Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Civil Foreman Interview Questions and Answers for Experienced

Updated 29 Nov 2024

Tata Projects Civil Foreman Interview Experiences for Experienced

1 interview found

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 19 May 2021

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Monster and was interviewed before May 2020. There were 5 interview rounds.

Round 1 - Civil site activity 

(2 Questions)

  • Q1. Earth work activity
  • Q2. Road activity embt. Subgrad bes GSB , wmm DBM
Round 2 - One-on-one 

(3 Questions)

  • Q1. Concrete pouring
  • Q2. Earth work of road
  • Ans. 

    Earth work of road involves excavation, filling, compaction, and shaping of the ground to create a stable foundation for the road.

    • Excavation is the process of removing soil and rocks to create space for the road.

    • Filling involves adding suitable materials like gravel or crushed stones to level the ground.

    • Compaction is essential to ensure the filled materials are tightly packed and stable.

    • Shaping the ground involves grad...

  • Answered by AI
  • Q3. Pedestal j bolting
Round 3 - Group Discussion 

Descusosin of road concreting Massonary work

Round 4 - HR 

(2 Questions)

  • Q1. Noida international airport Noida
  • Q2. Airside Earth work activity
Round 5 - Group Discussion 

Discuss of site civil activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil site working experience

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. What will u do if casing traped after Concreating
  • Ans. 

    If casing gets trapped after concreting, I would follow these steps to resolve the issue.

    • Assess the situation and determine the cause of the casing getting trapped

    • If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools

    • If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out

    • Consult with experienced professionals or engineers fo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Shear ur experience on sight & remember all

Interview Questionnaire 

3 Questions

  • Q1. Salary discussion and finalization
  • Q2. Questions regarding previous experience
  • Q3. Technical codes, Execution

Interview Questionnaire 

1 Question

  • Q1. Concrete mix design,various tests related to aggregate,cement and concrete, supporting system in tunnel,tests conducted in tunnel like pull out test on rock bolt, type of rock bolt

Interview Questionnaire 

2 Questions

  • Q1. How execution and profit shall be manged for company.
  • Ans. 

    Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.

    • Set clear and measurable goals for the company

    • Monitor progress regularly and make adjustments as needed

    • Optimize processes to increase efficiency and reduce costs

    • Make data-driven decisions based on financial and operational data

    • Invest in employee training and development to improve perf...

  • Answered by AI
  • Q2. How will you control man/machine at site.
  • Ans. 

    I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.

    • Implement safety protocols to ensure compliance

    • Provide proper training to all personnel

    • Regularly inspect and maintain equipment

    • Enforce strict adherence to safety guidelines

    • Monitor and evaluate performance regularly

  • Answered by AI

I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1.Techinical questions about bridge construction,prestressed,cantilever,concrete,SAP,shuttering
  • Q2. 2.Site planning
  • Q3. 3. Why we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical & for manager role this is OK

I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What you Know about Rcc structure? And brife describe A complet structure that handle by u with Is Code.
  • Ans. 

    RCC structure is a reinforced concrete structure that uses steel bars to reinforce concrete.

    • RCC structures are commonly used in buildings, bridges, and other structures.

    • The design of RCC structures is governed by various codes such as IS 456:2000.

    • RCC structures are designed to withstand various loads such as dead load, live load, wind load, and earthquake load.

    • The construction of an RCC structure involves various steps...

  • Answered by AI
  • Q2. Asking about safety point and Also Quality point.
  • Q3. Productivity Question.
  • Q4. General Question

Interview Preparation Tips

Interview preparation tips for other job seekers - Shall be have good communication To satff and good knowledge of Structure, productivity and all others related ur Work too.

Interview Questionnaire 

4 Questions

  • Q1. Pls tell about yourself.
  • Q2. On subject matter.
  • Q3. CTC
  • Q4. Close

Interview Preparation Tips

Interview preparation tips for other job seekers - Discuss with confidently and if you haven't answer--- say without hesitation.

Interview Questionnaire 

2 Questions

  • Q1. What's is pqc
  • Ans. 

    PQC stands for Pavement Quality Concrete. It is a type of concrete used for road construction.

    • PQC is a high-quality concrete mix used for the construction of rigid pavements.

    • It is designed to withstand heavy traffic loads and resist wear and tear.

    • PQC is made with a higher cement content and a lower water-cement ratio than regular concrete.

    • It is also reinforced with steel bars or fibers to increase its strength and dura...

  • Answered by AI
  • Q2. What's is tha

I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Swsm project

Interview Preparation Tips

Interview preparation tips for other job seekers - Walk-in interview technical

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Civil Foreman interview for experienced candidates?
Tata Projects interview process for experienced candidates usually has 6 rounds. The most common rounds in the Tata Projects interview process for experienced candidates are Group Discussion, Resume Shortlist and One-on-one Round.
What are the top questions asked in Tata Projects Civil Foreman interview for experienced candidates?

Some of the top questions asked at the Tata Projects Civil Foreman interview for experienced candidates -

  1. Earth work of r...read more
  2. Road activity embt. Subgrad bes GSB , wmm ...read more
  3. Noida international airport No...read more

Tell us how to improve this page.

Tata Projects Civil Foreman Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more
Join Tata Projects Simplify. Create.
Tata Projects Civil Foreman Salary
based on 95 salaries
₹2.9 L/yr - ₹8 L/yr
14% more than the average Civil Foreman Salary in India
View more details

Tata Projects Civil Foreman Reviews and Ratings

based on 35 reviews

4.4/5

Rating in categories

4.3

Skill development

4.2

Work-life balance

4.6

Salary

3.8

Job security

4.5

Company culture

3.9

Promotions

4.3

Work satisfaction

Explore 35 Reviews and Ratings
Deputy Manager
1.2k salaries
unlock blur

₹5.8 L/yr - ₹17.5 L/yr

Assistant Manager
727 salaries
unlock blur

₹4 L/yr - ₹14.8 L/yr

Manager
416 salaries
unlock blur

₹8 L/yr - ₹22 L/yr

Senior Engineer
395 salaries
unlock blur

₹3.5 L/yr - ₹13.5 L/yr

Senior Manager
340 salaries
unlock blur

₹10.4 L/yr - ₹32.5 L/yr

Explore more salaries
Compare Tata Projects with

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

KEC International

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview