilize my technical expertise in optimizing production processes and improving efficiency.
To work collaboratively with cross-functional teams to troubleshoot issues and implement solutions.
To ensure quality control measures are in place to meet production goals and standards.
To continuously learn and adapt to...
I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.
Bachelor's degree in Mechanical Engineering
5+ years of experience in production engineering
Proficient in CAD software and manufacturing processes
Led a team to improve production efficiency by 20% at my previous job
Yes, I am comfortable with location and willing to relocate if necessary.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
469
salaries
| ₹6 L/yr - ₹17.5 L/yr |
Territory Sales Manager
373
salaries
| ₹6.2 L/yr - ₹23.2 L/yr |
Deputy Manager
363
salaries
| ₹7.5 L/yr - ₹23.2 L/yr |
Territory Manager
335
salaries
| ₹5.8 L/yr - ₹25.3 L/yr |
Territory Service Manager
277
salaries
| ₹5.5 L/yr - ₹22 L/yr |
Bajaj Auto
Hero MotoCorp
Royal Enfield
Suzuki Motorcycle