Filter interviews by
Lap length is the amount of overlap between two reinforcing bars in a concrete structure.
Lap length is important for ensuring the strength and stability of a concrete structure.
It is typically specified in building codes and engineering standards.
The lap length required depends on the diameter of the reinforcing bars and the strength of the concrete.
For example, in a reinforced concrete beam, the lap length might be 40...
Development length is the minimum length of reinforcement required to transfer the stress from steel to concrete.
It is the length of the bar required to be embedded in the concrete to transfer the load.
It depends on the diameter of the bar, the grade of steel, and the strength of concrete.
It is calculated using the formula provided in the codebook.
It is important to ensure proper development length to prevent failure o
BBS stands for Bar Bending Schedule. It is a document that provides details of reinforcement steel required for construction.
BBS is used in construction to ensure the correct amount of reinforcement steel is used.
It includes details such as the diameter, length, and number of steel bars required.
BBS is created based on the structural drawings and specifications.
It helps in estimating the cost of reinforcement steel and...
Lap length is the amount of overlap between two reinforcing bars in a concrete structure.
It is important for ensuring the strength and stability of the structure.
The lap length is determined by the diameter of the bars and the strength of the concrete.
For example, in a beam, the lap length is typically 50 times the diameter of the bar.
Lap length requirements may vary depending on the specific building codes and regulat
Development length is the minimum length of reinforcement required to transfer the stress from reinforcing bar to concrete.
It is the length of the bar that must be embedded in concrete to develop its full strength.
It is influenced by the diameter of the bar, the strength of the concrete, and the bond strength between the bar and the concrete.
It is calculated using the formula Ld = (phi x Fy x As) / (4 x tau x sqrt(f'c)...
BBS stands for Bar Bending Schedule. It is a document that provides details of reinforcement steel required for construction.
BBS is used in construction to ensure the correct amount of reinforcement steel is used.
It includes details such as the diameter and length of each steel bar.
BBS helps to minimize wastage of steel and ensures the structural integrity of the building.
It is an important document for contractors, en...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
Total 3 rounds of interview were conducted
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
based on 2 reviews
Rating in categories
Deputy Chief Engineer
198
salaries
| ₹13.6 L/yr - ₹36 L/yr |
Principal Engineer
128
salaries
| ₹8.5 L/yr - ₹25.2 L/yr |
Senior Engineer
87
salaries
| ₹7 L/yr - ₹17.5 L/yr |
Additional Chief Engineer
56
salaries
| ₹21.5 L/yr - ₹46 L/yr |
Assistant Manager
52
salaries
| ₹10 L/yr - ₹27 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem