I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
posted on 16 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.
posted on 11 Apr 2020
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve perf...
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 6 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 13 Jun 2021
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 24 Mar 2020
I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost re...
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with th
Assistant Manager
106
salaries
| ₹5.5 L/yr - ₹13.5 L/yr |
Senior Engineer
64
salaries
| ₹4.3 L/yr - ₹9.4 L/yr |
Assistant Engineer
54
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Deputy Manager
53
salaries
| ₹6 L/yr - ₹18 L/yr |
Engineer
49
salaries
| ₹4 L/yr - ₹7.2 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International