Upload Button Icon Add office photos

Filter interviews by

Turner International Quantity Surveyor Interview Questions, Process, and Tips

Updated 16 Aug 2023

Turner International Quantity Surveyor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Complete system of HVAC
  • Ans. 

    The complete system of HVAC includes heating, ventilation, and air conditioning components that work together to provide comfort and maintain indoor air quality.

    • Heating: Furnaces, boilers, heat pumps

    • Ventilation: Air ducts, fans, air filters

    • Air Conditioning: Compressors, condensers, evaporators

    • Control Systems: Thermostats, sensors, actuators

    • Distribution: Ductwork, vents, registers

    • Examples: Central HVAC systems, split sy

  • Answered by AI
  • Q2. Quantification methodology of MEPF trade
  • Ans. 

    The quantification methodology of MEPF trade involves measuring and estimating the quantities of mechanical, electrical, plumbing, and fire protection systems in a construction project.

    • Identify the different MEPF systems involved in the project

    • Measure the quantities of each system based on design drawings and specifications

    • Estimate the quantities of materials, equipment, and labor required for each system

    • Consider facto...

  • Answered by AI
  • Q3. Unit of measurements
  • Ans. 

    Unit of measurements refers to the standard used to quantify or measure physical quantities.

    • Units of measurement are used in various fields such as construction, engineering, science, and commerce.

    • Common units of measurement include meters, kilograms, liters, seconds, and degrees Celsius.

    • Units can be categorized into different systems such as the metric system, imperial system, and US customary system.

    • Conversion factor...

  • Answered by AI
  • Q4. Boq preparation and basics
  • Q5. Rate analysis of material
  • Ans. 

    Rate analysis of material involves determining the cost of materials used in a construction project.

    • Rate analysis is a process of calculating the cost of materials per unit quantity.

    • It helps in estimating the total cost of materials required for a project.

    • Factors such as material rates, wastage, transportation costs, and taxes are considered in rate analysis.

    • For example, to calculate the rate of cement, the cost of cem...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared if you are coming and handy with Excel. Trades knowlege is must not too much technical knowledge but the basic and overall

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Company Website

Round 1 - Technical 

(9 Questions)

  • Q1. What is status of company
  • Ans. 

    The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.

    • Company has a strong financial position

    • Ongoing projects are in progress

    • Company has a good reputation in the industry

  • Answered by AI
  • Q2. What is job responsibilities
  • Q3. What is employee growth
  • Ans. 

    Employee growth refers to the development and advancement of an individual within their career.

    • Employee growth involves acquiring new skills and knowledge

    • It includes taking on more responsibilities and challenges

    • Career progression and promotions are indicators of employee growth

  • Answered by AI
  • Q4. What is action points at site level
  • Ans. 

    Action points at site level refer to specific tasks or activities that need to be completed on the construction site.

    • Action points are typically identified during site inspections or progress meetings.

    • They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.

    • Examples of action points could be revising drawings to address conflicts, obtaining necess...

  • Answered by AI
  • Q5. Talking with politely with client
  • Q6. Very day site round, observation point noted and review with team
  • Q7. Communication with our team, project achievements as per client requirement
  • Q8. Project target as per the P O terms
  • Q9. Internal discussion with project team and vendor
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via LinkedIn and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Have you had experience on international projects.?
  • Q2. Do you know POMI?
  • Q3. Current CTC and expected CTC.
  • Ans. 

    Current CTC is $50,000 and expected CTC is $60,000.

    • Current CTC: $50,000

    • Expected CTC: $60,000

    • Reason for increase in expected CTC: Additional qualifications and experience gained since current CTC was set

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. POMI related questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Get to know the basics of Quantity surveying and the measurement methods used.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Brief description about the requirements and job description.
Round 2 - Technical 

(1 Question)

  • Q1. Virtual Technical interview
Round 3 - Technical 

(1 Question)

  • Q1. Face to face technicsl interview

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. What is bank guarantee
  • Ans. 

    A bank guarantee is a promise from a bank to cover a specific amount of debt or liability on behalf of a borrower.

    • It is a type of financial instrument used to mitigate risk in business transactions.

    • It is often required by parties engaging in international trade or construction projects.

    • The bank guarantee ensures that the beneficiary will receive payment if the borrower fails to fulfill their obligations.

    • Types of bank g...

  • Answered by AI
  • Q2. The formula of duct areas
  • Ans. 

    The formula for duct areas is used to calculate the cross-sectional area of a duct.

    • The formula for rectangular ducts is A = l x w

    • The formula for circular ducts is A = πr²

    • The formula for oval ducts is A = πab/4

    • A represents the cross-sectional area of the duct

    • l represents the length of the duct

    • w represents the width of the duct

    • r represents the radius of the duct

    • a and b represent the major and minor axes of the oval duct

  • Answered by AI
  • Q3. Proficiency with Excel and AutoCAD
  • Q4. Rate analysis of different items
  • Ans. 

    Rate analysis involves calculating the cost of different items in a construction project.

    • Rate analysis is used to estimate the cost of materials, labor, and equipment for each item in a project.

    • It involves breaking down the cost of each item into its components, such as the cost of materials, labor, and overhead.

    • Examples of items that require rate analysis include excavation, concrete work, electrical work, and plumbin...

  • Answered by AI
  • Q5. BOQ preperation and technical details of products
  • Q6. Method of measurement for various products and conversion factor
  • Ans. 

    Method of measurement and conversion factors are crucial for MEP Quantity Surveyor.

    • Understand the standard method of measurement for each product

    • Be aware of the conversion factors for different units of measurement

    • Use software tools to assist with calculations and conversions

    • Examples of units of measurement include square meters, cubic meters, and linear meters

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Majorly they go with billing and auditing work. Work culture is very good here and no politics

I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Brief introduction about previous experience and education
Round 3 - Technical 

(1 Question)

  • Q1. Question related to current market practice

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't loss your confidence in front of interviewer and dont compromise with attitude

I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Assignment 

Drawing study, output BOQ etc.

Round 3 - Group Discussion 

Face to face interview

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Be on time
2. Be true yourself, honest.
3. Look offical, neat and tidy.

Interview Questionnaire 

1 Question

  • Q1. International Code of measurement
  • Ans. 

    The International Code of Measurement is a standard for measuring construction works globally.

    • The code provides guidelines for measuring and quantifying construction works.

    • It ensures consistency in measurement and helps avoid disputes.

    • It covers areas such as measurement of quantities, units of measurement, and presentation of measurements.

    • Examples of codes include SMM7, CESMM3, and POMI.

    • The code is used by quantity sur...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - International code of measurements

I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Most of them are related to job description and also with the estimation and detail technical oriented.

Interview Preparation Tips

Interview preparation tips for other job seekers - As usual an interview can only be crack by knowledge in the field suitable to the role.

Turner International Interview FAQs

How many rounds are there in Turner International Quantity Surveyor interview?
Turner International interview process usually has 2 rounds. The most common rounds in the Turner International interview process are Resume Shortlist and Technical.
What are the top questions asked in Turner International Quantity Surveyor interview?

Some of the top questions asked at the Turner International Quantity Surveyor interview -

  1. Quantification methodology of MEPF tr...read more
  2. Complete system of H...read more
  3. Rate analysis of mater...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Turner International interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Turner International Quantity Surveyor Salary
based on 33 salaries
₹3.5 L/yr - ₹8.2 L/yr
7% more than the average Quantity Surveyor Salary in India
View more details

Turner International Quantity Surveyor Reviews and Ratings

based on 3 reviews

4.3/5

Rating in categories

4.3

Skill development

4.2

Work-Life balance

4.2

Salary & Benefits

4.3

Job Security

5.0

Company culture

3.9

Promotions/Appraisal

4.3

Work Satisfaction

Explore 3 Reviews and Ratings
Quantity Surveyor
33 salaries
unlock blur

₹3.5 L/yr - ₹8.2 L/yr

Project Engineer
10 salaries
unlock blur

₹5.5 L/yr - ₹12.5 L/yr

Construction Management
8 salaries
unlock blur

₹15 L/yr - ₹25 L/yr

Assistant Costing Manager
8 salaries
unlock blur

₹5.8 L/yr - ₹8.3 L/yr

Project Coordinator
6 salaries
unlock blur

₹7 L/yr - ₹9.7 L/yr

Explore more salaries
Compare Turner International with

Sony Pictures Networks

3.8
Compare

Zee Entertainment Enterprises

3.5
Compare

Viacom18 Media

3.5
Compare

Discovery Inc

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview