Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 4 interview rounds.
We are first approch to ROW issues
We are not give up to up and down ROW amounts
There are several types of insulators used in various industries.
There are three main types of insulators: pin insulators, suspension insulators, and strain insulators.
Pin insulators are used to support the conductors on the poles.
Suspension insulators are used to support the conductors from the crossarms.
Strain insulators are used to provide mechanical support to the conductors at the dead-end points.
Other types of in...
Concrete can be poured at a tower line by using a pump or a crane.
Use a concrete pump to transport and pour the concrete at the tower line.
Alternatively, a crane can be used to lift and pour the concrete.
Ensure that the concrete is mixed properly and has the right consistency for pouring.
Take necessary safety precautions while pouring concrete at heights.
Coordinate with the construction team to ensure a smooth and effi
Yes, I am familiar with instrument leveling.
Instrument leveling involves the process of ensuring that instruments are properly aligned and leveled for accurate measurements.
It is important in various fields such as construction, surveying, and engineering.
Examples of instruments that require leveling include theodolites, total stations, and laser levels.
The process typically involves using a leveling bubble or electron...
The tower selection at a road crossing depends on various factors such as signal strength, coverage area, and network provider.
Consider the signal strength of different towers at the road crossing
Choose the tower with the strongest signal to ensure better connectivity
Evaluate the coverage area of each tower to ensure it covers the desired location
Take into account the network provider and their reliability in the area
C...
The tower to select at the crossing depends on various factors such as signal strength, network coverage, and personal preferences.
Consider the signal strength of different towers at the crossing
Evaluate the network coverage provided by each tower
Take into account personal preferences, such as the preferred network provider or previous experience with a specific tower
Consider the type of services required, such as voic...
OPGW is usually installed after the transmission line is erected and before it is energized.
OPGW is installed on transmission lines to provide a communication path between substations
It is important to ensure that the OPGW is properly grounded to prevent electrical hazards
Installation of OPGW requires specialized equipment and trained personnel
The installation process involves stringing the OPGW cable along the transmi...
I was interviewed in May 2016.
Top trending discussions
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
The test was of 38 IQ questions where I had to select true or false with the right answer.
Typing test for 5 min where the accuracy of the typing speed was calculated.
I was interviewed in Dec 2024.
posted on 17 Dec 2024
I applied via LinkedIn and was interviewed in Nov 2024. There were 3 interview rounds.
Experienced project manager with a proven track record of successfully leading cross-functional teams to deliver projects on time and within budget.
Over 5 years of project management experience
Strong leadership and communication skills
Proficient in project management tools such as Asana and Jira
Managed a team of 10+ members to launch a new product within deadline
Passion for sales and interest in real estate led me to pursue a career in both fields.
I have always had a passion for sales and enjoy the challenge of meeting targets and building relationships with clients.
Real estate appeals to me because of the opportunity to work in a dynamic industry where every day is different.
I am drawn to the potential for growth and success in both sales and real estate.
English, Maths, Logical reasoning
posted on 10 Dec 2024
I applied via LinkedIn and was interviewed in Jun 2024. There was 1 interview round.
Experienced sales executive with a proven track record of exceeding targets and building strong client relationships.
Over 10 years of sales experience in the technology industry
Consistently met or exceeded sales targets by 20% each quarter
Built and maintained relationships with key clients such as ABC Company and XYZ Corporation
Strong negotiation and communication skills
Led a team of sales representatives to increase o
I have a proven track record of exceeding sales targets and building strong relationships with clients.
I have consistently exceeded sales targets in my previous roles by implementing effective sales strategies.
I have a strong network of clients and contacts in the industry that I can leverage to drive sales.
I am a skilled negotiator and have successfully closed high-value deals in the past.
I am highly motivated and dri...
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
SBU is Strategic Business Unit, BU is Business Unit, and Carpet area is the total area of a building excluding walls and other non-usable spaces.
SBU is a standalone business entity within a larger organization, focusing on a specific market segment.
BU is a division or department within a company that operates independently but is still part of the larger organization.
Carpet area refers to the total usable area of a bui...
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Balaji Enterprises
Viraaj Ventures
Mahaveer Group
Lansum Properties