Yes, I have experience working on boilers in previous roles.
I have experience with boiler maintenance, troubleshooting, and repair.
I am familiar with different types of boilers such as fire tube, water tube, and electric boilers.
I have worked on optimizing boiler efficiency and ensuring compliance with safety regulations.
I have conducted regular inspections and tests to ensure proper functioning of boilers.
I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Dec 2022. There were 4 interview rounds.
Easily done and can be qualified.
The topic was relevant to Covid and inter personal things.
Types of boilers include fire tube, water tube, and electric boilers. Installation process involves site preparation, assembly, piping, and testing.
Types of boilers: fire tube, water tube, electric
Installation process: site preparation, assembly, piping, testing
Examples: Fire tube boiler - used in small industrial plants, Water tube boiler - used in power stations
Thermax offers a wide range of products including boilers, heaters, chillers, water treatment solutions, and waste heat recovery systems.
Boilers
Heaters
Chillers
Water treatment solutions
Waste heat recovery systems
Thermax Babcock Wilcox Energy Solutions interview questions for popular designations
I applied via Campus Placement and was interviewed in Dec 2022. There were 3 interview rounds.
Cod language, fiend missing number , English grammar
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
40 questions based on aptitude & Mechanical,coding domain
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Referral
I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
I was interviewed before Dec 2021.
Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.
Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.
APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...
To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.
Ash seave analysis can help identify the particle size distribution of the ash.
The LOI can be reduced by controlling the combustion process and ensuring complete combustion.
Adding additives like limestone or activated carbon can also help reduce LOI.
Proper maintenance of the boiler and ash handling system can also prev...
Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.
Boiler efficiency is the ratio of energy output to energy input and is a measure of how well the boiler is converting fuel into heat.
APC Heat rate is the amount of heat energy required to produce a unit of electricity and is a measure of the efficiency of a power plant.
Coal GCV (Gross Calorific Value) is a mea...
To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.
Adjusting the combustion process to reduce unburnt carbon in the ash
Using additives like limestone or activated carbon to reduce LOI
Optimizing the temperature and residence time in the furnace
Improving the ash collection system to prevent contamination
Using advanced separation techniques like electrostatic precipitator...
Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.
Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.
APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...
To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.
Adjusting the combustion process to reduce unburnt carbon in the ash
Using additives like limestone or activated carbon to reduce LOI
Optimizing the temperature and residence time in the furnace
Improving the ash collection system to prevent contamination
Using advanced separation techniques like electrostatic precipitator...
Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.
Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.
APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...
To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.
Adjusting the combustion process to reduce unburnt carbon
Optimizing the temperature and residence time in the furnace
Using additives like limestone or activated carbon
Improving the collection efficiency of the ash
Using advanced separation techniques like electrostatic precipitators or bag filters
Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.
Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.
APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...
To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.
Adjusting the combustion process to reduce unburnt carbon
Controlling the temperature of the combustion process
Using additives like limestone to reduce LOI
Optimizing the ash collection system
Regular maintenance of the equipment
Proper storage and handling of the ash
Recycling the ash for beneficial use
Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.
Boiler efficiency is the ratio of energy output to energy input.
APC Heat rate is the amount of heat energy required to produce a unit of electricity.
Coal GCV is the Gross Calorific Value of coal, which is the amount of heat energy released when a unit of coal is burned.
These factors are interrelated and affect...
To reduce LOI of Bed Ash and Fly Ash, ash sieve analysis can be done and the following pointers can be followed.
Perform ash sieve analysis to determine the particle size distribution
Increase the temperature of the furnace to reduce LOI
Add additives like limestone or dolomite to reduce LOI
Optimize combustion parameters to reduce LOI
Use advanced combustion technologies like fluidized bed combustion to reduce LOI
Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.
Boiler efficiency refers to the percentage of heat generated by the boiler that is actually utilized for generating steam.
APC Heat rate is the amount of heat energy required to produce a unit of electricity.
Coal GCV (Gross Calorific Value) is the amount of heat energy released when a unit of coal is burned.
Hig...
To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.
Adjusting the combustion process to reduce unburned carbon in the ash
Using additives like limestone or activated carbon to reduce LOI
Optimizing the temperature and residence time in the furnace
Improving the ash collection system to minimize the amount of unburned carbon in the ash
Using advanced ash beneficiation techni...
Top trending discussions
Some of the top questions asked at the Thermax Babcock Wilcox Energy Solutions interview -
The duration of Thermax Babcock Wilcox Energy Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 18 interviews
Interview experience
based on 278 reviews
Rating in categories
Process Engineer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
28
salaries
| ₹0 L/yr - ₹0 L/yr |
BHEL
Larsen & Toubro Limited
Siemens
GE Vernova