i
Tata Projects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed before Nov 2021. There were 2 interview rounds.
We executed a civil engineering project involving construction of a new bridge.
The project involved designing and constructing a new bridge over a river.
We conducted soil tests and analyzed the site to determine the best location for the bridge.
We used advanced software to create 3D models of the bridge and simulate its performance under different conditions.
We worked closely with local authorities and stakeholders to ...
The size of a cube is determined by the length of its sides, measured in millimeters.
A cube has equal sides; if one side is 10mm, all sides are 10mm.
Volume can be calculated as side^3; for a 10mm cube, volume = 1000mm³.
Common sizes include 5mm, 10mm, 20mm, etc., depending on the application.
M20 concrete typically achieves about 70% of its strength in 7 days, approximately 15-17 kN/mm².
M20 grade concrete has a characteristic compressive strength of 20 MPa (20 N/mm²) at 28 days.
After 7 days, M20 concrete generally reaches about 65-70% of its 28-day strength.
This means the nominal strength after 7 days is approximately 13-14 N/mm², or 13-14 kN/mm².
Factors like curing conditions and temperature can affect the
NP2 and NP3 pipes differ in their pressure ratings and applications in construction and plumbing.
NP2 pipes have a lower pressure rating compared to NP3 pipes, making them suitable for less demanding applications.
NP3 pipes are designed for higher pressure applications, often used in water supply and drainage systems.
For example, NP2 pipes might be used for irrigation, while NP3 pipes are used in municipal water supply.
T...
To check anodized aluminum depth, use methods like thickness gauges or chemical tests for accurate measurement.
Use a micrometer or caliper to measure the thickness of the anodized layer directly.
Employ a portable anodizing thickness gauge, which uses eddy current or ultrasonic methods.
Conduct a chemical test using a specific anodizing depth measurement solution that reacts with the anodized layer.
Perform a scratch test...
A toilet bathroom pipeline should have a slope of 1/4 inch per foot for effective drainage.
A slope of 1/4 inch per foot is standard for toilet drain lines.
This slope ensures proper flow and prevents clogs.
For example, a 10-foot pipe should drop 2.5 inches from the toilet to the sewer line.
Too steep a slope can cause waste to flow too quickly, leading to blockages.
posted on 24 Jan 2025
Scaffolding codes are standards set by regulatory bodies to ensure safe construction practices.
Scaffolding codes vary by country and region, but generally include guidelines on materials, design, erection, use, and dismantling of scaffolds.
Common standards include OSHA regulations in the United States, BS EN 12811 in Europe, and AS/NZS 1576 in Australia.
Inspectors must ensure that scaffolding meets these codes to preve
Different types of scaffolding erection include supported scaffolding, suspended scaffolding, mobile scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground.
Suspended scaffolding is hung from the top of a building or structure.
Mobile scaffolding is on wheels and can be easily moved around a worksite.
Aerial lifts are platforms that can be raised and lowered for access t
Safety purchase materials should be durable, high quality, and compliant with safety regulations.
Choose materials that are durable and can withstand heavy loads
Select high quality materials to ensure safety of workers
Ensure that the materials meet safety regulations and standards
Examples of safety purchase materials include high-strength steel, aluminum, and quality wood
Safe erection of scaffolding involves proper planning, training, supervision, and adherence to safety regulations.
Ensure all workers are properly trained in scaffolding erection and safety procedures.
Inspect all components of the scaffolding before erection to ensure they are in good condition.
Plan the erection process carefully, considering factors such as weight capacity, stability, and proximity to power lines.
Use p...
Identifying risks and hazards is crucial for ensuring safety in scaffolding work.
Inspecting scaffolding for stability and structural integrity
Identifying potential fall hazards such as unsecured planks or missing guardrails
Checking for electrical hazards near scaffolding
Assessing weather conditions that could impact scaffolding safety
Ensuring proper training and supervision of workers to prevent accidents
I appeared for an interview in Jan 2025.
Tata Projects interview questions for popular designations
Get interview-ready with Top Tata Projects Interview Questions
I appeared for an interview in Feb 2025.
Company Notice period
I have 8 years of experience in the hospitality industry, including 4 years as a General Manager.
8 years of experience in the hospitality industry
4 years as a General Manager
Strong leadership and team management skills
Proven track record of increasing revenue and customer satisfaction
Experience in budgeting, forecasting, and strategic planning
I chose this company because of its strong reputation in the industry and its commitment to employee development.
Strong reputation in the industry
Commitment to employee development
Opportunities for growth and advancement
Positive company culture
I am looking for a competitive salary that reflects my experience and skills.
Research industry standards for Assistant General Manager salaries
Consider your level of experience and qualifications
Be prepared to negotiate based on the job responsibilities and benefits package
I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.
The load capacity of scaffolding varies depending on the type and materials used.
Load capacity is determined by factors such as the type of scaffolding (e.g. tube and coupler, frame, system), materials used (e.g. steel, aluminum), and design specifications.
It is important to consult the manufacturer's guidelines and engineering calculations to determine the specific load capacity of a particular scaffolding system.
For ...
Hanging scaffolding is erected by attaching the scaffold to a building or structure using suspension ropes or chains.
Inspect the building or structure to ensure it can support the weight of the scaffold
Attach suspension ropes or chains securely to the building or structure
Lower the scaffold platform into position using a hoist system
Secure the platform in place to prevent swinging or movement
Ensure all safety measures ...
Scaffolding material inspection.
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
Renfrusme t ebry thing
I have 5 years of experience in cement plant execution, including overseeing construction, quality control, and project management.
Managed construction projects from start to finish
Implemented quality control measures to ensure compliance with industry standards
Coordinated with various teams to ensure project deadlines were met
Utilized project management tools to track progress and identify areas for improvement
Quality in civil engineering refers to ensuring that construction projects meet specified standards and requirements.
Quality in civil engineering involves ensuring that materials used meet specifications and standards.
It also includes ensuring that construction processes adhere to industry regulations and codes.
Quality control measures such as inspections and testing are used to verify compliance with quality standards...
The duration of Tata Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 558 interviews
Interview experience
based on 5.4k reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹5.8 L/yr - ₹17 L/yr |
Assistant Manager
717
salaries
| ₹4 L/yr - ₹14.8 L/yr |
Manager
413
salaries
| ₹8 L/yr - ₹22 L/yr |
Senior Engineer
388
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Senior Manager
337
salaries
| ₹10.4 L/yr - ₹32.5 L/yr |
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company
KEC International