Round 1 - Technical 

(1 Question)

  • Q1. What do you want to work at this company
  • Ans. Iam a fresher so i will be more dedicated to my work adptalble and also hardworking
  • Answered Anonymously
Round 2 - Aptitude Test 

What are your major strengyh and weeknesss

Interview Preparation Tips

Interview preparation tips for other job seekers - Pump your self UP and stay positive

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How mane year experience
  • Q2. I'm interested sir
  • Q3. Total 18 year experience in power plant & oil and gas plant
  • Ans. 

    I have a total of 18 years of experience in power plant and oil and gas plant.

    • Experience includes working on various projects in power plant and oil and gas plant

    • Knowledge of electrical systems, equipment, and regulations in these industries

    • Hands-on experience in maintenance, troubleshooting, and project management

    • Strong understanding of safety protocols and procedures in high-risk environments

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Find your information
  • Q2. Site Work related questions
Round 3 - Others 

(1 Question)

  • Q1. Project Related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Fyi
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How many years experience do you have in this field? 15 Years
  • Q2. What are the problems have you faced and the solution find out?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confidence on the presentation/answer against the question relating to the job has been handled/ wotked on the site

Turner International Interview FAQs

How many rounds are there in Turner International Site Supervisor interview?
Turner International interview process usually has 2 rounds. The most common rounds in the Turner International interview process are Technical and Aptitude Test.

Tell us how to improve this page.

Quantity Surveyor
33 salaries
unlock blur

₹3.5 L/yr - ₹8.2 L/yr

Project Engineer
10 salaries
unlock blur

₹5.5 L/yr - ₹12.5 L/yr

Construction Management
8 salaries
unlock blur

₹15 L/yr - ₹25 L/yr

Assistant Costing Manager
8 salaries
unlock blur

₹5.8 L/yr - ₹8.3 L/yr

Project Coordinator
6 salaries
unlock blur

₹7 L/yr - ₹9.7 L/yr

Explore more salaries
Compare Turner International with

Sony Pictures Networks

3.8
Compare

Zee Entertainment Enterprises

3.5
Compare

Viacom18 Media

3.5
Compare

Discovery Inc

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview