Upload Button Icon Add office photos

Filter interviews by

Thermax Babcock Wilcox Energy Solutions Service Engineer Interview Questions and Answers

Updated 23 Dec 2022

Thermax Babcock Wilcox Energy Solutions Service Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Dec 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why you switch the previous job
Round 3 - Technical 

(15 Questions)

  • Q1. Technical question about boilers only
  • Q2. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q3. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Ash seave analysis can help identify the particle size distribution of the ash.

    • The LOI can be reduced by controlling the combustion process and ensuring complete combustion.

    • Adding additives like limestone or activated carbon can also help reduce LOI.

    • Proper maintenance of the boiler and ash handling system can also prev...

  • Answered by AI
  • Q4. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is a measure of how well the boiler is converting fuel into heat.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is a measure of the efficiency of a power plant.

    • Coal GCV (Gross Calorific Value) is a mea...

  • Answered by AI
  • Q5. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon in the ash

    • Using additives like limestone or activated carbon to reduce LOI

    • Optimizing the temperature and residence time in the furnace

    • Improving the ash collection system to prevent contamination

    • Using advanced separation techniques like electrostatic precipitator...

  • Answered by AI
  • Q6. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q7. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon in the ash

    • Using additives like limestone or activated carbon to reduce LOI

    • Optimizing the temperature and residence time in the furnace

    • Improving the ash collection system to prevent contamination

    • Using advanced separation techniques like electrostatic precipitator...

  • Answered by AI
  • Q8. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q9. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon

    • Optimizing the temperature and residence time in the furnace

    • Using additives like limestone or activated carbon

    • Improving the collection efficiency of the ash

    • Using advanced separation techniques like electrostatic precipitators or bag filters

  • Answered by AI
  • Q10. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input and is affected by factors such as combustion efficiency, heat transfer efficiency, and radiation losses.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity and is affected by factors such as boiler efficiency, ste...

  • Answered by AI
  • Q11. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburnt carbon

    • Controlling the temperature of the combustion process

    • Using additives like limestone to reduce LOI

    • Optimizing the ash collection system

    • Regular maintenance of the equipment

    • Proper storage and handling of the ash

    • Recycling the ash for beneficial use

  • Answered by AI
  • Q12. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency is the ratio of energy output to energy input.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity.

    • Coal GCV is the Gross Calorific Value of coal, which is the amount of heat energy released when a unit of coal is burned.

    • These factors are interrelated and affect...

  • Answered by AI
  • Q13. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash and Fly Ash, ash sieve analysis can be done and the following pointers can be followed.

    • Perform ash sieve analysis to determine the particle size distribution

    • Increase the temperature of the furnace to reduce LOI

    • Add additives like limestone or dolomite to reduce LOI

    • Optimize combustion parameters to reduce LOI

    • Use advanced combustion technologies like fluidized bed combustion to reduce LOI

  • Answered by AI
  • Q14. What Boiler efficiency, APC Heat rate Coal GCV
  • Ans. 

    Boiler efficiency, APC Heat rate and Coal GCV are important factors in determining the performance of a boiler.

    • Boiler efficiency refers to the percentage of heat generated by the boiler that is actually utilized for generating steam.

    • APC Heat rate is the amount of heat energy required to produce a unit of electricity.

    • Coal GCV (Gross Calorific Value) is the amount of heat energy released when a unit of coal is burned.

    • Hig...

  • Answered by AI
  • Q15. Ash seave analysis, how to reduce LOI of Bed Ash fly ash etc.
  • Ans. 

    To reduce LOI of Bed Ash fly ash, ash seave analysis can be done and the following steps can be taken.

    • Adjusting the combustion process to reduce unburned carbon in the ash

    • Using additives like limestone or activated carbon to reduce LOI

    • Optimizing the temperature and residence time in the furnace

    • Improving the ash collection system to minimize the amount of unburned carbon in the ash

    • Using advanced ash beneficiation techni...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thermax is a good platform to enhanced the knowledge

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Technical questions
  • Q2. Work remote location. Projected site

Interview Preparation Tips

Interview preparation tips for other job seekers - If you working outside from office location. Like site visit, customer vendor meeting,

I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.

Interview Preparation Tips

Round: Test
Experience: technical round
no. of questions 30

Round: Test
Experience: Questions related to NPD
no. of questions 10


Round: Test
Experience: VP Round
all questions reated to job 10


Round: Test
Experience: HR round ..

General Tips: Know the JD before interview
Skills: Communication, Body Language, Decision Making Skills
Duration: 1-4 weeks

I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Write the equation for dynamics and wave spectra equations. I do not remember questions as it is 3 years back.

Interview Preparation Tips

Interview preparation tips for other job seekers - This happened in Technip FMC Hyderabad, India. I hold 10 years experience. Interviewers don not know what to get from the candidates. The panel tried to prove within themselves that can ask difficult questions. The even entered to doctorate level questions which is not valid for performing job. Finally, I conclude that they performed some time-pass session.

I applied via Approached by Company and was interviewed in Feb 2018. There were 6 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Hydraulic and electrical
  • Q2. Hydraulic and electrical related

Interview Preparation Tips

Round: Resume Shortlist
Experience: *****

Round: Group Discussion
Experience: Hydraulic or electrical

General Tips: Yes
Skills: Electrical Machines, Electrical Machines
Duration: 1-4 weeks
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is transducer and any application?
  • Ans. 

    A transducer is a device that converts one form of energy into another. It has various applications in different fields.

    • Transducers are used in medical imaging equipment like ultrasound machines.

    • They are also used in sensors for measuring physical quantities like temperature, pressure, and strain.

    • In audio equipment, transducers are used to convert electrical signals into sound waves.

    • Transducers are used in industrial a...

  • Answered by AI
  • Q2. Tell me about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Plz always ready for interview
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is pressure vessel
  • Ans. 

    A pressure vessel is a container designed to hold gases or liquids at a pressure substantially different from the ambient pressure.

    • Pressure vessels are used in various industries such as oil and gas, chemical, pharmaceutical, and food processing.

    • They are designed to withstand high pressures and are typically cylindrical or spherical in shape.

    • Examples include boilers, storage tanks, and compressed air tanks.

  • Answered by AI
  • Q2. How to design shell
  • Ans. 

    Designing a shell involves considering factors like material, shape, size, and functionality.

    • Consider the material of the shell - metal, plastic, or composite

    • Determine the shape of the shell based on the intended use - cylindrical, spherical, conical, etc.

    • Decide on the size of the shell to accommodate the contents it will hold

    • Design the shell with the necessary functionality in mind - openings, closures, ventilation, e

  • Answered by AI

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About previous experience
  • Q2. Previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience no issues
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. About your experience and product knowledge
  • Q2. About yor communication skills and travelling experience and from this interviewer see your knowledge and confidence skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Construct a robust resume and portfolio, maintain organization and persistence, and continually enhance your skills while staying current with industry trends.

I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How types of welding?
  • Ans. 

    There are several types of welding including MIG, TIG, Stick, and Flux-Cored welding.

    • MIG welding uses a wire electrode and a shielding gas to join two pieces of metal together.

    • TIG welding uses a tungsten electrode and a filler metal to create a strong weld.

    • Stick welding uses a consumable electrode coated in flux to create a strong bond.

    • Flux-Cored welding uses a wire electrode with a flux core to create a protective shi

  • Answered by AI
  • Q2. Difference b/w 1st angle & 3rd angle projection?
  • Ans. 

    1st angle projection is used in Europe & 3rd angle projection is used in North America. They differ in placement of views.

    • 1st angle projection places the object in front of the viewing plane while 3rd angle projection places the object behind the viewing plane.

    • In 1st angle projection, the top view is placed below the front view while in 3rd angle projection, the top view is placed above the front view.

    • 1st angle project...

  • Answered by AI
  • Q3. Why u are leaving your past company
  • Q4. What is meant by six sigma
  • Ans. 

    Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.

    • Six Sigma aims to achieve a level of quality where the probability of defects is extremely low.

    • It involves a structured approach to problem-solving using statistical analysis.

    • The methodology uses a set of tools and techniques such as DMAIC (Define, Measure, Analyze, Improve, Control) and statistical process con...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall it is good, always concentrate on core welding concepts

Thermax Babcock Wilcox Energy Solutions Interview FAQs

How many rounds are there in Thermax Babcock Wilcox Energy Solutions Service Engineer interview?
Thermax Babcock Wilcox Energy Solutions interview process usually has 3 rounds. The most common rounds in the Thermax Babcock Wilcox Energy Solutions interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Thermax Babcock Wilcox Energy Solutions Service Engineer interview?

Some of the top questions asked at the Thermax Babcock Wilcox Energy Solutions Service Engineer interview -

  1. Ash seave analysis, how to reduce LOI of Bed Ash fly ash e...read more
  2. What Boiler efficiency, APC Heat rate Coal ...read more

Tell us how to improve this page.

Thermax Babcock Wilcox Energy Solutions Service Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Fast track your campus placements

View all
Thermax Babcock Wilcox Energy Solutions Service Engineer Salary
based on 6 salaries
₹2.3 L/yr - ₹9.6 L/yr
16% more than the average Service Engineer Salary in India
View more details

Thermax Babcock Wilcox Energy Solutions Service Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

3.0

Work-life balance

3.0

Salary

5.0

Job security

4.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Process Engineer
49 salaries
unlock blur

₹2 L/yr - ₹10 L/yr

Assistant Manager
46 salaries
unlock blur

₹8.5 L/yr - ₹15 L/yr

Production Engineer
45 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Design Engineer
32 salaries
unlock blur

₹2.4 L/yr - ₹10.6 L/yr

Deputy Manager
32 salaries
unlock blur

₹9.5 L/yr - ₹21.6 L/yr

Explore more salaries
Compare Thermax Babcock Wilcox Energy Solutions with

Sigma Electric Manufacturing Corporation

4.0
Compare

TÜV SÜD

3.9
Compare

TKIL

4.2
Compare

Ceasefire Industries

3.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview