Upload Button Icon Add office photos

Tata Power Solar

Compare button icon Compare button icon Compare

Filter interviews by

Tata Power Solar Electrical Site Engineer Interview Questions and Answers

Updated 13 Oct 2024

Tata Power Solar Electrical Site Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Timing:- 45 min (60 Questions)
Topics :- Coding decoding, Seating arrangement, Blood relation, Percentage, probability, Clock, Calendar

Round 2 - HR 

(6 Questions)

  • Q1. Tell me about yourself?
  • Ans. 

    I am a dedicated Electrical Site Engineer with a strong background in electrical systems and project management.

    • Graduated with a degree in Electrical Engineering

    • Experienced in overseeing electrical installations and ensuring compliance with safety regulations

    • Skilled in troubleshooting electrical issues and providing effective solutions

    • Proficient in using AutoCAD and other design software for electrical layouts

    • Excellent...

  • Answered by AI
  • Q2. Final year project
  • Q3. Technical skills
  • Q4. Why you join our company?
  • Ans. 

    I am impressed by your company's reputation for innovation and commitment to excellence in the electrical engineering field.

    • I am attracted to the opportunities for professional growth and development within your organization.

    • Your company's projects align with my passion for cutting-edge technology and sustainable energy solutions.

    • I admire the collaborative work culture and team-oriented approach that your company promo

  • Answered by AI
  • Q5. What is your salary expectation?
  • Ans. 

    My salary expectation is based on my experience, qualifications, and the industry standard for the role.

    • Consider my level of experience and qualifications

    • Research industry standards for Electrical Site Engineers

    • Factor in location and cost of living

    • Be open to negotiation based on benefits package

  • Answered by AI
  • Q6. Any experience?
  • Ans. 

    Yes, I have experience working as an Electrical Site Engineer for 5 years.

    • Worked on various electrical projects including installation, maintenance, and troubleshooting.

    • Managed a team of electricians and ensured projects were completed on time and within budget.

    • Collaborated with architects, contractors, and clients to ensure project requirements were met.

    • Performed regular inspections to ensure compliance with safety re

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - One thing I really tell to job seekers. So many people said that Noukri.com is one of the best platform for job seeker. But I said that don't trust anyone easily because once I had get offer letter from Noukri.com that is Volvo Company offer letter. Then I get call from someone and they told that you can pay 2500 rupees and join the company. That time I wait 1 day then I immediately connect to Volvo company HR from LinkedIn, in offer letter the HR name was there.
so I easily connect them and I get follow back then directly I did message to HR then I said him whole story. They told it is fake offer letter otherwise I loss my money.

So keep patience and forward.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical power
  • Q2. Power plant jankari

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical

Electrical Site Engineer Interview Questions Asked at Other Companies

Q1. What is the maximum range of voltage rating for belted cables are ... read more
Q2. What can protect a cable against mechanical enjury?
Q3. How much torque a synchronous motor can develop?
Q4. What is tranformer? Transformer is a statics device and x-mer wor ... read more
Q5. what is relay and how to work for relay and type of relay.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Introduction

Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About General knowledge Electrical related

Round 2 - Group Discussion 

Projects, HT< line

Round 3 - Technical 

(1 Question)

  • Q1. EHV line & substations & 100MVA transforms, breakers&CT&PT's and Wind power plant related
Round 4 - One-on-one 

(1 Question)

  • Q1. Electrical Techincal wind power plant EHV&HT&BOP related

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir/madam,
I have searching for vacancys

I applied via Company Website and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Types of protection in substation
  • Ans. 

    Substation protection includes overcurrent, earth fault, differential, distance, and backup protection.

    • Overcurrent protection is used to detect and isolate faults caused by excessive current flow.

    • Earth fault protection is used to detect and isolate faults caused by current leakage to earth.

    • Differential protection is used to detect and isolate faults between two parts of a system.

    • Distance protection is used to detect an...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear your basic concept which is related to work experience

I applied via Other and was interviewed in Oct 2018. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. 1. Why you want to change the job?. 2. What's reason for applying here?
  • Ans. 

    I am seeking new challenges and growth opportunities in my career.

    • Seeking new challenges and growth opportunities

    • Looking for a change to broaden my skillset

    • Interested in working with a new team and learning from their expertise

  • Answered by AI
  • Q2. If motor rating is 22 kW so what is fuse rating should be use?
  • Ans. 

    The fuse rating for a 22 kW motor depends on the starting current and the type of motor.

    • The starting current of the motor should be considered when selecting the fuse rating.

    • The type of motor (e.g. induction, synchronous) also affects the fuse rating.

    • Consult the motor manufacturer's specifications or a qualified electrician for the appropriate fuse rating.

    • A general rule of thumb is to use a fuse rating of 125% of the m

  • Answered by AI
  • Q3. Why we use star delta Starter ?
  • Ans. 

    Star delta starter is used to reduce starting current and torque in induction motors.

    • Reduces starting current and torque in induction motors

    • Protects motor windings from damage

    • Increases motor lifespan

    • Used for high power motors

    • Commonly used in industries such as oil and gas, mining, and manufacturing

  • Answered by AI
  • Q4. Unit of vibration
  • Ans. 

    The unit of vibration is Hertz (Hz).

    • Vibration is a measure of the frequency of oscillation of a mechanical or electrical system.

    • Hertz is the unit of frequency, defined as one cycle per second.

    • Vibration can be measured using instruments such as accelerometers and vibrometers.

    • Vibration is an important consideration in the design and maintenance of electrical systems.

    • Examples of electrical systems that may experience vibr...

  • Answered by AI

Interview Preparation Tips

Round: Resume Shortlist
Experience: Knowledge about Industrial Automation like PLC SCADA

General Tips: I was select because one thing I explain in detail. We are all know star delta Stater is use for stating current limit. But why we use delta connected motor .
Skills: Technical Skill, Communication, Decision Making Skills
Duration: 1-4 weeks

I applied via Naukri.com and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

9 Questions

  • Q1. Rankine cycle
  • Q2. Thermodynamics
  • Q3. Electricity
  • Q4. About personal information
  • Q5. How power plant work
  • Ans. 

    Power plants generate electricity by converting various forms of energy into electrical energy.

    • Fuel is burned to produce heat, which is used to create steam.

    • The steam drives a turbine, which powers a generator to produce electricity.

    • Different types of power plants include coal-fired, natural gas-fired, nuclear, hydroelectric, and renewable energy sources.

    • Power plants require regular maintenance and monitoring to ensure

  • Answered by AI
  • Q6. Entropy
  • Q7. Enthalpy
  • Q8. Latent heat
  • Q9. Absolute temperature

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare with basic information of your stream .
Heat
Work
Conductivity

I applied via Recruitment Consultant and was interviewed in Mar 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Basic knowledge about mechanical tools?
  • Q2. Basic knowledge about motors?
  • Q3. Basic about pumps?
  • Q4. Basic about machinery?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and face the answers with your knowledge.

I applied via Naukri.com and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Question-related to substation layout, earthing, GIS, transformers, different Indian and standards and codes.

Interview Preparation Tips

Interview preparation tips for other job seekers - be specific to answers and try to be in short. don't be shy about asking about salary packages ..

I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. They will ask for your previous job profile and basic of electrical. Not much more theoretical, major part is practical

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have a experience in same field you will able to handle questions easi

Tata Power Solar Interview FAQs

How many rounds are there in Tata Power Solar Electrical Site Engineer interview?
Tata Power Solar interview process usually has 1-2 rounds. The most common rounds in the Tata Power Solar interview process are Aptitude Test, HR and Technical.

Tell us how to improve this page.

Tata Power Solar Electrical Site Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 232 Interviews
Adani Group Interview Questions
3.9
 • 200 Interviews
Tata Power Interview Questions
3.9
 • 167 Interviews
Torrent Power Interview Questions
3.7
 • 132 Interviews
Suzlon Group Interview Questions
4.1
 • 131 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Reliance Power Interview Questions
4.1
 • 48 Interviews
Inox Wind Interview Questions
3.7
 • 39 Interviews
Adani Solar Interview Questions
3.9
 • 36 Interviews
L&T Power Interview Questions
3.9
 • 33 Interviews
View all
Tata Power Solar Electrical Site Engineer Salary
based on 9 salaries
₹2.4 L/yr - ₹6.5 L/yr
39% more than the average Electrical Site Engineer Salary in India
View more details

Tata Power Solar Electrical Site Engineer Reviews and Ratings

based on 4 reviews

4.8/5

Rating in categories

4.8

Skill development

4.8

Work-life balance

4.8

Salary

4.8

Job security

4.8

Company culture

4.6

Promotions

4.7

Work satisfaction

Explore 4 Reviews and Ratings
Lead Engineer
233 salaries
unlock blur

₹2.7 L/yr - ₹11 L/yr

Project Engineer
162 salaries
unlock blur

₹1.8 L/yr - ₹9 L/yr

Quality Engineer
83 salaries
unlock blur

₹1.9 L/yr - ₹7.4 L/yr

Store Executive
61 salaries
unlock blur

₹2.7 L/yr - ₹6 L/yr

HSE Officer
57 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Explore more salaries
Compare Tata Power Solar with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

Adani Group

3.9
Compare

Torrent Power

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview