I applied via Referral and was interviewed before May 2023. There was 1 interview round.
To install an ultrasonic flowmeter in big size lines, especially in flare service, proper planning and coordination with other disciplines is essential.
Ensure the flowmeter is suitable for the size of the line and the conditions of the flare service.
Coordinate with piping and instrumentation departments to determine the best location for installation.
Consider factors such as accessibility for maintenance and calibratio...
posted on 11 Sep 2024
I am a dedicated instrumentation engineer with a strong background in designing and implementing control systems.
Graduated with a degree in Instrumentation Engineering
Experienced in designing control systems for industrial processes
Skilled in programming PLCs and SCADA systems
Worked on projects involving process optimization and automation
Strong problem-solving and analytical skills
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
119
salaries
| ₹14 L/yr - ₹49 L/yr |
Process Engineer
94
salaries
| ₹6 L/yr - ₹19.1 L/yr |
Engineer
64
salaries
| ₹6 L/yr - ₹24 L/yr |
Purchasing Specialist
63
salaries
| ₹6.5 L/yr - ₹20 L/yr |
Senior Process Engineer
53
salaries
| ₹21 L/yr - ₹40.2 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM