Upload Button Icon Add office photos

Filter interviews by

Thermax Babcock Wilcox Energy Solutions Interview Questions, Process, and Tips

Updated 10 Dec 2024

Top Thermax Babcock Wilcox Energy Solutions Interview Questions and Answers

View all 13 questions

Thermax Babcock Wilcox Energy Solutions Interview Experiences

Popular Designations

18 interviews found

I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Explain about steam,water, flue gas,ash handling, Fuel handling system?? What is SSC AND SFC? what is meaning of Boiler,type of Boiler?? Specification of Boiler and Turbine?? DCS system of automation? WHAT is FCV and Feed contact stations,what is three or single element system??much more about turbine.
  • Ans. 

    The Control Room Engineer is expected to have knowledge about steam, water, flue gas, ash handling, fuel handling system, boiler, turbine, DCS system of automation, FCV, feed contact stations, and three or single element system.

    • Steam is used to generate power in a power plant.

    • Water is used as a coolant in the condenser.

    • Flue gas is the exhaust gas from the combustion process.

    • Ash handling system is used to handle the ash...

  • Answered by AI
  • Q2. Turbine specifications?
  • Ans. 

    Turbine specifications refer to the technical details of the turbine used in power generation.

    • Turbine specifications include the type of turbine, its capacity, efficiency, and operating conditions.

    • The type of turbine can be either steam or gas turbine.

    • Capacity refers to the amount of power the turbine can generate.

    • Efficiency is the ratio of the energy output to the energy input.

    • Operating conditions include the temperat...

  • Answered by AI
  • Q3. How does fuel handling system works?
  • Ans. 

    Fuel handling system manages the storage, transfer, and distribution of fuel to the power plant.

    • Fuel is stored in large tanks and transported to the power plant through pipelines.

    • The fuel is then transferred to the boiler where it is burned to produce steam.

    • The steam is then used to turn the turbines which generate electricity.

    • The system also includes safety measures to prevent accidents and ensure proper functioning.

    • R...

  • Answered by AI
  • Q4. What is basic of Boiler and it's purpose in Industrial usage?
  • Ans. 

    A boiler is a closed vessel that generates steam by heating water. It is used in various industries for heating and power generation.

    • Boilers are used in industries such as power generation, chemical processing, and food and beverage production.

    • The basic purpose of a boiler is to convert water into steam, which can be used for heating, power generation, or other industrial processes.

    • Boilers work by heating water to its ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be practiced and prepared for what your are learning and practicing on practical equipment,Don't give unknown or wrong answer when you really don't know be honest and givevthem a confidence that you can handle critical situations.

Control Room Engineer Interview Questions asked at other Companies

Q1. How many percentage setting line safety valve.
View answer (10)

Process Engineer Interview Questions & Answers

user image Shubhankar Joshi

posted on 23 Aug 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

Process Engineer Interview Questions asked at other Companies

Q1. What is APQP and where is it used. And how many phases does it have? and fmea which phase are performed?
View answer (2)
Thermax Babcock Wilcox Energy Solutions Interview Questions and Answers for Freshers
illustration image
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to work here . Culture is good.

Senior Planning Engineer Interview Questions asked at other Companies

Q1. What is MIS? and how it prepare.
View answer (1)

Thermax Babcock Wilcox Energy Solutions interview questions for popular designations

 Commissioning Engineer

 (2)

 Process Engineer

 (2)

 HR Administrator

 (1)

 Automation Engineer

 (1)

 Electrical & Instrumentation Engineer

 (1)

 Executive

 (1)

 Mechanical Engineer

 (1)

 Senior Planning Engineer

 (1)

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2022. There were 4 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and conceptualiy ready.

Commissioning Engineer Interview Questions asked at other Companies

Q1. What is your expertise in water and waste water treatment plant
View answer (2)

Interview Questions & Answers

user image Anonymous

posted on 13 Jan 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be praper with your last year project
And some basic think about boiler
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Do basics perfect

Automation Engineer Interview Questions asked at other Companies

Q1. 16) What is modbus ? Types of modbus? How many slaves we can connect to one master
View answer (1)

I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always ask whether he are going to depute. Because site accommodation and traveling experience is to poor on site.

Electrical & Instrumentation Engineer Interview Questions asked at other Companies

Q1. How much size of cable required for giving supply of 15 kW motor??
View answer (2)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare technical stuff for any position in this company.
People here are very good technically (especially Process & Mechanical engineering departments).

Processing Executive Interview Questions asked at other Companies

Q1. What is meant by quality and brief explanation of it with an example?
View answer (62)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - whenever going for the interview, just take out the job details first, accordingly prepare for the interview considering the product manufactured by company

Process Engineer Interview Questions asked at other Companies

Q1. What is APQP and where is it used. And how many phases does it have? and fmea which phase are performed?
View answer (2)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Dec 2021.

Interview Preparation Tips

Interview preparation tips for other job seekers - Thermax is a good platform to enhanced the knowledge

Service Engineer Interview Questions asked at other Companies

Q1. What are the compulsory policy excess in four wheeler private vehicles?
View answer (12)
Contribute & help others!
anonymous
You can choose to be anonymous

Thermax Babcock Wilcox Energy Solutions Interview FAQs

How many rounds are there in Thermax Babcock Wilcox Energy Solutions interview?
Thermax Babcock Wilcox Energy Solutions interview process usually has 2-3 rounds. The most common rounds in the Thermax Babcock Wilcox Energy Solutions interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Thermax Babcock Wilcox Energy Solutions interview?

Some of the top questions asked at the Thermax Babcock Wilcox Energy Solutions interview -

  1. Explain about steam,water, flue gas,ash handling, Fuel handling system?? What...read more
  2. Which welding types Ans T,joints But,joints Iab,joints Cornar,joints Aej,joints...read more
  3. What is basic of Boiler and it's purpose in Industrial usa...read more
How long is the Thermax Babcock Wilcox Energy Solutions interview process?

The duration of Thermax Babcock Wilcox Energy Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

INTERVIEWS

Hyundai Construction Equipment

No Interviews

CAMPUS PLACEMENT

Indian Institute of Technology (IIT), Gandhinagar

INTERVIEWS

Thermax Babcock Wilcox Energy Solutions

No Interviews

INTERVIEWS

Kirloskar Toyota Textile Machinery

No Interviews

INTERVIEWS

Thyssenkrupp Industrial Solutions

No Interviews

INTERVIEWS

Hyundai Construction Equipment

No Interviews

INTERVIEWS

Puzzolana Machinery Fabricators

No Interviews

INTERVIEWS

Thyssenkrupp Industrial Solutions

No Interviews

SALARIES

Thermax Babcock Wilcox Energy Solutions

SALARIES

Thermax Babcock Wilcox Energy Solutions

Tell us how to improve this page.

Thermax Babcock Wilcox Energy Solutions Interview Process

based on 18 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 420 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
GE Vernova Interview Questions
4.2
 • 83 Interviews
View all

Fast track your campus placements

View all

Thermax Babcock Wilcox Energy Solutions Reviews and Ratings

based on 280 reviews

4.2/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.5

Salary

4.3

Job security

4.2

Company culture

3.2

Promotions

3.8

Work satisfaction

Explore 280 Reviews and Ratings
Process Engineer
49 salaries
unlock blur

₹2 L/yr - ₹10 L/yr

Production Engineer
46 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Assistant Manager
45 salaries
unlock blur

₹8.5 L/yr - ₹15 L/yr

Deputy Manager
32 salaries
unlock blur

₹9.5 L/yr - ₹21.6 L/yr

Senior Executive
28 salaries
unlock blur

₹6.5 L/yr - ₹11.3 L/yr

Explore more salaries
Compare Thermax Babcock Wilcox Energy Solutions with

BHEL

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Siemens

4.1
Compare

GE Vernova

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent