Upload Button Icon Add office photos

Filter interviews by

Action Construction Equipment Engineer Interview Questions and Answers

Updated 15 Mar 2025

Action Construction Equipment Engineer Interview Experiences

2 interviews found

Engineer Interview Questions & Answers

user image Anonymous

posted on 15 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview before Mar 2024.

Interview Questionnaire 

5 Questions

  • Q1. Introduce about yourself
  • Ans. 

    I am a passionate engineer with a strong background in software development and a keen interest in innovative technologies.

    • Education: Bachelor's degree in Computer Engineering from XYZ University.

    • Experience: 3 years as a software developer at ABC Corp, focusing on web applications.

    • Skills: Proficient in languages like Python, Java, and JavaScript; experienced in Agile methodologies.

    • Projects: Developed a project manageme...

  • Answered by AI
  • Q2. About job responsibility
  • Q3. What about improvement
  • Q4. Why you want to switch job
  • Ans. 

    I seek new challenges and opportunities for growth that align with my career goals and aspirations.

    • Desire for professional growth: I'm looking for a role that offers more opportunities for advancement, such as leadership positions.

    • Seeking new challenges: My current role has become routine, and I want to tackle more complex projects that push my limits.

    • Alignment with career goals: The new position aligns better with my ...

  • Answered by AI
  • Q5. About quality core tools

Interview Preparation Tips

Interview preparation tips for other job seekers - Advise to deep knowledge about why type of work are you doing still there

Engineer Interview Questions & Answers

user image Anonymous

posted on 4 Mar 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Technical questions and apptitude

Round 3 - Technical 

(1 Question)

  • Q1. What is your kra/kpa, Monthly buying, DWM
  • Ans. 

    I am not familiar with the terms kra/kpa, Monthly buying, and DWM.

    • I apologize, but I am not familiar with those terms.

    • Could you please explain what they mean?

    • I am willing to learn and adapt to new concepts and terminologies.

  • Answered by AI
Round 4 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Full confidence and have to good presence of mind

Engineer Interview Questions Asked at Other Companies

asked in Eaton
Q1. ❖ If a team member is unable to carry out his work, he is doing i ... read more
Q2. What is inheritance? Show me by a code that shouldn't be a pseudo ... read more
asked in Qualcomm
Q3. What is Min-Cut placement algorithm? Given some block sizes, use ... read more
Q4. What is neutonian fluid ? , Stages of fracture, working of engine ... read more
Q5. What is normalization? What do you mean by 1NF, 2NF, 3NF, 4NF?

Interview questions from similar companies

I applied via Approached by Company and was interviewed in Dec 2018. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Question related to your study and working area with deep knowledge .
  • Q2. Iron carbon daigrame .
  • Q3. Heat treatment , composition , matallurgy etc.
  • Q4. Job related and working process related .
  • Q5. Man power realted Capacity related Welding related & situational question.

Interview Preparation Tips

Round: Resume Shortlist
Experience: First devision is mandatory in all pattern .

General Tips: Salary discussion .
Skills: Communication, Problem Solving, Leadership, Presentation Skills, Decision Making Skills
Duration: <1 week

I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Previous Work experience
  • Q2. What is six sigma
  • Ans. 

    Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.

    • Six Sigma aims to achieve a level of quality where the probability of defects is extremely low.

    • It uses statistical analysis to identify and eliminate sources of variation in a process.

    • The methodology follows a structured approach called DMAIC (Define, Measure, Analyze, Improve, Control).

    • Six Sigma is widely used...

  • Answered by AI
  • Q3. What is fishbone diagram
  • Ans. 

    Fishbone diagram is a visual tool used to identify the possible causes of a problem or an effect.

    • Also known as Ishikawa diagram or cause-and-effect diagram

    • Consists of a central spine and branches that represent different categories of potential causes

    • Used in quality control, process improvement, and problem-solving

    • Example: A fishbone diagram can be used to identify the possible causes of defects in a manufacturing proc

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and answer to best of your capability

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Besic knowledge of PLC
  • Q2. Process of the power plan
  • Ans. 

    The power plant process involves converting fuel into electricity through various stages.

    • Fuel is burned to produce heat

    • Heat is used to create steam

    • Steam turns a turbine

    • Turbine generates electricity

    • Electricity is sent to the grid for distribution

  • Answered by AI
  • Q3. PID

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive be true

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. More of my technical

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong in own platform basics. Without base a building can't stay well..

Interview Questionnaire 

1 Question

  • Q1. General deatail, previous job profile,

I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They just asked basics que. related to job profile.. seeking confidence..

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.... should have basic knowledge of process. and knowledege of work and items.. and their costing and commercial terms.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is boiler & auxiliaries
  • Ans. 

    Boiler is a device used to generate steam by heating water. Auxiliaries are equipment used to support the boiler.

    • Boiler is used in industries for various purposes such as power generation, heating, and processing.

    • Auxiliaries include feedwater pumps, blowdown tanks, deaerators, and economizers.

    • Feedwater pumps are used to supply water to the boiler, blowdown tanks are used to remove impurities from the boiler water, deae...

  • Answered by AI
  • Q2. What is hydrotest & methods
  • Ans. 

    Hydrotest is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water or other liquid.

    • Hydrotest is done to ensure that the vessel or pipeline can withstand the required pressure without leaking or rupturing.

    • The vessel or pipeline is filled with water or other liquid and pressurized to a level higher than its maximum operating pressure.

    • The pressure is held for a specified...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best wishes for everyone & prepare best for your interview

Action Construction Equipment Interview FAQs

How many rounds are there in Action Construction Equipment Engineer interview?
Action Construction Equipment interview process usually has 4 rounds. The most common rounds in the Action Construction Equipment interview process are Resume Shortlist, Aptitude Test and Technical.
How to prepare for Action Construction Equipment Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Action Construction Equipment. The most common topics and skills that interviewers at Action Construction Equipment expect are Heavy Fabrication, Inprocess Quality, PDI, Pre Dispatch Inspection and Welding.
What are the top questions asked in Action Construction Equipment Engineer interview?

Some of the top questions asked at the Action Construction Equipment Engineer interview -

  1. What is your kra/kpa, Monthly buying, ...read more
  2. What about improvem...read more
  3. About quality core to...read more

Tell us how to improve this page.

Action Construction Equipment Engineer Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more
Action Construction Equipment Engineer Salary
based on 111 salaries
₹2 L/yr - ₹6 L/yr
35% less than the average Engineer Salary in India
View more details

Action Construction Equipment Engineer Reviews and Ratings

based on 17 reviews

3.2/5

Rating in categories

2.8

Skill development

2.9

Work-life balance

3.8

Salary

2.8

Job security

3.2

Company culture

2.9

Promotions

3.0

Work satisfaction

Explore 17 Reviews and Ratings
Assistant Manager
186 salaries
unlock blur

₹3.2 L/yr - ₹10.4 L/yr

Senior Engineer
124 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Engineer
111 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Deputy Manager
87 salaries
unlock blur

₹6.4 L/yr - ₹13 L/yr

Production Engineer
82 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Action Construction Equipment with

Thermax Limited

4.1
Compare

ABB

4.1
Compare

Isgec Heavy Engineering

3.8
Compare

Kirloskar Oil Engines

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview