Filter interviews by
I was interviewed before Mar 2023.
Yes, I have prepared datasheets for various instruments in my previous roles.
I have prepared datasheets for instruments such as pressure transmitters, flow meters, and control valves.
I am familiar with including specifications, performance data, and installation requirements in datasheets.
I have worked closely with vendors and manufacturers to gather necessary information for datasheet creation.
Top trending discussions
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
To install an ultrasonic flowmeter in big size lines, especially in flare service, proper planning and coordination with other disciplines is essential.
Ensure the flowmeter is suitable for the size of the line and the conditions of the flare service.
Coordinate with piping and instrumentation departments to determine the best location for installation.
Consider factors such as accessibility for maintenance and calibratio...
posted on 21 Nov 2019
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 3 interview rounds.
I applied via Referral and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
Instrument index is a document that lists all instruments used in a project along with their details.
Instrument index is a comprehensive list of all instruments used in a project.
It includes details such as instrument tag number, type, location, and function.
Instrument index helps in tracking and managing instruments throughout the project.
It is essential for maintenance, troubleshooting, and calibration of instruments...
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
To install an ultrasonic flowmeter in big size lines, especially in flare service, proper planning and coordination with other disciplines is essential.
Ensure the flowmeter is suitable for the size of the line and the conditions of the flare service.
Coordinate with piping and instrumentation departments to determine the best location for installation.
Consider factors such as accessibility for maintenance and calibratio...
posted on 21 Nov 2019
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 3 interview rounds.
posted on 26 Jul 2023
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Deputy Chief Engineer
181
salaries
| ₹13.6 L/yr - ₹36 L/yr |
Principal Engineer
127
salaries
| ₹7.8 L/yr - ₹28 L/yr |
Senior Engineer
97
salaries
| ₹7 L/yr - ₹18 L/yr |
Additional Chief Engineer
57
salaries
| ₹21.5 L/yr - ₹43 L/yr |
Assistant Manager
53
salaries
| ₹10 L/yr - ₹25 L/yr |
L&T Energy Hydrocarbon
TechnipFMC
Toyo Engineering
Punj Lloyd