i
Thermax Limited
Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
Boiler startup producer is a device used to ignite the fuel and start the combustion process in a boiler.
Boiler startup producer is also known as an ignition system.
It is responsible for producing a spark or flame to ignite the fuel.
There are different types of startup producers such as pilot lights, electric starters, and oil guns.
The type of startup producer used depends on the type of fuel and boiler being used.
Prop...
Draft in a boiler refers to the flow of air or gases through the combustion chamber and flue gas passages.
Draft is created by a difference in pressure between the inside and outside of the boiler.
It is necessary for proper combustion and efficient operation of the boiler.
There are two types of draft: natural draft and forced draft.
Natural draft is created by the buoyancy of hot gases, while forced draft is created by m...
Cooling tower performance is measured by its ability to remove heat from a process stream.
Cooling tower performance is affected by factors such as air flow rate, water flow rate, and temperature difference between the process stream and cooling water.
The efficiency of a cooling tower can be improved by increasing the surface area of the heat transfer media, using a more efficient fan, or optimizing the water distributi...
Pump lineup is crucial for efficient operation. Proper selection and maintenance can improve efficiency.
Pump lineup should be selected based on the required flow rate and head
Centrifugal pumps are commonly used for low viscosity fluids while positive displacement pumps are used for high viscosity fluids
Efficiency can be improved by proper maintenance such as regular cleaning and lubrication
Variable frequency drives can...
I applied via Referral and was interviewed in May 2023. There were 3 interview rounds.
GD &T and basic mechanical engineer
I applied via Naukri.com and was interviewed in Oct 2021. There were 4 interview rounds.
Thermax Limited interview questions for designations
I applied via Company Website and was interviewed before Jul 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Walk-in and was interviewed before Jul 2020. There were 7 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
based on 3 interviews
1 Interview rounds
based on 47 reviews
Rating in categories
Shift Incharge
300
salaries
| ₹2.7 L/yr - ₹10.2 L/yr |
Assistant Manager
277
salaries
| ₹5.8 L/yr - ₹16 L/yr |
Electrical Engineer
231
salaries
| ₹2.4 L/yr - ₹7.2 L/yr |
Senior Executive
211
salaries
| ₹4 L/yr - ₹11 L/yr |
Control Room Engineer
196
salaries
| ₹2.5 L/yr - ₹7 L/yr |
John Deere
Cummins
ABB
KONE