Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Thermax Limited Team. If you also belong to the team, you can get access from here

Thermax Limited Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Thermax Limited Engineer Interview Questions and Answers

Updated 30 Nov 2022

Thermax Limited Engineer Interview Experiences

1 interview found

Engineer Interview Questions & Answers

user image Anonymous

posted on 30 Nov 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is boiler & auxiliaries
  • Ans. 

    Boiler is a device used to generate steam by heating water. Auxiliaries are equipment used to support the boiler.

    • Boiler is used in industries for various purposes such as power generation, heating, and processing.

    • Auxiliaries include feedwater pumps, blowdown tanks, deaerators, and economizers.

    • Feedwater pumps are used to supply water to the boiler, blowdown tanks are used to remove impurities from the boiler water, deae...

  • Answered by AI
  • Q2. What is hydrotest & methods
  • Ans. 

    Hydrotest is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water or other liquid.

    • Hydrotest is done to ensure that the vessel or pipeline can withstand the required pressure without leaking or rupturing.

    • The vessel or pipeline is filled with water or other liquid and pressurized to a level higher than its maximum operating pressure.

    • The pressure is held for a specified...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best wishes for everyone & prepare best for your interview

Engineer Jobs at Thermax Limited

View all

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Logical resining test

Round 2 - HR 

(2 Questions)

  • Q1. Personal information
  • Q2. Any questions ......
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Previous experience
  • Q2. Challenges in previous roles
  • Ans. 

    Managing tight project deadlines and coordinating with multiple teams to ensure timely completion.

    • Balancing multiple projects simultaneously

    • Coordinating with cross-functional teams

    • Handling unexpected challenges and changes in project scope

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through your resume and know what the position requires before appearing for the interview understand the business requirements and go through all the past relevant technical coursework

Engineer Interview Questions & Answers

ABB user image Anonymous

posted on 11 Jan 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technically based on skills and experience
Round 3 - Technical 

(1 Question)

  • Q1. Based on core subject

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work with smart work. Get experience from all the sides. Not in limited area.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Case Study 

Problem.solving,design ,concept,product development

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Zakir Husain College of Engineering and Technology, Aligarh and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

It was computerized based

Round 2 - Technical 

(1 Question)

  • Q1. Asked about sensors, micro-controller, project i am working on

I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Besic knowledge of PLC
  • Q2. Process of the power plan
  • Ans. 

    The power plant process involves converting fuel into electricity through various stages.

    • Fuel is burned to produce heat

    • Heat is used to create steam

    • Steam turns a turbine

    • Turbine generates electricity

    • Electricity is sent to the grid for distribution

  • Answered by AI
  • Q3. PID

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive be true

Engineer Interview Questions & Answers

TechnipFMC user image Saifullah Dawood

posted on 17 Jun 2021

I was interviewed in Dec 2020.

Interview Questionnaire 

1 Question

  • Q1. Past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain your role and be strong in your domain
Round 1 - Technical 

(1 Question)

  • Q1. Instrumentation basics

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure, temperature,level,flow

I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Overall engineering knowledge is there or not.
Round 3 - HR 

(1 Question)

  • Q1. Salary and attitude checking will be done.

Interview Preparation Tips

Interview preparation tips for other job seekers - come to interview prepared with company information

Thermax Limited Interview FAQs

How many rounds are there in Thermax Limited Engineer interview?
Thermax Limited interview process usually has 2 rounds. The most common rounds in the Thermax Limited interview process are Resume Shortlist and Technical.
How to prepare for Thermax Limited Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Thermax Limited. The most common topics and skills that interviewers at Thermax Limited expect are AutoCAD, Maintenance, Boiler, Caesar II and Cost Estimation.
What are the top questions asked in Thermax Limited Engineer interview?

Some of the top questions asked at the Thermax Limited Engineer interview -

  1. What is boiler & auxiliar...read more
  2. What is hydrotest & meth...read more

Tell us how to improve this page.

Thermax Limited Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
Thermax Limited Engineer Salary
based on 71 salaries
₹2.1 L/yr - ₹8.7 L/yr
19% less than the average Engineer Salary in India
View more details

Thermax Limited Engineer Reviews and Ratings

based on 29 reviews

3.8/5

Rating in categories

3.8

Skill development

3.7

Work-life balance

3.8

Salary

4.2

Job security

3.8

Company culture

3.4

Promotions

3.7

Work satisfaction

Explore 29 Reviews and Ratings
Engineer Shop QC

Assam site

5-10 Yrs

₹ 2.5-8.65 LPA

Explore more jobs
Shift Incharge
298 salaries
unlock blur

₹2.9 L/yr - ₹8.9 L/yr

Assistant Manager
281 salaries
unlock blur

₹5.8 L/yr - ₹16 L/yr

Electrical Engineer
246 salaries
unlock blur

₹2.4 L/yr - ₹7.2 L/yr

Senior Executive
214 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Control Room Engineer
182 salaries
unlock blur

₹2.5 L/yr - ₹7 L/yr

Explore more salaries
Compare Thermax Limited with

Kirloskar Brothers

3.8
Compare

BHEL

4.1
Compare

Siemens

4.1
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview