Upload Button Icon Add office photos

Tecnimont

Compare button icon Compare button icon Compare

Filter interviews by

Tecnimont Interview Questions and Answers

Updated 29 Apr 2025
Popular Designations

20 Interview questions

A Planning Engineer was asked 1mo ago
Q. How do you manage the critical path in a plant project?
Ans. 

Managing the critical path involves identifying key tasks, monitoring progress, and adjusting schedules to ensure timely project completion.

  • Identify critical tasks using a Gantt chart or network diagram to visualize dependencies.

  • Regularly update the project schedule to reflect progress and any delays.

  • Communicate with team members to address potential bottlenecks early.

  • Use project management software to track miles...

View all Planning Engineer interview questions
A Senior Planning Engineer was asked 8mo ago
Q. What activities are involved in building construction?
Ans. 

Activities in building include site preparation, foundation construction, framing, roofing, plumbing, electrical work, and finishing touches.

  • Site preparation involves clearing the land and leveling the ground.

  • Foundation construction includes digging trenches, pouring concrete, and laying the foundation walls.

  • Framing involves constructing the basic structure of the building using wood or steel beams.

  • Roofing include...

View all Senior Planning Engineer interview questions
A Senior Planning Engineer was asked 8mo ago
Q. How do you track structural work from the engineering to the construction phase?
Ans. 

Use project management software to track progress, milestones, and communication between engineering and construction teams.

  • Utilize project management software to create a detailed schedule for structure work

  • Regularly update the schedule with progress made by the engineering team

  • Establish clear communication channels between engineering and construction teams to ensure smooth transition of work

  • Hold regular meeting...

View all Senior Planning Engineer interview questions
An Electrical GET was asked 8mo ago
Q. What is a transformer?
Ans. 

A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

  • Consists of two or more coils of wire wrapped around a core

  • Primary coil receives electrical energy and induces a magnetic field

  • Secondary coil receives the magnetic field and converts it back to electrical energy

  • Used to step up or step down voltage in power distribution systems

View all Electrical GET interview questions
A Process Engineer Trainee was asked 9mo ago
Q. How do you calculate pump efficiency?
Ans. 

Pump efficiency can be calculated by dividing the pump's output power by its input power.

  • Calculate the pump's output power by multiplying the flow rate, head, and specific gravity of the fluid being pumped.

  • Calculate the pump's input power by measuring the electrical power input to the pump motor.

  • Divide the pump's output power by its input power to get the efficiency percentage.

  • Efficiency (%) = (Output Power / Inpu...

View all Process Engineer Trainee interview questions
A Project Engineer was asked 11mo ago
Q. What kind of reviews are conducted?
Ans. 

Various reviews ensure project quality, compliance, and stakeholder alignment throughout the engineering process.

  • Design Reviews: Evaluate design specifications and ensure they meet project requirements. Example: Reviewing CAD models before production.

  • Code Reviews: Assess software code for quality and adherence to standards. Example: Peer review of code changes in a software project.

  • Safety Reviews: Identify potenti...

View all Project Engineer interview questions
An Instrument Engineer was asked
Q. Have you prepared datasheets?
Ans. 

Yes, I have prepared datasheets for various instruments in my previous roles.

  • I have prepared datasheets for instruments such as pressure transmitters, flow meters, and control valves.

  • I am familiar with including specifications, performance data, and installation requirements in datasheets.

  • I have worked closely with vendors and manufacturers to gather necessary information for datasheet creation.

View all Instrument Engineer interview questions
Are these interview questions helpful?
A Foreman was asked
Q. How do you control a switch?
Ans. 

To control a switch, you need to understand its functionality and use appropriate methods.

  • Identify the type of switch (e.g., toggle, push-button, rotary)

  • Learn the switch's states (e.g., on/off, open/closed)

  • Use the appropriate technique to manipulate the switch (e.g., pressing, toggling, rotating)

  • Follow safety guidelines and precautions when dealing with electrical switches

View all Foreman interview questions
A Project Procurement Coordinator was asked
Q. What is your experience in managing vendors?
Ans. 

Yes, I have experience in managing vendors.

  • I have managed vendor relationships for multiple projects, ensuring timely delivery of goods and services.

  • I have negotiated contracts and pricing with vendors to ensure cost-effectiveness.

  • I have monitored vendor performance and addressed any issues or concerns.

  • I have also worked with vendors to develop and implement quality control measures.

  • For example, in my previous rol...

View all Project Procurement Coordinator interview questions
A Process Engineer was asked
Q. How do you perform pump hydraulics calculations?
Ans. 

Pump hydraulics involves understanding the flow rate, pressure, and head of the fluid being pumped.

  • Determine the required flow rate and pressure for the system

  • Select a pump that can meet the flow rate and pressure requirements

  • Calculate the head of the fluid to ensure the pump can overcome the resistance of the system

  • Consider the viscosity and temperature of the fluid being pumped

  • Ensure proper installation and main...

View all Process Engineer interview questions

Tecnimont Interview Experiences

33 interviews found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to design heat exchanger
  • Ans. 

    Designing a heat exchanger involves determining the heat transfer rate, selecting the appropriate type and size, and optimizing the design for efficiency.

    • Determine the heat transfer rate based on the process requirements

    • Select the appropriate type of heat exchanger (e.g. shell and tube, plate and frame)

    • Choose the size of the heat exchanger based on the required heat transfer area

    • Optimize the design for efficiency by co...

  • Answered by AI
  • Q2. How to do pump hydraulics
  • Ans. 

    Pump hydraulics involves understanding the flow rate, pressure, and head of the fluid being pumped.

    • Determine the required flow rate and pressure for the system

    • Select a pump that can meet the flow rate and pressure requirements

    • Calculate the head of the fluid to ensure the pump can overcome the resistance of the system

    • Consider the viscosity and temperature of the fluid being pumped

    • Ensure proper installation and maintenan...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work with.
Work culture is well balance.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

The aptitude was pretty easy, questions were majorily on Thermodynamics, SOM and Material Science

Round 2 - Group Discussion 

The Group discussion was conducted in a group of 10, my group discussion lasted for 15 min
Make sure to prepare on latest GD topics

Round 3 - Technical 

(3 Questions)

  • Q1. Introduce Yourself
  • Ans. 

    I am a recent graduate with a degree in Business Administration, passionate about marketing and eager to learn and grow in a dynamic work environment.

    • Graduated with a Bachelor's degree in Business Administration

    • Passionate about marketing and eager to learn

    • Seeking opportunities to grow in a dynamic work environment

  • Answered by AI
  • Q2. About my internship and Projects
  • Q3. Basic technical questions on SOM (Questions may vary depending on the role they're hiring for) for me it was procurement

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident overall the process not stressful
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was the mixture of core (technical), then the aptitude and some questions of project control

Round 2 - Group Discussion 

It was good experience, their gd process is amazing.

Round 3 - Technical 

(2 Questions)

  • Q1. Introduce yourself
  • Ans. 

    Experienced project control professional with a strong background in managing timelines, budgets, and resources for successful project delivery.

    • Over 5 years of experience in project control across various industries, including construction and IT.

    • Skilled in using project management software like Primavera P6 and Microsoft Project to track progress and manage resources.

    • Successfully managed a $10 million construction pro...

  • Answered by AI
  • Q2. Tell us about your projects
Round 4 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Give your 100%
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. What is the role of schedule management in plant projects ?
  • Ans. 

    Schedule management ensures timely completion of plant projects, optimizing resources and minimizing delays.

    • Defines project timelines: Establishes start and end dates for each phase, ensuring all stakeholders are aligned.

    • Resource allocation: Helps in assigning the right resources at the right time, preventing bottlenecks.

    • Risk management: Identifies potential delays early, allowing for contingency planning.

    • Progress trac...

  • Answered by AI
  • Q2. How do you manage the critical path in plant project ?
  • Ans. 

    Managing the critical path involves identifying key tasks, monitoring progress, and adjusting schedules to ensure timely project completion.

    • Identify critical tasks using a Gantt chart or network diagram to visualize dependencies.

    • Regularly update the project schedule to reflect progress and any delays.

    • Communicate with team members to address potential bottlenecks early.

    • Use project management software to track milestones...

  • Answered by AI
  • Q3. What are the critical activities involved in a process plant project?
  • Q4. What methods do you use to manage project budgeting?
  • Q5. What percentage of contingency should be used for budgets?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Npsh value negative
  • Q2. How to calculate pump efficiency
  • Ans. 

    Pump efficiency can be calculated by dividing the pump's output power by its input power.

    • Calculate the pump's output power by multiplying the flow rate, head, and specific gravity of the fluid being pumped.

    • Calculate the pump's input power by measuring the electrical power input to the pump motor.

    • Divide the pump's output power by its input power to get the efficiency percentage.

    • Efficiency (%) = (Output Power / Input Pow...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Job roles and responsibilities?
  • Ans. 

    Project Engineers oversee project planning, execution, and completion, ensuring technical and operational success.

    • Coordinate project activities and resources, e.g., scheduling meetings with stakeholders.

    • Develop project plans and timelines, ensuring milestones are met.

    • Manage budgets and costs, e.g., tracking expenses against the project budget.

    • Ensure compliance with safety and quality standards, e.g., conducting regular...

  • Answered by AI
  • Q2. What kind of reviews are conducted?
  • Ans. 

    Various reviews ensure project quality, compliance, and stakeholder alignment throughout the engineering process.

    • Design Reviews: Evaluate design specifications and ensure they meet project requirements. Example: Reviewing CAD models before production.

    • Code Reviews: Assess software code for quality and adherence to standards. Example: Peer review of code changes in a software project.

    • Safety Reviews: Identify potential ha...

  • Answered by AI

Engineer Interview Questions & Answers

user image Anonymous

posted on 13 May 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Basics of structural engineering
  • Q2. Basics of design considerations
Round 2 - Technical 

(2 Questions)

  • Q1. Technical parameters
  • Q2. Technical discussion on structural design
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - Aptitude Test 

Only Technical of your domain

Round 2 - Group Discussion 

General topics from current affairs

Round 3 - Technical 

(1 Question)

  • Q1. What is transformer
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Consists of two or more coils of wire wrapped around a core

    • Primary coil receives electrical energy and induces a magnetic field

    • Secondary coil receives the magnetic field and converts it back to electrical energy

    • Used to step up or step down voltage in power distribution systems

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - They assess from all three rounds
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to track structure work from engg to construction phase
  • Ans. 

    Use project management software to track progress, milestones, and communication between engineering and construction teams.

    • Utilize project management software to create a detailed schedule for structure work

    • Regularly update the schedule with progress made by the engineering team

    • Establish clear communication channels between engineering and construction teams to ensure smooth transition of work

    • Hold regular meetings to ...

  • Answered by AI
  • Q2. What are the activities in building
  • Ans. 

    Activities in building include site preparation, foundation construction, framing, roofing, plumbing, electrical work, and finishing touches.

    • Site preparation involves clearing the land and leveling the ground.

    • Foundation construction includes digging trenches, pouring concrete, and laying the foundation walls.

    • Framing involves constructing the basic structure of the building using wood or steel beams.

    • Roofing includes ins...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, sound in what you have you done in your past projects

Piping Designer Interview Questions & Answers

user image pratheesh .R

posted on 12 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Basic piping knowledge

Round 2 - Technical 

(2 Questions)

  • Q1. Sp3d piping and equipment
  • Q2. GA Isometric extract
Round 3 - HR 

(2 Questions)

  • Q1. Previous company details
  • Q2. Salary expectation

Foreman Interview Questions & Answers

user image Nardev Gurung

posted on 28 Dec 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

Proces interview one to one interview aptitude interview practical interview

Round 2 - One-on-one 

(4 Questions)

  • Q1. Coding assignment case study technical
  • Q2. Do you want work ?
  • Q3. What is the life
  • Ans. 

    Life is the existence of living organisms, characterized by growth, reproduction, and response to stimuli.

    • Life refers to the state of being alive and encompasses various biological processes.

    • Living organisms grow, reproduce, and have the ability to respond to their environment.

    • Life can be found in plants, animals, and microorganisms.

    • Examples of life include humans, animals, plants, bacteria, and fungi.

  • Answered by AI
  • Q4. You want to work with technimon
Round 3 - Technical 

(1 Question)

  • Q1. What is tools ?are tou technician what is the power
  • Ans. 

    Tools are instruments or devices used to perform specific tasks or achieve certain objectives.

    • Tools are designed to make work easier and more efficient.

    • They can be manual or powered, depending on the task at hand.

    • Examples of tools include hammers, screwdrivers, drills, saws, etc.

    • Technicians often use tools to diagnose and repair equipment or systems.

    • Power tools are tools that are operated by an external power source, s...

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. How to control switch
  • Ans. 

    To control a switch, you need to understand its functionality and use appropriate methods.

    • Identify the type of switch (e.g., toggle, push-button, rotary)

    • Learn the switch's states (e.g., on/off, open/closed)

    • Use the appropriate technique to manipulate the switch (e.g., pressing, toggling, rotating)

    • Follow safety guidelines and precautions when dealing with electrical switches

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Tecnimont?
Ask anonymously on communities.

Tecnimont Interview FAQs

How many rounds are there in Tecnimont interview?
Tecnimont interview process usually has 2-3 rounds. The most common rounds in the Tecnimont interview process are Technical, Resume Shortlist and HR.
How to prepare for Tecnimont interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tecnimont. The most common topics and skills that interviewers at Tecnimont expect are AutoCAD, Communication Skills, Petrochemical, Project Management and EPC.
What are the top questions asked in Tecnimont interview?

Some of the top questions asked at the Tecnimont interview -

  1. what is tools ?are tou technician what is the po...read more
  2. What is the role of schedule management in plant project...read more
  3. How do you manage the critical path in plant projec...read more
How long is the Tecnimont interview process?

The duration of Tecnimont interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.4/5

based on 42 interview experiences

Difficulty level

Easy 11%
Moderate 78%
Hard 11%

Duration

Less than 2 weeks 88%
4-6 weeks 6%
More than 8 weeks 6%
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 128 Interviews
Apco Infratech Interview Questions
3.7
 • 123 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 65 Interviews
Wood Group Interview Questions
3.8
 • 63 Interviews
Psp Projects Interview Questions
3.9
 • 59 Interviews
View all

Tecnimont Reviews and Ratings

based on 535 reviews

3.8/5

Rating in categories

3.6

Skill development

3.4

Work-life balance

3.8

Salary

3.8

Job security

3.5

Company culture

3.4

Promotions

3.5

Work satisfaction

Explore 535 Reviews and Ratings
Principal/ Senior Engineer - Civil

Mumbai,

Navi Mumbai

10-15 Yrs

Not Disclosed

CIVIL UNDERGROUND DESIGNER

Mumbai,

Navi Mumbai

10-15 Yrs

Not Disclosed

Manager - Retiral Benefits

Mumbai

15-21 Yrs

Not Disclosed

Explore more jobs
Deputy Chief Engineer
200 salaries
unlock blur

₹20.8 L/yr - ₹36 L/yr

Principal Engineer
137 salaries
unlock blur

₹14 L/yr - ₹25.2 L/yr

Senior Engineer
107 salaries
unlock blur

₹7 L/yr - ₹18 L/yr

Additional Chief Engineer
68 salaries
unlock blur

₹21.5 L/yr - ₹43 L/yr

Assistant Manager
53 salaries
unlock blur

₹10 L/yr - ₹27 L/yr

Explore more salaries
Compare Tecnimont with

L&T Energy Hydrocarbon

3.9
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview