Filter interviews by
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before Nov 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
Thermax Babcock Wilcox Energy Solutions interview questions for popular designations
I applied via Referral and was interviewed before Feb 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
The Control Room Engineer is expected to have knowledge about steam, water, flue gas, ash handling, fuel handling system, boiler, turbine, DCS system of automation, FCV, feed contact stations, and three or single element system.
Steam is used to generate power in a power plant.
Water is used as a coolant in the condenser.
Flue gas is the exhaust gas from the combustion process.
Ash handling system is used to handle the ash...
Turbine specifications refer to the technical details of the turbine used in power generation.
Turbine specifications include the type of turbine, its capacity, efficiency, and operating conditions.
The type of turbine can be either steam or gas turbine.
Capacity refers to the amount of power the turbine can generate.
Efficiency is the ratio of the energy output to the energy input.
Operating conditions include the temperat...
Fuel handling system manages the storage, transfer, and distribution of fuel to the power plant.
Fuel is stored in large tanks and transported to the power plant through pipelines.
The fuel is then transferred to the boiler where it is burned to produce steam.
The steam is then used to turn the turbines which generate electricity.
The system also includes safety measures to prevent accidents and ensure proper functioning.
R...
A boiler is a closed vessel that generates steam by heating water. It is used in various industries for heating and power generation.
Boilers are used in industries such as power generation, chemical processing, and food and beverage production.
The basic purpose of a boiler is to convert water into steam, which can be used for heating, power generation, or other industrial processes.
Boilers work by heating water to its ...
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2021. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Thermax Babcock Wilcox Energy Solutions interview -
The duration of Thermax Babcock Wilcox Energy Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 18 interviews
Interview experience
based on 280 reviews
Rating in categories
Process Engineer
49
salaries
| ₹2 L/yr - ₹10 L/yr |
Production Engineer
46
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Assistant Manager
45
salaries
| ₹8.5 L/yr - ₹15 L/yr |
Deputy Manager
32
salaries
| ₹9.5 L/yr - ₹21.6 L/yr |
Senior Executive
28
salaries
| ₹6.5 L/yr - ₹11.3 L/yr |
BHEL
Larsen & Toubro Limited
Siemens
GE Vernova