Thermax Babcock Wilcox Energy Solutions Interview Questions, Process, and Tips

Updated 10 Dec 2024

Top Thermax Babcock Wilcox Energy Solutions Interview Questions and Answers

View all 13 questions

Thermax Babcock Wilcox Energy Solutions Interview Experiences

Popular Designations

18 interviews found

Process Engineer Interview Questions & Answers

user image Shubhankar Joshi

posted on 23 Aug 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Have you worked on boilers before?
  • Ans. 

    Yes, I have experience working on boilers in previous roles.

    • I have experience with boiler maintenance, troubleshooting, and repair.

    • I am familiar with different types of boilers such as fire tube, water tube, and electric boilers.

    • I have worked on optimizing boiler efficiency and ensuring compliance with safety regulations.

    • I have conducted regular inspections and tests to ensure proper functioning of boilers.

  • Answered by AI

Process Engineer Interview Questions asked at other Companies

Q1. What is APQP and where is it used. And how many phases does it have? and fmea which phase are performed?
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Boiler parts, cooling tower, Pump & Moters, conveyors.
Round 2 - HR 

(1 Question)

  • Q1. Ready to relocate anytime.

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)
Thermax Babcock Wilcox Energy Solutions Interview Questions and Answers for Freshers
illustration image
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Base on experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to work here . Culture is good.

Senior Planning Engineer Interview Questions asked at other Companies

Q1. What is MIS? and how it prepare.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Aptitude Test 

Easily done and can be qualified.

Round 3 - Group Discussion 

The topic was relevant to Covid and inter personal things.

Round 4 - One-on-one 

(2 Questions)

  • Q1. What are the types of boilers and and process of its installation?
  • Ans. 

    Types of boilers include fire tube, water tube, and electric boilers. Installation process involves site preparation, assembly, piping, and testing.

    • Types of boilers: fire tube, water tube, electric

    • Installation process: site preparation, assembly, piping, testing

    • Examples: Fire tube boiler - used in small industrial plants, Water tube boiler - used in power stations

  • Answered by AI
  • Q2. What is Thermax product portfolio where you had heard about Thermax?
  • Ans. 

    Thermax offers a wide range of products including boilers, heaters, chillers, water treatment solutions, and waste heat recovery systems.

    • Boilers

    • Heaters

    • Chillers

    • Water treatment solutions

    • Waste heat recovery systems

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and conceptualiy ready.

Commissioning Engineer Interview Questions asked at other Companies

Q1. What is your expertise in water and waste water treatment plant
View answer (2)

Thermax Babcock Wilcox Energy Solutions interview questions for popular designations

 Commissioning Engineer

 (2)

 Process Engineer

 (2)

 HR Administrator

 (1)

 Automation Engineer

 (1)

 Electrical & Instrumentation Engineer

 (1)

 Executive

 (1)

 Mechanical Engineer

 (1)

 Senior Planning Engineer

 (1)

Interview Questions & Answers

user image Anonymous

posted on 13 Jan 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Cod language, fiend missing number , English grammar

Round 3 - HR 

(3 Questions)

  • Q1. Why did you decide to apply to this role? ... What experience do you have that would be relevant to this role? ... Tell me about your experience in … ... What did you like most about the job description? ....
  • Q2. Tell Me About Yourself. ... Why Are You the Best Person for the Job? ... Why Do You Want This Job? ... How Has Your Experience Prepared You for This Role? ... Why Are You Leaving (or Have Left) Your Job? ....
  • Q3. Why Are You Leaving (or Have Left) Your Job? ... What Is Your Greatest Strength? ... What Is Your Greatest Weakness

Interview Preparation Tips

Interview preparation tips for other job seekers - Be praper with your last year project
And some basic think about boiler
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all Resume tips
Round 2 - Aptitude Test 

40 questions based on aptitude & Mechanical,coding domain

Round 3 - Technical 

(1 Question)

  • Q1. Basic coding skills & Mechanical concepts

Interview Preparation Tips

Interview preparation tips for other job seekers - Do basics perfect

Automation Engineer Interview Questions asked at other Companies

Q1. 16) What is modbus ? Types of modbus? How many slaves we can connect to one master
View answer (1)

I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Most Questions is asked from the past experience depending from the sector you served.
  • Q2. Want to your perspective regarding the job.
Round 3 - HR 

(1 Question)

  • Q1. After technical round. they only discuss your compensation from the past and you expected. They will send some documents to fill.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always ask whether he are going to depute. Because site accommodation and traveling experience is to poor on site.

Electrical & Instrumentation Engineer Interview Questions asked at other Companies

Q1. How much size of cable required for giving supply of 15 kW motor??
View answer (2)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Mostly technical questions with examples of practical applications since I was a fresher.
Round 3 - HR 

(1 Question)

  • Q1. Only background & salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare technical stuff for any position in this company.
People here are very good technically (especially Process & Mechanical engineering departments).

Processing Executive Interview Questions asked at other Companies

Q1. What is meant by quality and brief explanation of it with an example?
View answer (62)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Asked about the project done in Mtech
  • Q2. Asked details about the Rankine Cycle
  • Q3. Boiler Cycle has been Asked

Interview Preparation Tips

Interview preparation tips for other job seekers - whenever going for the interview, just take out the job details first, accordingly prepare for the interview considering the product manufactured by company

Process Engineer Interview Questions asked at other Companies

Q1. What is APQP and where is it used. And how many phases does it have? and fmea which phase are performed?
View answer (2)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Dec 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Why you switch the previous job
Round 3 - Technical 

(15 Questions)

  • Q1. Technical question about boilers only
  • Q2. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q3. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Ash seave analysis can help identify the particle size distribution of the ash.

    • The LOI can be reduced by controlling the combustion process and ensuring complete combustion.

    • Adding additives like limestone or activated carbon can also help reduce LOI.

    • Proper maintenance of the boiler and ash handling system can also prev...

  • Answered by AI
  • Q4. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is a measure of how well the boiler is converting fuel into heat.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is a measure of the efficiency of a power plant.

    • Coal GCV (Gross Calorific Value) is a mea...

  • Answered by AI
  • Q5. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon in the ash

    • Using additives like limestone or activated carbon to reduce LOI

    • Optimizing the temperature and residence time in the furnace

    • Improving the ash collection system to prevent contamination

    • Using advanced separation techniques like electrostatic precipitator...

  • Answered by AI
  • Q6. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q7. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon in the ash

    • Using additives like limestone or activated carbon to reduce LOI

    • Optimizing the temperature and residence time in the furnace

    • Improving the ash collection system to prevent contamination

    • Using advanced separation techniques like electrostatic precipitator...

  • Answered by AI
  • Q8. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q9. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon

    • Optimizing the temperature and residence time in the furnace

    • Using additives like limestone or activated carbon

    • Improving the collection efficiency of the ash

    • Using advanced separation techniques like electrostatic precipitators or bag filters

  • Answered by AI
  • Q10. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q11. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon

    • Controlling the temperature of the combustion process

    • Using additives like limestone to reduce LOI

    • Optimizing the ash collection system

    • Regular maintenance of the equipment

    • Proper storage and handling of the ash

    • Recycling the ash for beneficial use

  • Answered by AI
  • Q12. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity.

    • Coal GCV is the Gross Calorific Value of coal, which is the amount of heat energy released when a unit of coal is burned.

    • These factors are interrelated and affect...

  • Answered by AI
  • Q13. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash and Fly Ash, ash sieve analysis can be done and the following pointers can be followed.

    • Perform ash sieve analysis to determine the particle size distribution

    • Increase the temperature of the furnace to reduce LOI

    • Add additives like limestone or dolomite to reduce LOI

    • Optimize combustion parameters to reduce LOI

    • Use advanced combustion technologies like fluidized bed combustion to reduce LOI

  • Answered by AI
  • Q14. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency refers to the percentage of heat generated by the boiler that is actually utilized for generating steam.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity.

    • Coal GCV (Gross Calorific Value) is the amount of heat energy released when a unit of coal is burned.

    • Hig...

  • Answered by AI
  • Q15. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburned carbon in the ash

    • Using additives like limestone or activated carbon to reduce LOI

    • Optimizing the temperature and residence time in the furnace

    • Improving the ash collection system to minimize the amount of unburned carbon in the ash

    • Using advanced ash beneficiation techni...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thermax is a good platform to enhanced the knowledge

Service Engineer Interview Questions asked at other Companies

Q1. What are the compulsory policy excess in four wheeler private vehicles?
View answer (12)
Contribute & help others!
anonymous
You can choose to be anonymous

Thermax Babcock Wilcox Energy Solutions Interview FAQs

How many rounds are there in Thermax Babcock Wilcox Energy Solutions interview?
Thermax Babcock Wilcox Energy Solutions interview process usually has 2-3 rounds. The most common rounds in the Thermax Babcock Wilcox Energy Solutions interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Thermax Babcock Wilcox Energy Solutions interview?

Some of the top questions asked at the Thermax Babcock Wilcox Energy Solutions interview -

  1. Explain about steam,water, flue gas,ash handling, Fuel handling system?? What...read more
  2. Which welding types Ans T,joints But,joints Iab,joints Cornar,joints Aej,joints...read more
  3. What is basic of Boiler and it's purpose in Industrial usa...read more
How long is the Thermax Babcock Wilcox Energy Solutions interview process?

The duration of Thermax Babcock Wilcox Energy Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

LIST OF COMPANIES

Discover companies

Find best workplace

LIST OF COMPANIES

Discover companies

Find best workplace

INTERVIEWS

Hyundai Construction Equipment

No Interviews

INTERVIEWS

Puzzolana Machinery Fabricators

No Interviews

INTERVIEWS

Caterpillar Inc

No Interviews

Tell us how to improve this page.

Thermax Babcock Wilcox Energy Solutions Interview Process

based on 18 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 416 Interviews
Tata Power Interview Questions
3.9
 • 161 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
GE Vernova Interview Questions
4.1
 • 82 Interviews
View all

Fast track your campus placements

View all

Thermax Babcock Wilcox Energy Solutions Reviews and Ratings

based on 278 reviews

4.2/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.4

Salary

4.3

Job security

4.2

Company culture

3.2

Promotions

3.8

Work satisfaction

Explore 278 Reviews and Ratings
Process Engineer
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
45 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Production Engineer
45 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
32 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
28 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Thermax Babcock Wilcox Energy Solutions with

BHEL

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Siemens

4.1
Compare

GE Vernova

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview