i
TCS
Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
Gave us a topic for debate
I applied via Naukri.com and was interviewed in May 2022. There were 5 interview rounds.
Question based on designation/role
Conducting group discuss for job hiring
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Heap sort is a comparison-based sorting algorithm that uses a binary heap data structure.
Heap sort works by first building a heap from the input array.
Then it repeatedly extracts the maximum element from the heap, and places it at the end of the sorted array.
The heap is then updated to exclude the extracted element, and the process is repeated until the heap is empty.
Heap sort has a worst-case and average time complexi...
I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.
COMP and COMP-3 are data types used in COBOL programming language.
COMP is a binary data type that stores numeric values as binary integers.
COMP-3 is a packed decimal data type that stores numeric values as packed decimal digits.
COMP uses less storage space compared to COMP-3.
COMP-3 is more suitable for decimal arithmetic operations.
COMP-3 values are stored in a packed format, where each digit occupies half a byte.
COMP-...
To check if a file is empty or not, we can use the file's size or read the file and check for any content.
Get the size of the file using file system APIs and check if it is zero.
Read the file and check if it contains any content.
Handle exceptions or errors that may occur during file operations.
Data can pass from JCL to COBOL program in multiple ways, such as through input files, system symbols, and program parameters.
Input files: Data can be passed to a COBOL program through input files specified in the JCL.
System symbols: JCL can define system symbols that can be accessed by the COBOL program to retrieve data.
Program parameters: JCL can pass parameters to the COBOL program, which can be used to receive data...
To insert or update data in a table, use SQL statements like INSERT INTO or UPDATE.
For inserting data, use the INSERT INTO statement followed by the table name and column names.
Specify the values to be inserted using the VALUES keyword.
For updating data, use the UPDATE statement followed by the table name.
Set the column values to be updated using the SET keyword.
Use conditions with the WHERE clause to specify which row
An array is a data structure that stores a collection of elements of the same type.
Arrays can be used to store and access multiple values using a single variable.
To load data into an array of strings, you can assign values to each element individually or use a loop.
Example: String[] names = {"John", "Jane", "Mike"};
Example: for(int i = 0; i < names.length; i++) { names[i] = "Value" + i; }
To eliminate duplicates from 2 files and send them to another output file, we can use a combination of file reading, hashing, and file writing.
Read the contents of both files and store them in separate arrays or lists.
Create a hash table or dictionary to keep track of the unique elements in the arrays.
Iterate through the arrays and add each element to the hash table. If the element already exists, skip it.
Write the con...
S0C7 abend is a mainframe error caused by invalid data. It can be resolved by identifying the source of the error and correcting it.
S0C7 abend is caused by invalid data in a numeric field
To resolve it, identify the source of the error and correct it
Common causes include incorrect data types, invalid characters, and overflow
Debugging tools like IBM Debug Tool can help identify the source of the error
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 4 interview rounds.
Agile ceremonies are regular meetings that take place during an agile project to facilitate communication and collaboration among team members.
Sprint planning: a meeting where the team plans the work to be done in the upcoming sprint
Daily stand-up: a brief meeting where team members share progress and discuss any obstacles
Sprint review: a meeting where the team demonstrates the work completed during the sprint
Sprint re...
I will use agile methodology to accommodate changes in requirements or enhancement.
I will prioritize the changes based on their impact on the project and discuss them with the stakeholders.
I will update the project plan and communicate the changes to the team.
I will use agile methodology to accommodate changes in requirements or enhancement.
I will ensure that the changes are properly documented and tested before implem...
I applied via Naukri.com
I applied via Campus Placement and was interviewed in Apr 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
System Engineer
1.1L
salaries
| ₹1 L/yr - ₹9 L/yr |
IT Analyst
66.2k
salaries
| ₹5 L/yr - ₹15.9 L/yr |
AST Consultant
51.8k
salaries
| ₹8 L/yr - ₹25 L/yr |
Associate Consultant
30.1k
salaries
| ₹9 L/yr - ₹32 L/yr |
Assistant System Engineer
29.8k
salaries
| ₹2.2 L/yr - ₹5.8 L/yr |
Amazon
Wipro
Infosys
Accenture