I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
Top trending discussions
I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.
30 mins, basic engineering questions
I applied via Approached by Company and was interviewed in Mar 2023. There were 4 interview rounds.
I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.
Boiler is a device used to generate steam by heating water. Auxiliaries are equipment used to support the boiler.
Boiler is used in industries for various purposes such as power generation, heating, and processing.
Auxiliaries include feedwater pumps, blowdown tanks, deaerators, and economizers.
Feedwater pumps are used to supply water to the boiler, blowdown tanks are used to remove impurities from the boiler water, deae...
Hydrotest is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water or other liquid.
Hydrotest is done to ensure that the vessel or pipeline can withstand the required pressure without leaking or rupturing.
The vessel or pipeline is filled with water or other liquid and pressurized to a level higher than its maximum operating pressure.
The pressure is held for a specified...
Technical questions and apptitude
I am not familiar with the terms kra/kpa, Monthly buying, and DWM.
I apologize, but I am not familiar with those terms.
Could you please explain what they mean?
I am willing to learn and adapt to new concepts and terminologies.
Leet code
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 4 interview rounds.
The power plant process involves converting fuel into electricity through various stages.
Fuel is burned to produce heat
Heat is used to create steam
Steam turns a turbine
Turbine generates electricity
Electricity is sent to the grid for distribution
I applied via Approached by Company and was interviewed in Dec 2018. There were 5 interview rounds.
Individual Components Machine Process Time To Get Cycle Time .
To Delivered Components With SCM Time Study.
To Achieve Cycle Time < Takt Time Individual
Process Step.
Cycle Time is greater than Takt Time.
Cycle Time is the total time taken to complete a process or task.
Takt Time is the available time to complete a process or task.
If Cycle Time is less than Takt Time, it means the process is taking longer than the available time.
This can lead to inefficiencies, delays, and potential bottlenecks in the workflow.
based on 21 reviews
Rating in categories
Assistant Manager
331
salaries
| ₹6 L/yr - ₹15 L/yr |
Field Officer
262
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Senior Engineer
246
salaries
| ₹4 L/yr - ₹10.6 L/yr |
Territory Manager
170
salaries
| ₹5.2 L/yr - ₹10.5 L/yr |
Deputy Manager
161
salaries
| ₹9.4 L/yr - ₹16.4 L/yr |
Mahindra Farm Equipment
Sonalika Tractors
John Deere
Escorts Kubota Limited