Q1. What is the planning for maintenance, how it is proceed and how to help planning for equipment reliability, availability and plan adherence?

Ans.

Maintenance planning involves ensuring equipment reliability, availability, and adherence to plans.

  • Maintenance planning involves scheduling regular maintenance activities to ensure equipment reliability and availability.

  • This includes creating maintenance plans, scheduling maintenance activities, and tracking maintenance progress.

  • To help with equipment reliability, maintenance planning may involve identifying potential issues before they occur and taking preventative measures....read more

View 1 answer

Q2. How many types of confined space? What is conflicting job? What is simops work?

Ans.

Confined spaces can be classified into four types. Conflicting job is when two or more jobs are being performed simultaneously. Simops work is when multiple activities are being carried out in the same area.

  • There are four types of confined spaces: tanks, vessels, silos, and pits.

  • Conflicting job is when two or more jobs are being performed simultaneously in the same area, which can lead to safety hazards.

  • Simops work is when multiple activities are being carried out in the same...read more

Add your answer

Q3. If we can manage the issue without compliance, why should compliance is required? What is more essential?

Ans.

Compliance is essential for legal and ethical reasons.

  • Compliance ensures that the organization is following legal and ethical standards.

  • Non-compliance can result in legal and financial penalties.

  • Compliance also helps to build trust and credibility with stakeholders.

  • Managing an issue without compliance may be a short-term solution, but it can lead to long-term consequences.

  • Compliance is necessary to maintain a positive reputation and avoid damaging consequences.

Add your answer

Q4. How many days maximum work period will be permissible for continue work without taking rest?

Ans.

The maximum work period permissible without rest depends on the country's labor laws and the nature of the job.

  • The maximum work period varies by country and industry

  • In the US, the Fair Labor Standards Act mandates a maximum of 40 hours per week for non-exempt employees

  • Some jobs, such as truck driving, have specific regulations for maximum hours worked without rest

  • Employers should prioritize employee health and safety by providing adequate breaks and rest periods

Add your answer
Discover Maneesh Pharmaceuticals interview dos and don'ts from real experiences

Q5. Explain transformer? What is on transformer nameplate? Where is star connection used? Where is delta connection used?

Ans.

A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.

  • Transformer nameplate includes information such as rated power, voltage, current, frequency, and efficiency.

  • Star connection is used in power distribution systems to connect three-phase loads.

  • Delta connection is used in industrial applications where high current loads are present.

  • Transformers are essential in stepping up or stepping down voltage levels for ...read more

Add your answer

Q6. What is the availability, reliability of plant?

Ans.

Availability and reliability of a plant refer to its operational uptime and performance consistency.

  • Availability is the measure of how often a plant is operational and ready for use.

  • Reliability is the measure of how consistently a plant performs without failures or breakdowns.

  • Availability is usually expressed as a percentage, indicating the amount of time the plant is available for operation.

  • Reliability is often measured using metrics like Mean Time Between Failures (MTBF) an...read more

View 1 answer
Are these interview questions helpful?

Q7. Belt utilisation factor, how to manage shift, manpower handling & overall job profile from port to coal bunker & yard management also..

Ans.

Efficient belt utilisation, shift management, manpower handling, and yard management are crucial for smooth port to coal bunker operations.

  • Regular monitoring of belt utilisation factor to identify and address inefficiencies

  • Effective shift planning and scheduling to ensure optimal manpower utilisation

  • Proper training and skill development of staff to handle equipment and manage operations

  • Regular maintenance and upkeep of equipment to prevent breakdowns and delays

  • Efficient yard ...read more

Add your answer

Q8. How you would deal with multiple Union?

Ans.

To deal with multiple unions, I would establish open communication, prioritize common goals, and negotiate fairly.

  • Establish open communication with all unions to understand their concerns and priorities

  • Prioritize common goals and work towards finding solutions that benefit all parties

  • Negotiate fairly and transparently to build trust and maintain positive relationships

  • Create a framework for collaboration and conflict resolution

  • Ensure compliance with all legal requirements and ...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is your time duration for analytical fault diagnostic and Explain those faults?

Add your answer

Q10. what documents for pipin

Ans.

Documents required for piping design include P&IDs, equipment datasheets, piping specifications, and isometric drawings.

  • Piping and Instrumentation Diagrams (P&IDs) show the layout of piping systems and equipment.

  • Equipment datasheets provide information on the specifications of the equipment to be used in the piping design.

  • Piping specifications outline the materials, sizes, and standards to be followed for the piping design.

  • Isometric drawings show a 3D representation of the pi...read more

Add your answer

Q11. What have you done in mechanical Maintenance?

Ans.

I have extensive experience in mechanical maintenance, including overseeing preventive maintenance schedules, troubleshooting equipment issues, and implementing efficiency improvements.

  • Developed and implemented preventive maintenance programs to ensure optimal performance and longevity of mechanical equipment.

  • Performed regular inspections and maintenance tasks to identify and address potential issues before they caused major breakdowns.

  • Troubleshot and repaired mechanical equi...read more

View 1 answer

Q12. How many types of VFD you have been working for?

Add your answer

Q13. What electrical equipment's do you know about?

Ans.

I am familiar with various electrical equipment such as transformers, circuit breakers, relays, and motors.

  • Transformers

  • Circuit breakers

  • Relays

  • Motors

Add your answer

Q14. How much knowledge you have in PLC, Explain?

Add your answer

Q15. How you check fluid coupling oil level

Ans.

Fluid coupling oil level can be checked using a dipstick or sight glass.

  • Locate the dipstick or sight glass on the fluid coupling.

  • Remove the dipstick or check the sight glass to see the oil level.

  • If the oil level is low, add more oil until it reaches the recommended level.

  • Check the manufacturer's instructions for the recommended oil level and type.

  • Perform regular checks to ensure the oil level is maintained.

Add your answer

Q16. How do you belt joint

Ans.

Belt joint is a method used to connect two ends of a belt to form a continuous loop.

  • Belt joint is commonly used in conveyor systems to create an endless belt.

  • There are different types of belt joints, such as mechanical fasteners, vulcanization, and cold bonding.

  • Mechanical fasteners involve using metal clips or hooks to connect the belt ends.

  • Vulcanization uses heat and pressure to bond the belt ends together.

  • Cold bonding uses adhesives or solvents to join the belt ends.

  • The cho...read more

View 2 more answers

Q17. How many types of Mantance

Ans.

There are three types of maintenance: corrective, preventive, and predictive.

  • Corrective maintenance involves fixing a problem after it occurs.

  • Preventive maintenance involves regularly scheduled maintenance to prevent problems from occurring.

  • Predictive maintenance involves using data and analytics to predict when maintenance will be needed.

  • Examples of maintenance tasks include oil changes, equipment inspections, and software updates.

Add your answer

Q18. volves of isolation

Ans.

Isolation valves are used to control the flow of fluid in a piping system by opening or closing the valve.

  • Isolation valves are typically used to shut off flow completely or partially in a piping system.

  • They are commonly used for maintenance, repair, or emergency shutdown purposes.

  • Examples of isolation valves include ball valves, gate valves, and butterfly valves.

Add your answer

Q19. supports of piping

Ans.

Supports of piping are structures used to hold and guide piping systems in place.

  • Supports prevent sagging or movement of the piping system

  • Common types of supports include hangers, clamps, and anchors

  • Supports are designed based on the weight and thermal expansion of the piping system

  • Supports can be made of various materials such as steel, aluminum, or rubber

Add your answer

Q20. What is the IMS system

Ans.

IMS stands for Incident Management System, a comprehensive approach to managing emergencies and incidents.

  • IMS is a structured framework that provides a systematic approach to incident management.

  • It helps organizations effectively respond to and manage emergencies, disasters, and other incidents.

  • IMS includes various components such as command structure, communication protocols, resource management, and documentation.

  • It promotes coordination and collaboration among different ag...read more

Add your answer

Q21. Factors affecting ob cables

Ans.

Factors affecting OB cables

  • Environmental factors such as temperature, humidity, and exposure to chemicals

  • Physical factors such as bending, twisting, and tension

  • Electrical factors such as interference and voltage

  • Quality of materials and manufacturing processes

  • Length and diameter of the cable

  • Usage and application of the cable

  • Maintenance and handling of the cable

Add your answer

Q22. Coal Handling system Operation

Ans.

Coal handling system operation involves the handling, transportation, and storage of coal in power plants.

  • Coal is transported to the power plant by rail, truck, or conveyor belt.

  • Once at the plant, coal is unloaded and stored in coal bunkers.

  • Coal is then fed into boilers for combustion to generate steam for electricity production.

  • Ash and other byproducts are collected and disposed of properly.

  • Regular maintenance and inspections are crucial to ensure smooth operation.

Add your answer

Q23. How to work at site

Ans.

Working at a site requires proper planning, communication, and safety measures.

  • Plan the work schedule and tasks to be completed

  • Ensure proper communication with team members and supervisors

  • Follow safety protocols and wear appropriate gear

  • Regularly inspect equipment and tools for any damage or malfunction

  • Maintain a clean and organized work area

  • Be aware of potential hazards and take necessary precautions

  • Document progress and report any issues to the supervisor

Add your answer

Q24. What is bearing

Ans.

Bearing is a mechanical component that supports a rotating shaft or axle.

  • Bearing reduces friction between moving parts

  • It allows smooth and efficient rotation of the shaft

  • Common types include ball bearings, roller bearings, and sleeve bearings

Add your answer

Q25. Quality requirements at site

Ans.

Quality requirements at site include adherence to specifications, standards, and regulations to ensure safety and durability of structures.

  • Adherence to project specifications and standards is crucial for quality assurance.

  • Regular inspections and quality control measures should be implemented to identify and rectify any deviations from requirements.

  • Use of high-quality materials and skilled labor is essential for ensuring the durability and safety of structures.

  • Compliance with ...read more

Add your answer

Q26. Favorite subject

Ans.

My favorite subject is Mechanical Engineering because I enjoy designing and analyzing systems and structures.

  • I enjoy learning about thermodynamics, fluid mechanics, and materials science

  • I like applying theoretical knowledge to real-world problems

  • I find joy in working on projects like designing a new engine or optimizing a manufacturing process

Add your answer

Q27. Experience in Q4.0

Ans.

Experience in Q4.0

  • Implemented Quality 4.0 principles in previous role

  • Utilized advanced technologies like AI, IoT, and data analytics for quality improvement

  • Implemented real-time monitoring and predictive maintenance systems

  • Used digital tools for quality control and process optimization

  • Implemented automated quality inspection systems

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Maneesh Pharmaceuticals

based on 18 interviews in the last 1 year
Interview experience
4.1
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.5
 • 652 Interview Questions
4.2
 • 346 Interview Questions
4.1
 • 266 Interview Questions
3.9
 • 209 Interview Questions
4.4
 • 197 Interview Questions
4.2
 • 135 Interview Questions
View all
Top TKIL Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter