Filter interviews by
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 5 interview rounds.
I appeared for an interview in May 2023.
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
It depends on the region, for me they conducted tool test in the 1st round.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.
The manufacturing of cement involves chemical reactions with water, resulting in the durability of concrete.
Cement is made by heating limestone, clay, and other materials in a kiln
The chemical reaction between cement and water, known as hydration, results in the hardening of concrete
The durability of concrete depends on factors such as the water-cement ratio, curing time, and quality of materials used
Calculate deflection at free end of cantilever beam with point load at end
Use the formula: δ = (PL³)/(3EI)
P is the point load at the end
L is the length of the cantilever beam
E is the modulus of elasticity of the beam material
I is the moment of inertia of the beam's cross-sectional area
Example: A steel cantilever beam with a length of 2 meters and a point load of 500 N at the end has a deflection of 0.104 mm
Camber is the slope provided to the road surface to drain off rainwater. It is achieved by raising the center of the road surface.
Camber is the curvature provided to the road surface to ensure proper drainage of rainwater.
It is achieved by raising the center of the road surface.
The amount of camber depends on the width of the road and the expected rainfall.
The steps for the construction of a road include surveying, cle...
Admixtures are chemicals added to concrete to enhance its properties. They affect the workability, strength, and durability of concrete.
Admixtures are added to concrete to improve its quality and performance.
They can affect the setting time, workability, strength, and durability of concrete.
Examples of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers.
Hoop stress is the stress exerted circumferentially in a cylindrical or spherical object. Reinforcement in a dome can be provided by using steel bars or mesh.
Hoop stress is caused by the pressure inside the object and is calculated using the formula P*r/t, where P is the pressure, r is the radius, and t is the thickness of the object.
In a dome, reinforcement can be provided by using steel bars or mesh that are placed i...
Estimation and costing involves calculating the expenses of a project. No. of bricks required in 1 m3 of brickwork depends on the size of the bricks. There are various types of contracts in construction.
Estimation and costing involves calculating the expenses of a project, including materials, labor, and other costs.
No. of bricks required in 1 m3 of brickwork depends on the size of the bricks used. For example, if stan...
based on 1 interview
Interview experience
Structural Engineer
33
salaries
| ₹5.2 L/yr - ₹12.3 L/yr |
Architect
31
salaries
| ₹3.2 L/yr - ₹10 L/yr |
CAD Technician
26
salaries
| ₹3.2 L/yr - ₹7.5 L/yr |
Section Engineer
24
salaries
| ₹8.5 L/yr - ₹22 L/yr |
Site Engineer
23
salaries
| ₹5 L/yr - ₹11 L/yr |
AECOM
Jacobs Engineering Group
WSP
Parsons Corporation