The power plant process involves converting fuel into electricity through various stages.
Fuel is burned to produce heat
Heat is used to create steam
Steam turns a turbine
Turbine generates electricity
Electricity is sent to the grid for distribution
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
I appeared for an interview in Dec 2020.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Dec 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Referral and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 5 interview rounds.
based on 18 reviews
Rating in categories
Assistant Manager
206
salaries
| ₹7.8 L/yr - ₹21.9 L/yr |
Senior Engineer
167
salaries
| ₹4.8 L/yr - ₹18 L/yr |
Project Engineer
97
salaries
| ₹1.8 L/yr - ₹8 L/yr |
Engineer
93
salaries
| ₹2 L/yr - ₹10 L/yr |
Applications Engineer
87
salaries
| ₹2.8 L/yr - ₹6.7 L/yr |
John Deere
Cummins
ABB
Caterpillar Inc