Upload Button Icon Add office photos

Filter interviews by

Tulip Infratech Interview Questions, Process, and Tips

Updated 24 Jan 2025

Top Tulip Infratech Interview Questions and Answers

View all 8 questions

Tulip Infratech Interview Experiences

Popular Designations

7 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(6 Questions)

  • Q1. Bar bending schedule
  • Q2. About the concrete
  • Q3. Site management
  • Q4. Planning & scheduling
  • Q5. Brickwork & mortar
  • Q6. Cement and his ration

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - HR 

(2 Questions)

  • Q1. What is the expected salary for this position?
  • Ans. 

    The expected salary for an Assistant Safety Officer varies depending on factors such as location, industry, experience, and qualifications.

    • Salaries can range from $40,000 to $70,000 per year.

    • Higher salaries are typically offered in industries such as oil and gas, construction, and manufacturing.

    • Experience and additional certifications can lead to higher salary offers.

    • Location also plays a significant role in determinin...

  • Answered by AI
  • Q2. What facilities will be available?

Assistant Safety Officer Interview Questions asked at other Companies

Q1. What is safety
View answer (25)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. RCC basics and design concepts
  • Q2. Geotechnical engineering tests
  • Q3. Building materials

Civil Site Supervisor Interview Questions asked at other Companies

Q1. Which survey in earths 🌍 measurement Survay carefully?
View answer (2)

Store Officer Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2022

I applied via Job Fair and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

Bihar board 12th pass and k y p computer course b.a 1 St year

Round 3 - Technical 

(3 Questions)

  • Q1. Computer knowledge data entry
  • Q2. Work knowledge supervision
  • Q3. Handover working knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Tulip infratech Pvt Ltd I have to work Store kipper ya data entry and supervision

Store Officer Interview Questions asked at other Companies

Q1. Which Advance excel used for inventory..?
View answer (5)

Tulip Infratech interview questions for popular designations

 QA QC Executive

 (1)

 Software Engineer

 (1)

 Assistant Safety Officer

 (1)

 Civil Engineer

 (1)

 Civil Site Supervisor

 (1)

 Store Officer

 (1)

 Store Incharge

 (1)

Interview Questionnaire 

3 Questions

  • Q1. Good Commuction
  • Q2. Any time quick response
  • Q3. Always your team work

Interview Preparation Tips

Interview preparation tips for other job seekers - no

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

Software Engineer Interview Questions & Answers

user image saumya raichurkar

posted on 20 Jul 2021

Interview Questionnaire 

1 Question

  • Q1. Oops concepts ,Database , MVC basic and C sharp concepts

Software Engineer Interview Questions asked at other Companies

Q1. Bridge and torch problem : Four people come to a river in the night. There is a narrow bridge, but it can only hold two people at a time. They have one torch and, because it's night, the torch has to be used when crossing the bridge. Person... read more
View answer (223)

Jobs at Tulip Infratech

View all

QA QC Executive Interview Questions & Answers

user image VISHNU BISHNOI

posted on 4 May 2019

Interview Questionnaire 

10 Questions

  • Q1. Sieve analysis of sand
  • Ans. 

    Sieve analysis is a method used to determine the particle size distribution of sand.

    • Sieve analysis involves passing a sample of sand through a series of sieves with different mesh sizes.

    • The sand is placed on the top sieve and shaken to separate particles based on size.

    • The weight of sand retained on each sieve is measured and used to calculate the percentage of sand in each size range.

    • The results of sieve analysis can b...

  • Answered by AI
  • Q2. Required capacity of ctm machine in KN to test a cube of m 40 grade
  • Ans. 

    The required capacity of the ctm machine in KN to test a cube of m 40 grade is dependent on the size of the cube and the testing standards.

    • The capacity of the ctm machine is determined by the maximum load it can apply to the cube during testing.

    • The cube size and testing standards determine the load requirements for testing.

    • The required capacity can be calculated using the formula: Required capacity = Cube size x Testin

  • Answered by AI
  • Q3. Plastering
  • Q4. Weight of cube
  • Ans. 

    The weight of a cube can be determined by measuring its dimensions and using the formula: weight = density x volume.

    • To determine the weight of a cube, measure its length, width, and height.

    • Calculate the volume of the cube by multiplying the length, width, and height.

    • Obtain the density of the material the cube is made of.

    • Multiply the density by the volume to get the weight of the cube.

  • Answered by AI
  • Q5. Precautions on cube mould before casting
  • Ans. 

    Precautions on cube mould before casting

    • Ensure the cube mould is clean and free from any debris or previous concrete residue

    • Apply a thin layer of oil or release agent to the inner surfaces of the mould to prevent sticking

    • Check for any cracks or damage in the mould and replace if necessary

    • Ensure the mould is properly aligned and securely fastened to prevent any leakage

    • Use a vibrating table or vibrating rod to remove any...

  • Answered by AI
  • Q6. Frequency of cubes casting
  • Ans. 

    The frequency of cubes casting refers to how often cubes are made for testing purposes.

    • The frequency of cubes casting depends on the project requirements and quality standards.

    • It is common to cast cubes at regular intervals during construction projects.

    • The frequency may vary based on factors such as the type of concrete being used and the project timeline.

    • For example, in a large-scale construction project, cubes may be...

  • Answered by AI
  • Q7. Types of Admixture and their role
  • Ans. 

    Admixtures are substances added to concrete or mortar to enhance its properties.

    • Water-reducing admixtures: reduce the amount of water needed for the desired workability of concrete.

    • Retarding admixtures: delay the setting time of concrete, allowing more time for placement and finishing.

    • Accelerating admixtures: speed up the setting time of concrete, useful in cold weather conditions.

    • Air-entraining admixtures: create smal...

  • Answered by AI
  • Q8. Water cement ratio and its effect on concrete
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix. It affects the strength and durability of concrete.

    • Water cement ratio determines the workability of concrete. Higher water content makes the mix more fluid and easier to work with.

    • Excess water in the mix can lead to segregation and bleeding, resulting in a weaker and less durable concrete.

    • A lower water cement ratio pr...

  • Answered by AI
  • Q9. How can we reduce the water cement ratio
  • Ans. 

    The water cement ratio can be reduced by using less water or increasing the amount of cement in the mixture.

    • Use a lower water content in the mix

    • Increase the amount of cement in the mix

    • Use additives or admixtures to improve workability without increasing water content

    • Optimize the particle size distribution of the aggregates

    • Use a higher grade of cement

  • Answered by AI
  • Q10. Mix design proportion

Top Tulip Infratech QA QC Executive Interview Questions and Answers

Q1. Required capacity of ctm machine in KN to test a cube of m 40 grade
View answer (1)

QA QC Executive Interview Questions asked at other Companies

Q1. If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (1)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Great overview and opportunities

Round 3 - One-on-one 

(5 Questions)

  • Q1. What is real estate?
  • Ans. 

    Real estate refers to property consisting of land and the buildings on it, along with its natural resources such as crops, minerals, or water.

    • Real estate includes residential, commercial, and industrial properties.

    • Investing in real estate can provide rental income and potential appreciation in value.

    • Real estate agents help buyers and sellers navigate the buying and selling process.

    • Property management involves overseein

  • Answered by AI
  • Q2. Type of property
  • Ans. 

    Residential and commercial properties

    • Residential properties include houses, apartments, and condos

    • Commercial properties include office buildings, retail spaces, and warehouses

  • Answered by AI
  • Q3. What is your sales strategy
  • Ans. 

    My sales strategy involves building strong relationships with clients, understanding their needs, and providing tailored solutions.

    • Focus on building long-term relationships with clients

    • Understand the needs and pain points of each client

    • Provide personalized solutions to address client's specific needs

    • Regularly follow up with clients to ensure satisfaction and identify new opportunities

    • Utilize data and analytics to track

  • Answered by AI
  • Q4. Project and product knowledge
  • Q5. Why do you interestedin Real

Interview Preparation Tips

Interview preparation tips for other job seekers - Fine
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Group Discussion 

It was Good and average

Round 2 - HR 

(1 Question)

  • Q1. Introduction, goals, why sales etc.
Round 3 - One-on-one 

(2 Questions)

  • Q1. Why sales, interest etc.
  • Ans. 

    I am passionate about building relationships, meeting new people, and helping customers find solutions to their needs.

    • Enjoy interacting with people and building relationships

    • Thrilled by the challenge of meeting sales targets

    • Love the opportunity to help customers find solutions to their problems

  • Answered by AI
  • Q2. Sale something with expression
  • Ans. 

    I would like to introduce you to our latest product, which has been receiving rave reviews from customers.

    • Highlight the unique features and benefits of the product

    • Share customer testimonials or success stories

    • Offer a special promotion or discount to entice the customer to make a purchase

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Job kyon change kerna cahate ho
  • Q2. Kya salary accept hai appka

Tulip Infratech Interview FAQs

How many rounds are there in Tulip Infratech interview?
Tulip Infratech interview process usually has 1-2 rounds. The most common rounds in the Tulip Infratech interview process are Resume Shortlist, Technical and HR.
How to prepare for Tulip Infratech interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tulip Infratech. The most common topics and skills that interviewers at Tulip Infratech expect are Administration, Construction, Residential, Communication Skills and High Rise Building.
What are the top questions asked in Tulip Infratech interview?

Some of the top questions asked at the Tulip Infratech interview -

  1. Required capacity of ctm machine in KN to test a cube of m 40 gr...read more
  2. How can we reduce the water cement ra...read more
  3. Precautions on cube mould before casti...read more

Tell us how to improve this page.

Tulip Infratech Interview Process

based on 5 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.5
 • 23 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
JP Infra Interview Questions
3.7
 • 19 Interviews
DTC Projects Interview Questions
4.0
 • 17 Interviews
PS Group Interview Questions
3.8
 • 16 Interviews
ATS Homekraft Interview Questions
4.2
 • 16 Interviews
Bullmen Realty Interview Questions
3.0
 • 14 Interviews
View all

Tulip Infratech Reviews and Ratings

based on 80 reviews

3.7/5

Rating in categories

3.5

Skill development

3.6

Work-life balance

3.8

Salary

3.6

Job security

3.6

Company culture

3.5

Promotions

3.5

Work satisfaction

Explore 80 Reviews and Ratings
Human Resource Recruiter Male Only

Mumbai

5-10 Yrs

₹ 3-4.5 LPA

Explore more jobs
Civil Engineer
12 salaries
unlock blur

₹3.6 L/yr - ₹5.4 L/yr

Civil Site Engineer
10 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Site Engineer
10 salaries
unlock blur

₹2.4 L/yr - ₹7 L/yr

Senior Engineer
9 salaries
unlock blur

₹5.4 L/yr - ₹7.6 L/yr

Senior Civil Engineer
8 salaries
unlock blur

₹3 L/yr - ₹8.6 L/yr

Explore more salaries
Compare Tulip Infratech with

Realty Assistant

3.9
Compare

Kunal Structure

3.7
Compare

Omkar Realtors and Developers Group

3.8
Compare

HM Group

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview