Upload Button Icon Add office photos

Filter interviews by

The Indian Hume Pipe Co. Shift Incharge Interview Questions and Answers

Updated 9 Sep 2023

The Indian Hume Pipe Co. Shift Incharge Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Site Engineer electrical
  • Q2. Electrical , pump, chlorine work
  • Q3. Electrical, pump, chlorine
  • Q4. 33kv pannel vcb
  • Q5. Pump house cleaning work

Interview Preparation Tips

Interview preparation tips for other job seekers - Company service

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Emergency handling in power plant
  • Ans. 

    Emergency handling in power plant involves quick response, proper training, and adherence to safety protocols.

    • Quickly assess the situation and identify the type of emergency (fire, equipment failure, etc.)

    • Activate emergency shutdown procedures to prevent further damage

    • Notify appropriate personnel and emergency services

    • Evacuate personnel to safe locations and ensure their safety

    • Follow established safety protocols and pr...

  • Answered by AI
Round 2 - Aptitude Test 

General awareness Current affairs

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Conyers maintenance $STP plant
  • Q2. Idler replacement work
  • Q3. Feed pump maintenance
  • Q4. Manpower handling
  • Q5. Daily shiftr report
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Do you like to work with Star Cement Company?
  • Q2. What work do you get done in shift
  • Q3. What is the safety in your company?

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Draw the DC drive basic daigram & explain it and how to program a vfd.
  • Ans. 

    DC drive basic diagram consists of power supply, rectifier, chopper, and motor. VFD programming involves setting parameters for speed, torque, and acceleration.

    • DC drive diagram includes power supply, rectifier, chopper, and motor

    • VFD programming involves setting parameters for speed, torque, and acceleration

    • DC drive controls motor speed and direction

    • VFD can be programmed using software or keypad

    • VFD parameters can be adj

  • Answered by AI
  • Q2. Have you ever worked on plc, tell me I/p & o/p of PLC's and control daigram of star delta starter
  • Q3. Explain asset metrics, iso, kaizen,5s
  • Ans. 

    Asset metrics, ISO, Kaizen, and 5S are all important tools for improving efficiency and productivity in the workplace.

    • Asset metrics are measurements used to evaluate the performance of assets, such as equipment or machinery.

    • ISO (International Organization for Standardization) is a set of standards that provide guidelines for quality management systems.

    • Kaizen is a Japanese term that means continuous improvement. It invo...

  • Answered by AI
  • Q4. Explain acbs &vcbs for sub station and which type of relay you uses.
  • Ans. 

    ACBs and VCBs are circuit breakers used in substations. The type of relay used depends on the specific application.

    • ACBs (Air Circuit Breakers) and VCBs (Vacuum Circuit Breakers) are used in substations to protect electrical equipment from damage due to overloads or short circuits.

    • ACBs use air as the medium to extinguish the arc, while VCBs use vacuum.

    • The type of relay used depends on the specific application, such as o...

  • Answered by AI
  • Q5. Explain DC motor speed control parameters
  • Ans. 

    DC motor speed control parameters include armature voltage, field current, and mechanical load.

    • Armature voltage: controls the speed of the motor by varying the voltage applied to the armature.

    • Field current: controls the strength of the magnetic field and thus the speed of the motor.

    • Mechanical load: affects the speed of the motor by changing the amount of torque required to turn the motor.

    • Other factors include the type ...

  • Answered by AI
  • Q6. Explai. Plc trouble shootings

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear your all doubts before you go for interview and firm with your answer
Checked in which company you are going for interview. What's its products. Clear your all basics mostly questions asked from basic automation or electrical.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. Why vaccum is necessary 2.Boiler heating surface are? 3.Use of 3 element feed control station
  • Ans. 

    Answering questions related to vacuum, boiler heating surface, and 3 element feed control station.

    • Vacuum is necessary to remove air and other gases from a system to create a low-pressure environment.

    • Boiler heating surfaces are the areas of the boiler where heat is transferred from the combustion gases to the water or steam.

    • 3 element feed control station is used to maintain the water level, steam flow, and feed water fl...

  • Answered by AI
  • Q2. What is T11 material
  • Ans. 

    T11 is a type of steel material commonly used in the manufacturing of pipes and tubes.

    • T11 material is a low alloy steel with a composition of 1.25% chromium and 0.5% molybdenum.

    • It is commonly used in the construction of boilers, heat exchangers, and piping systems.

    • T11 material has good strength and corrosion resistance properties.

    • It is also known as ASTM A213 Grade T11 or ASME SA213 Grade T11.

    • T11 material is often used...

  • Answered by AI

I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the roles and responsibility of your job and how to handle labour when crate problem when you deal 500 plus work men.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always remember your confidence is important so don't be losses.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Do you like to work with Star Cement Company?
  • Q2. What work do you get done in shift
  • Q3. What is the safety in your company?

Shift Engineer Interview Questions & Answers

ACC user image Shyam Sundar Chakraborty

posted on 26 Jun 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Approached by Company

Round 1 - Technical 

(6 Questions)

  • Q1. What is cement and how it prepared
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, etc. It is prepared by mixing limestone, clay, and other materials.

    • Cement is made by heating a mixture of limestone and clay in a kiln at high temperatures

    • The resulting product, called clinker, is then ground into a fine powder and mixed with gypsum to create cement

    • Water is added to the cement to form a paste, which hardens over time to ...

  • Answered by AI
  • Q2. Types of cement
  • Ans. 

    Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.

    • Portland cement is the most common type used in construction.

    • White cement is used for architectural purposes and to create colored concrete.

    • Rapid hardening cement sets quickly and is used in projects with tight deadlines.

    • Low heat cement generates less heat during hydration and is used in large concrete structures.

  • Answered by AI
  • Q3. Cement temperature?
  • Ans. 

    Cement temperature is an important factor in the production process, affecting setting time and strength of the final product.

    • Cement temperature should be monitored closely during production to ensure optimal conditions.

    • Higher temperatures can accelerate the setting time of cement, while lower temperatures can slow it down.

    • The ideal temperature range for cement production is typically between 90-120 degrees Celsius.

    • Tem...

  • Answered by AI
  • Q4. Material handling procedure
  • Ans. 

    Material handling procedure involves the safe and efficient movement of materials within a facility.

    • Establish clear guidelines for handling different types of materials

    • Train employees on proper lifting techniques and equipment usage

    • Implement safety measures such as wearing protective gear and using designated pathways

    • Regularly inspect equipment and storage areas for potential hazards

    • Utilize technology like conveyor bel

  • Answered by AI
  • Q5. Storage of material
  • Ans. 

    Proper storage of materials is crucial for maintaining quality and safety standards in engineering operations.

    • Materials should be stored in designated areas to prevent mix-ups and ensure easy access.

    • Storage areas should be organized and labeled clearly for quick identification.

    • Certain materials may require specific storage conditions such as temperature control or protection from moisture.

    • Regular inventory checks shoul...

  • Answered by AI
  • Q6. Safe unloading tips
  • Ans. 

    Safe unloading tips are crucial for preventing accidents and injuries.

    • Always wear appropriate personal protective equipment (PPE) such as gloves, safety glasses, and steel-toed boots.

    • Inspect the unloading area for any hazards such as uneven ground, overhead obstacles, or slippery surfaces.

    • Use proper lifting techniques to avoid strain or injury - bend at the knees, keep your back straight, and lift with your legs.

    • Secure...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Conyers maintenance $STP plant
  • Q2. Idler replacement work
  • Q3. Feed pump maintenance
  • Q4. Manpower handling
  • Q5. Daily shiftr report

The Indian Hume Pipe Co. Interview FAQs

How many rounds are there in The Indian Hume Pipe Co. Shift Incharge interview?
The Indian Hume Pipe Co. interview process usually has 2 rounds. The most common rounds in the The Indian Hume Pipe Co. interview process are Resume Shortlist and Technical.
What are the top questions asked in The Indian Hume Pipe Co. Shift Incharge interview?

Some of the top questions asked at the The Indian Hume Pipe Co. Shift Incharge interview -

  1. Electrical , pump, chlorine w...read more
  2. Electrical, pump, chlor...read more
  3. Pump house cleaning w...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 The Indian Hume Pipe Co. interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 425 Interviews
JK Cement Interview Questions
4.1
 • 240 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
ACC Interview Questions
3.9
 • 184 Interviews
Shree Cement Interview Questions
3.8
 • 148 Interviews
Voltas Interview Questions
4.0
 • 123 Interviews
Ambuja Cements Interview Questions
3.9
 • 102 Interviews
View all
Engineer
87 salaries
unlock blur

₹2.4 L/yr - ₹5.2 L/yr

Senior Engineer
73 salaries
unlock blur

₹3.5 L/yr - ₹8 L/yr

Site Engineer
67 salaries
unlock blur

₹2.2 L/yr - ₹5.4 L/yr

Civil Engineer
64 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Civil Site Engineer
61 salaries
unlock blur

₹3 L/yr - ₹5.1 L/yr

Explore more salaries
Compare The Indian Hume Pipe Co. with

Jain Irrigation Systems

4.0
Compare

Supreme Industries

4.1
Compare

Finolex Industries

3.8
Compare

KSB Limited - Irrigation & Process Division (IPD)

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview